CHAPTER II - A & B

2.0. REVIEW OF OVERALL PERFORMANCE

2.1. A REVIEW OF PERFORMANCE DURING 8TH FIVE YEAR PLAN AND GOALS SET FOR THE 9TH PLAN

(1) The Ministry of Environment & Forests was allocated an outlay of Rs. 1200 crores for its 8th Plan 1992-97. The actual expenditure in 1992-93 was Rs.274.67 crores, in 1993-94 it was Rs.303.52 crores, in 1994-95 Rs.328.25 crores, in 1995-96, Rs.296.66 crores and in 1996-97 it was Rs.428.85 crores, making a total of Rs. 1631.93 crores. The sectorwise and year wise details of outlays/expenditure as follows:

Table-A: Sector wise/Year wise approved Outlays & Expenditure under VlIlth Plan.

(Rs. in crores)

Sector

8th Plan

Outlay

Original

Outlay

1992-

93

Expdt.

92-93

Outlay

93-94

Expdt.

93-94

Outlay

94-95

Expdt.

94-95

Outlay

95-%

Expdt.

95-%

Outlay

96-97

Expdt.

96-97

1

2

3

4

5

6

7

8

9

10

11

12

Environment

325

48.00

45.09

70.00

71.15

79.00

103.52

80.00

63.00

125.00

124.18

NRCD

350

55.00

54.19

65.00

64.91

78.00

31.34

79.00

42.09

106.00

121.53

NAEB

275

115.00

114.45*

98.00

90.33

103.00

103.13

104.00

93.18

90.00

87.55

Forests & Wildlife

250

62.00

60.92

85.00

77.13

100.00

90.26

107.50

98.37

148.40

95.58

Total

1200

280.00

274.67

318.00

303.52

360.00

328.25

370.50

296.64

469.40

428.84

* During 1992-93, the then National Wastelands Development Board was bifurcated into two separate Boards. NWDB was transferred to Department of Wastelands Development and NAEB was retained in Ministry of Environment & Forests. The allocation of Rs. 115.00 crores was for both the boards. 'Me expenditure of Rs. 114.48 crores relates to both the Boards. Expenditure under NAEB was Rs.72.736 crores during 92-93.

Table-B: Sectorwise Plan outlay&Expenditure in percentage under the VIIIth Plan

(Rs. in crores)

Sector

8th Plan

Outlay

Original

Total Outlay

revised

Total

Expdt.

Allocations

(% increase over

original outlay)

Expdt.

(% increase over

original outlay)

1

2

3

4

5

6

Environment

325.00

402.00

406.95

23.69

25.21

NRCD

350.00

383.00

314.07

9.42

(-)10.27

NAEB

275.00

510.00

488.64

85.45

77.68

Forests & Wildlife

250.00

502.90

422.24

101.16

68.90

Total

1200.00

1797.90

1631.90

49.82%

36%

Notes:

  1. Increase in outlays/expenditure over original approved Plan outlay in case of NAEB is due to the fact that the major schemes of NAEB were got approved from CCEA at enhanced outlays for 8th FYP so as to increase area coverage under afforestation/eco-development activities.
  2. Increase in outlays/expenditure over original approved Plan outlay in case of Environment is due to the fact that yearwise outlays for certain schemes like Environmental Impact Assessment, Industrial Pollution Control Project, Conservation & Survey etc. were approved by Planning Commission at increased levels.
  3. Increase in outlays/expenditure over original approved Plan outlay in case of Forest & Wildlife is due to the fact that the major schemes like World Bank aided Forestry Research Education Extension Scheme of ICFRE, Eco-Development in and around Protected Areas, Project Tiger, Development of National Parks and Sanctuaries, Project Elephant etc. were approved at enhanced level in VIII Plan due to increased activities.
  4. Under NRCD, during VIIIth Plan, except GAP Phase I which was 100% central funded, all schemes are implemented on a 50:50 sharing basis.

2.2. OUTLAY FOR THE NINTH PLAN AND ANNUAL PLANS 1997-98 AND 1998-99

Overall Plan outlay/expenditure

sectorwise

(Rs. in crores)

Year

Environment

NRCD

Forests &

Wildlife

NAEB

Total

9th Plan approved outlay

875.50

693.80

868.20

735.00

3172.46

1997-98

Outlay

198.00

109.00

144.70

92.00

543.70

Expenditure

123.49

99.43

112.55

68.30

403.65

           

1998-99

Outlay

210.91

191.70

209.13

35.00

704.09

NRCD - National River Conservation Directorate

NY&B - National Afforestation and Eco-Development Board.

3.0.1. The scheme wise details of outlay, expenditure, physical targets and achievements during the 8th Plan period in all the sectors as above, and, the outlay and the goals set for 9th Plan are as below:

3.0.2. FORESTRY AND WILDLIFE

3.0.3. INDIRA GANDHI NATIONAL FOREST ACADEMY (IGNFA), DEHRA DUN

The IGNFA is responsible for in-house training for Indian Forest Service Probationers. Its achievements during the VIII Plan and goals for the IX Plan are as under:

(Rs. in lakhs)

Programme

VIII Plan Outlay

Expenditure

Physical Targets

Achievements

9th Plan Outlay

Goals set for 9th Plan

Training of IFS Probationers

703

703.19

*

Fully Achieved

1050

**

* Training of 230 IFS Probationers recruited from 1992-97

10 Compulsory courses for in-service IFS officers.

1 Induction Training Programme with 26 participants.

** Training of 150 IFS Probationers.

Upgradation of computer lab and improvement of infrastructural facilities in class-rooms, library, hostel, etc.

Construction of pavilion.

3.0.4. STATE FOREST SERVICE AND RANGERS COLLEGES

This Institute caters to the training requirement of SFS Officers of different States. Its achievements during the VIII Plan and goals for the IX Plan are as under:

(Rs. In lakhs)

S.

No.

Programme

VIII

Plan

Outlay

Expenditure

Physical

Targets.

Physical

Achieve-

ments

Ninth

Plan

Outlay

Goals set for

Ninth Plan

SFS &

Rangers

Colleges

405.00

396.93

600.00

1 .

Training of SFS

Officers

15 courses

12

courses

15 courses

2.

Training of

Forest Rangers

5 courses

5 courses

3.

Special

Refresher

Course for In-

service SFS

Officers

59 courses

59

courses

55 courses

4

Course on

Computer

Application in

Forestry for In-

service SFS

Officers

17 courses

17

courses

34 courses

5.

Other Courses

   

3 courses

courses

 

courses

3.0.5. INDIAN INSTITUTE OF FOREST MANAGEMENT (HIM), BHOPAL

IIFM, Bhopal is an autonomous Institution under the Ministry established for the development of managerial capacity in the forestry sector. Its achievements during VIII the Plan and goals for the Ninth Plan are as under:

(Rs. In lakhs)

S.

No.

Programme

VIII

Plan

Outlay

Expdt.

Physical

Targets.

Physical

Achievem

ents

Ninth

Plan

Outlay

Goals set for

Ninth Plan

 

IIFM

650.00

1033.84

   

1450.00

 

a)

Management

Development

Programme

(MDP)/

Courses &

Seminars

MDP

Courses-

109,

MDP

Courses 79

13 1 MDP and 19

Workshops

b)

Post-Graduate

Diploma in

Forestry

Management

(PGDFM)

PGDFM

5 batches

PGDFM

5 batches

Every year 35

Students in

PGDFM, 5 seats

to SAARC

Students, 5 seats

for foreign

NationalsNRIs,

c)

M.Phil level

Course on

Resource

Manage-ment

(MRM).

MRM

3 batches

MRM

3 batches

20 persons in

MR.M.

Ph.D.programmes

l0numbers

3.0.6. INDIAN COUNCIL OF FORESTRY RESEARCH & EDUCATION (ICFRE), DEHRADUN.

This is an autonomous body under the Ministry for research and education activities relating to forestry. It has 8 institutes and 3 satellite centres spread all over the country. Its achievement during VIII Plan and goals for Ninth Plan are as under:

(Rs. in lakhs)

S.No.

Programme

VIII Plan

Outlay

Expenditure

Physical

Target/

Achievements

Ninth

Plan

Outlay

Goals for

Ninth

Plan

1

Research

a) General

Component

9000.00

11044.00

*

22500.00

**

b) Externally Aided

Component

9000.00

5669.00

2

Education &

Training

400.00

449.00

*

1,000.00

**

* ICFRE provides technical advice to the Ministry on forestry related matter. It also provides education under forestry, related matters through various PG Diploma Courses and award fellowships and research associateship. The relevant extension materials and important research findings were published and preparation of slides and films were carried out. Some of the important studies done by the institutes under ICFRE are as under:

Studies were conducted on wood properties gluing technology, preservation treatment, etc. in Forest Research Institute, Dehradun.

Studies on Reproductive Biology, genetic improvement and mass multiplication of important tree species were conducted in Institute of Forest Genetics and Tree Breeding, Coimbatore.

Provenances trials in-vitro propagation of sandal were carried out in Institute of Wood Science and Technology, Bangalore.

Collection and evaluation of Germ plasm of important non-timber forest products was made in Tropical Forest Research Institute, Japalpur.

Soil water plant relationship were studied and moisture stress tolerance levels for various species evaluated in Arid Forest Research Institute, Jodhpur.

Some of the important studies to be taken up by the Institutes of ICFRE during IX Plan are as under:

Tree improvement and breeding programme in Forest Research Institute, Dehradun.

Reproductive Biology Breeding System studies in Institute of Forest Genetics and Tree and Tree Breeding, Coimbatore.

Studies on wood anatomy and development of computer assisted wood identification methodologies would be undertaken in Institute of Wood Science & Technology, Bangalore.

Evaluation of species for leaf fodder improvement will be undertaken in Arid Forest Research Institute, Jodhpur.

Species of Bamboos will be studied in Institute of Rain and Moist Deciduous Forest Research, Jorhat.

Studies on Cold Desert afforestation, regeneration of temperate forests and agro-forestry systems for lower hills will be undertaken in Himalayan Forest Research Institute, Shimla.

3.0.7. INDIAN PLYWOOD INDUSTRIES RESEARCH & TRAINING INSTITUTE (IPIRITI), BANGALORE

This Institute under the Ministry is a centre of expertise in the mechanical wood industries sector. Its achievement during VIII Plan was as under:

(Rs. in lakhs)

S.

No.

Programme

VIII Plan

Outlay

Expdt.

Physical

Targets/

Achievements

Ninth

Plan

Outlay

Goals set for Ninth Plan

I

JPIWTI

216.00

221.00

*

350.00

Improvement in qualities

and performance of

particle boards, etc.

*The Institute's Research & Development focus during VIII Plan period was on the following key areas:

Optimum utilisation of small diameter logs in the production of timber and plywood.

Formulation of adhesives replacing non-renewable with renewable materials.

Development of economical methods to treat wood and wood based panels with preservatives.

Evaluation and standardization of plywood woods for engineering applications.

4.0 SURVEY AND UTILISATION OF FOREST RESOURCES

4.0.1 FOREST SURVEY OF INDIA (FSI):

The FSI is responsible for survey and utilisation of forest resources in India and its achievements during the VIII Plan and outlay proposed for the IX Plan are as under:

(Rs. In lakhs)

S.No.

Programme

V111 Plan Outlay

Expenditure

Ninth Plan Outlay

1

Application of Remote Sensing Techniques in Survey of Forests.

1921

1379

2500

The physical targets and achievements of FSI during the VIII Plan and the goals set for the IX Plan are as under:

S.

No.

Programme

Units

Physical

Targets

Physical

Achievements

Goals for Ninth

Plan

1

Forest Inventory

Area in Sq. Km.

1,27,057

1,67,571

1,25,000

2.

Data Processing

-do-

1,20,043

1,50,551

1,25,000

3.

Thematic Mapping

1:50,000 scale

1,300

1301

1300

4.

Vegetation Mapping

1:250,000 scale

909

911

907

5.

Training

No. of Persons

Trained

420

613

450

6.

Special Study

 

12

13

20

4.02 FOREST CONSERVATION

 

Under the Scheme "Strengthening of Forestry Division", seven Regional Offices are implementing the Forest Conservation Act and monitoring of environmental clearances accorded by the Ministry under Environment Protection Act. The physical and financial achievements during the VIII Plan and goals set for IX Plan are as under:

 

(Rs.in lakhs)

S. No.

Programme

Physical Targets

Achiev ement

Vill Plan Outlay

Expdt.

Ninth Plan Outlay

Goals set for Ninth Plan

I

Strengthening of Forest

   

955.00

956.00

2500.00

 
 

Division:

           
 

a) Monitoring of Forest Conservation Projects/Cases

4370

4094

     

4750

 

b) Monitoring of Environment Clearance Projects/Cases

2140

2527

     

2200

 

4.03 FOREST PROTECTION AND REGENERATION

 

The Scheme "Association of Scheduled Tribes and Rural Poor in Regeneration of Degraded Forests:" was started in 1992-93 on pilot basis with 37 projects in 9 States, namely, Andhra Pradesh, Bihar, Gujarat, Madhya Pradesh, Maharashtra, Rajasthan, Orissa, West Bengal and Karnataka. Its achievement during the VIII Plan and goals set for the IX Plan are as under:

(Rs.in lakhs)

 

Programme

VIll Plan Outlay

Expendi ture

Physical Targets

Physical Achieve ments

Ninth Plan Outlay

Ninth Plan Physical Target

Association of Scheduled Tribe & Rural Poor

735.00

735.56

10,550 ha. Rehabilitation of degraded forest lands

10,205 ha

l500.00

15600 ha. Rehabilitation of degraded forest land

 

During the VIII Plan, a Central Sponsored Scheme, "Modem Forest Fire Control Methods in India" was continued. The Scheme was launched during the VII Plan with UNDP assistance as a pilot project in Uttar Pradesh and Maharashtra mainly to protect forests from fire. The project was implemented in 13 States during VIII Plan. Its achievement during the VIII Plan and goals set for IX Plan are as under:

 

(Rs.in lakhs)

 

Programme

VIll Plan Outlay

Expdt.

Physical Targets

Physical Achieve ments

Ninth Plan Outlay

Goals set for Ninth Plan

Modern Forest Fire Control Methods in India

737.00

737.00

To assist 13 States to develop necessary infrastructure to control forest fire.

13 States were assisted.

1500.00

To assist all States/UTs to develop necessary infrastructure to control forest fire

 

5.0 WILDLIFE

 

5.0.1 Ministry of Environment & Forests oversees implementation of Wildlife (Protection) Act, provides assistance to State Governments for development and protection of National Parks and Wildlife Sanctuaries and deals with matters relating to Wildlife Institute of India (WII), Dehra Dun and Convention on International Trade in Endangered Species (CITES).

 

5.0.2. WILDLIFE INSTITUTE OF INDIA (WII)

 

WII was established in 1982 under the erstwhile Ministry of Agriculture and Cooperation and subsequently brought under the Ministry of Environment and Forests. The main mandate of the Institute is to impart training to government and non-government personnel to carry out research and advise on matters of conservation and management of wildlife resources. In April, 1986, autonomous status was granted to this Institute for developing its professional role in biodiversity conservation for South and South East Asian Region.

 

The Institute conducts three principal courses viz., the 3 months' certificate, the 9" months' diploma and 2 years M.Sc. in Wildlife Biology on a regular basis.

 

During 8th Plan about 370 students/Forest Officers/others were trained by W11 in different courses conducted by it. Its achievements during 8 1h Plan and goals set for 9' Plan are given below:

 

(Rs.in crores)

 

Programme

8th Plan Outlay

Expend iture

Physical targets (no. of persons)

Achievemen ts (no. of persons)

9" Plan Outlay

Goals set for 9th Plan.

Wil

17.57

16.21

   

25.00

 

a) M.Sc. courses in Wildlife Sciences

   

50

26

 

50

b) P.G. Dip. Course in Wildlife Manage-ment.

   

150

86

 

150

c) Certifi-cate Course in Wildlife Manage-ment.

   

150

83

 

150

d) Field Workshop/ Short Courses

300

300

 

5.0.3 STRENGTHENING OF WILDLIFE DIVISION AND CONSULTANCIES FOR SPECIAL TASKS

 

The Scheme was started from 1986 with activities like Strengthening of Wildlife Division and Regional Offices in Delhi, Mumbai, Calcutta and Chennai with adequate manpower and development of infrastructure for better enforcement of Wildlife (Protection) Act, CITES. etc. Three sub-regional offices at Guwahati, Amristar (shifted from Pathankot) and Cochin were started.

 

The achievement of the Scheme during the VIII Plan and Goals set for the IX Plan are as under:

 

(Rs. in lakhs)

 

Scheme

8" Plan Outlay

Expdt.

Physical Targets/ Achievements

9" Plan Outlay

Goals set for 9" Plan.

Strengthening of Wildlife Division

350.00

271.00

 

600.00

To provide funds for Regional Offices, Central Wildlife Division and Consultancies for Special Tasks.

 

*Establishment expenses, Office Expenditure, Domestic Travel Expenses, of Central Wildlife Division and Regional Offices are being paid from the Scheme. Funds are also provided for conduct of consultancies in wildlife management for special tasks and assistance is given as and when there is a proposal for the same.

 

6.0 NATIONAL PARKS AND SANCTUARIES

 

6.0.1. The Objective of the Scheme is to assist the State governments and UTs in the development of their National Parks and Sanctuaries and encourage them to extend protected area network. The Scheme provides financial assistance for habitat development of Wildlife and Biodiversity Conservation, to create infrastructure facilities for better protection and management. 100% assistance is provided under this Scheme for identified items of nonrecurring expenditure in case of National parks and Sanctuaries. 50% assistance is also provided in respect of certain identified recurring items of expenditure in respect of National Parks only.

 

Its achievement during the 81 Plan and goals set for the 9" Plan are as under:

 

(Rs.in crores)

 

Scheme

8" Plan

Outlay

Expend

iture

Physical

Targets

Achieve-

ments

9" Plan

Outlay

Goals set for 9" Plan.

Development of National Parks and Sanctuaries.

49.50

49.50

250 National Parks and Sanctuaries to be covered and provided assistance.

220* National Parks and Sanctuaries were provided assistance.

110.00

To provide financial assistance to all National Parks and Sanctuaries in States/UTs for protection of endangered species and Conservation of Wildlife.

 

* Shortage of funds was the constraint for achieving full target.

 

7.0 CENTRAL ZOO AUTHORITY (CZA)

 

7.0.1. The Central Zoo Authority (CZA) was constituted by the Government of India in February, 1992 with a view to enforce minimum standards for upkeep and health care of animals in zoos. This was done through an amendment of the Wildlife (Protection) Act, 1972.

 

The achievements of CZA during the VIII Plan and goals set for the IX Plan are as under:

 

(Rs.in lakhs)

 

Eighth Plan Outlay

Expenditure

Physical Targets/Achievements

Ninth Plan Outlay

Goals set for Ninth Plan

1200.00

1200.00

*

3000.00

**

*Rs.948.36 lakhs were released to various Zoos as approved by CZA. All large, medium, small, mini and mobile zoos were evaluated. Training courses for Zoo Directors and Zoo Keepers were organised at various places. Workshops were organised. Zoo Directors and Veterinarians were sent for training at Wildlife Preservation Trust at Jersey, U.K. 2 research projects were awarded to CCMB for DNA finger printing of wild animals and semen and Geo-preservation of Spermatozoa of Indian Wild Animals.

 

** Grants to zoos for improvement of animal enclosures/upgradation of upkeep/health care, awareness, etc. Creation of centre for conservation of endangered species. Education and awareness of programmes through NGOs. Construction of office building of CZA. Creation of rescue centres for animals at each zone.

 

8.0 ANIMAL WELFARE BOARD OF INDIA (AWBI)

 

8.0.1. Various animal welfare organisations along with the Board take steps to generate public awareness, AV%TBI receives grants-in-aid from Government of India and in turn provides assistance to various organisations in the country for rescue/shelter homes, animal birth control, vehicles, medicines and veterinary care, etc. AWBI also imparts training to representatives of various Animal Welfare Organisations and public in animal care, laws and various other disciplines. Its achievements during the VIII Plan and goals set for the IX Plan are as under:

(Rs.in lakhs)

 

VIII Plan outlay

Expdt.

Physical Target/ achievements

Ninth Plan outlay

Goals set for Ninth Plan

650.00

639.65

 

2000.00

 
   

*

 

Number of trainers 150. Number of Hon. Animal Welfare Officers 12000. Number of training centres 1000.

   

*

 

Rescue home for animals - Number of organizations to be

benefited 300.

   

*

 

ABC operations 100000.

Number of Centres 30.

       

Construction of office building of AWBI.

       

Research & Development.

 

Physical Targets

 

a) Humane Education

b) Rescue home for animals including water troughs and water facilities.

c) Animal birth control operations (ABC)

Achievements

 

a) Number of trainers 97. Number of Honorary Animal Welfare Officers 9500. Number of Training Centres 600.

b) Number of organisations benefited 250.

c) Number of operations 70,000. Number of centres 20.

 

9.0 PROJECT TIGER (PT)

 

9.0.1 The Centrally Sponsored Plan Scheme 'Project Tiger' was launched on Ist April, 1973. Initially, nine tiger reserves were created. Presently, there are 23 tiger reserves in 14 States covering an area of over 33,000 sq. kms.

 

The achievements of the Scheme during the VIII Plan and goals set for the IX Plan are as under

 

(Rs. in crores)

 

Scheme

8th Plan

Outlay

Expdt.

Physical

Targets

Physical

Achievem

ents

Ninth

Plan

Outlay

Goals set for Ninth

Plan.

Project Tiger

40.00

38.90

To assist Tiger Reserves for conservation and protection of tigers habitat improvement, forest protection, construction of staff quarters, office building, wireless network, etc.

Central assistance was given to 13 Tiger Reserves against targets fixed

75.00

New Tiger reserves are to be identified and included in the Project Tiger scheme. Creation of Strike Force in each Tiger Reserve. Area to be covered is proposed to be extended from 33,000 sq. kin to 60,000 sq. km.

 

  1. PROJECT ELEPHANT

 

The Scheme was started in 1991-92.. The achievement during the VIII Plan and goals set for the IX Plan are as under:

 

(Rs. in crores)

 

Scheme

VIII Plan Outlay

Expdt.

Physical Targets

Physical Achieve ments

Ninth Plan outlay

Goals for the Ninth Plan.

Project Elephant.

23.00

19.51

To assist 12 States for Conservation of elephants, habitat development, etc.

Assisted 13 States for conservation of elephants.

40.00

To assist 12 States for conservation of elephants.

 

11.0 ECO-DEVELOPMENT SCHEME IN AND AROUND PROTECTED AREAS:

 

11.0.1 The objectives of the Scheme is to provide alternative sources of sustenance to the communities on the fringes of National Parks and Sanctuaries and to improve the ecological productivity of the buffer zones of Protected Areas through the introduction of sustainable economic activities and also to provide assistance for preparation of plans for eco-development, soil conservation, alternative energy sources, efficient utilisation of biomass, etc.

 

Its achievement during the 81h Plan and goals for the 9" Plan are as under:

(Rs in crores)

 

Scheme

8" Plan Outlay

Expdt.

Physical Targets

Achievements.

9th Plan Outlay

Goals set for 9th Plan

Eco-development Around Protected Areas

23.80

2.36

80 national parks and Sanctuaries and 23 Project Tiger areas to be covered.

70 national parks and Sanctuaries and 23 Project Tiger areas covered under the scheme

205.00 (including externally aided component)

80 national parks and Sanctuaries and 18 Project Tiger areas will be covered (excluding 5 Tiger Reserves being assisted under the Externally Aided Scheme)

India: Eco0development Project

6.16

22.20

The Project Preparation Facility funds of US$2 million was provided as loan by IDA to take up demonstration activities viz. Improved management, village eco-development, environment education awareness campaign, etc., in 7 protected areas where the main scheme would be implemented during the 9th plan.

Infrastructure development facilities were taken up in the Central Coordination Unit in the PT division in the Ministry. Concerned State Govts. Were provided assistance for taking up development activities in the protected areas.

 

The Project agreement was signed on 30/9/96 and became effective from 27/12/96. The Project will be implemented by the concerned States to achieve improved protected area management, village eco-development, environmental education awareness campaigns, etc. in the 7 identified areas viz. Gir, Nagarhole, Ranathambore, Periyer, Buxa, Palamau and Pench.

11.0.2 BENEFICIARY ORIENTED SCHEME FOR TRIBAL DEVELOPMENT:

 

11.0.3 The Scheme was launched during 1989-90 with an objective of rehabilitation of tribal families affected under the relocation plan of national parks and sanctuaries including project tiger reserves. The achievement during the VIII Plan and goals set for the IX Plan are as under:

 

(Rs in crores)

 

Scheme

V111 Plan

Outlay

Expdt.

Physical

Targets

Physical

achievements

Ninth

Plan

outlay

Goals set for

Ninth Plan.

Beneficiary Oriented Scheme for Tribal Development

3.50

2.30*

Relocation of tribal families outside the protected areas.

 

Out of 423 tribal families proposed for relocation outside the protected areas, relocation of 188 families completed.

10.00

1000 tribal families are proposed to be relocated outside protected areas.

 

There were less number of proposals received from State Govts.

 

12.0 NATIONAL ZOOLOGICAL PARK, NEW DELHI

 

12.0.1 The Scheme is being continued since 1955-56 with the object of conserving and breeding rare and endangered animals, to conduct research regarding behaviour, reproduction and. nutrition,, to educate and entertain people about preservation of wildlife. It also provides assistance and guidance to other zoos in the country.

 

During VIII Plan, against the target of Rs. 195 lakhs for developmental work in the NZP, Rs.99 lakhs were spent. 28 construction/development works were completed. Ninth Plan outlay for NZP is Rs. 4 crores. Various construction/development works will be undertaken.

 

13.0 NATIONAL AFFORESTATION & ECO-DEVELOPMENT BOARD

 

13.0.1 The National Afforestation & Eco-Development Board (NAEB) was set up in August 1992. Its main functions are:

 

(a) Ecological restoration of degraded forest areas and adjoining lands

(b) Research and extension of research findings to disseminate new and proper technologies;

(c) Create general awareness to foster a people's movement for promoting afforestation and eco-development

 

Targets/achievements of NAEB is given as under :-

 

(Rs in crores)

 

Scheme/Activity

8th

Plan

Outlay

Financial

Achieve-

ments for

8th Plan

Physical Targets

for 8th Plan

Physical

Achievements

for 8th Plan

IXth Plan

outlay

Goals set for

IXth Plan

Integrated Afforestation and Eco- Development Projects scheme

200.00

203.12

2,65,00b ha.

2,98,981

334.00

2,15,000 ha.

Fuelwood/Fodder Projects Scheme

158.00

154.19

3,06,000 ha.

4,01,648

230.00

3,68,500 ha.

Non-Timber Forests Produce (including Medicinal Plants) Scheme

55.00

56.47

1,00,000 ha.

1,08,000

120.00

74,000 ha.

Seed Development Scheme

9.00

7.81

 

25 States assisted

14.00

All States to be assisted

Grants-in-Aid Scheme (for Voluntary Agencies)

9.50

7.51

 

338 Projects sanctioned

12.00

NGO projects to be sanctioned

Aerial Seeding Scheme

6.00

2.49

This scheme is in abeyance since 1994-95

     

20 Point Programme

           

a) Seedling Distribution

   

625.85 crores

557.90 crores

   

b) Area coverage Others

   

5522201 ha.

5067031 ha.

   

 

14.0 BOTANICAL SURVEY OF INDIA (BSI)

(Rs. in lakhs)

 

Schemes

VIII Plan

Outlay

Expdt.

Physical

Targets

Physical

Achievements

Ninth

Plan

Outlay

Goals set for Ninth

Plan

Botanical Survey of India

 

 

a) Survey of Natural Resources

1241.00

1174.8

 

 

 

 

207

 

 

 

 

135

3200.00

Survey of Natural Resources. Survey of endangered species. Scientific evaluation of selected useful plants, etc. Publication Listing of live specimen collection

b) Enda

ngered Species

   

790

610

   

c) Scientific evaluation of selected useful plants

14

10

d) National database of type specimen.

   

2770

2770

   

e) Listing of Live Specimen Collection

   

15,200

15045

   

f) Publication.

   

17

31

   

 

15.0 ZOOLOGICAL SURVEY OF INDIA (ZSI)

 

(Rs. in lakhs)

 

Scheme

VIll Plan Outlay

Expen diture

Physical Targets

Physical Achievements

Ninth Plan Outlay

Goals set for Ninth Plan

Zoological Survey of India:

Exploration and Survey of State and Ecosystem Fauna.

1183.00

1230.00

 

8 States (district- wise) 6 major ecosystems 15 conservation areas (including Tiger Reserves and 10 wetlands.

 

326 surveys undertaken in 8 States (60 districts) 6 major ecosystems, 15 conservation areas and 10 wetlands.

 

 

8 States, 7 ecosystems, 20% of total conservation areas will be surveyed.

Status survey of endangered species

   

13 species of mammals

Survey of 11 species completed, 2 species partially completed.

 

20 species

Taxonomic/ecological studies of State and ecosystem fauna

   

5 states, 2 estuaries, 2 wet-lands and 7 conser vation areas including 6 Tiger Reserves.

4 States, 2 estuaries, 2 wetlands and 6 conservation areas completed and I State and I conservation area partially completed.

 

6 States and 5 ecosystems.

Computerisation of data.

   

Types and other Registered collections.

46,000 type data and 8000 data of other registered collections computerised.

 

Type data and general collections.

Training and extension Programme

   

7

7

 

7

EIA Studies with regard to Fauna

   

As and when assigned

33

 

As and when assigned.

 

16.0. ENVIRONMENTAL EDUCATION, AWARENESS& TRAINING

(Rs. in crores)

 

Scheme/Activity

8th Plan Outlay

Expdt.

IX Plan

Outlay

1) Environment Education & Training

17.65

15.09

23.00

2) Grants-in-Aid to professional institutions

0.50

0.227

0.50

3) Paryavaran Vahinies (Part of PSP)

4.002

0.9171

1.50

4) Seminars[Workshops/Symposia

1.40

0.8941

1.5

5) ENVIS

5.50

5.81

7.50

6) NNRMS

4.10

3.809

5.00

7) CENTRES OF EXCELLENCE Objectives: Strengthening of awareness, research & training in priority areas of environmental science & management.

15.00

 

25.00

1)CEE, Ahmedabad

 

5.51

 

2) CPR Environmental Education Centre

 

2.043

 

3) Centre of Ecological Sciences , Bangalore

 

2.012

 

4) Centre for Mining Environment

 

1.169

 

5) SACON

 

4.885

 

 

Targets and Achievements:

 

16.1 Environment Education & Training: This scheme was started in 1983-84 with the objective of development of education/teaching materials, to encourage NGOs and others to environmental awareness, to promote environmental education through academic/research instructions and to ensure training and manpower development in environmental education. This scheme has three major programmes as follows:

 

1) National Environment Awareness Programmee (NEAC)

2) Eco-clubs

3) Preparation of films.

 

Under the NEAC programmes, the organisations covered has increased from 950 in 92-93 to 2450 in 95-96.

 

 

Eco-clubs set up during the VIIIth Plan are as follows:

 

1)

1)92-93

50

2)

2)93-94

1221

3)

3)94-95

1137

4)

4)95-96

1400

5)

5)96-97

1556

 

The no. of films completed during the period are approximately 81 nos.

 

16.2 Grants in aid to Professional bodies: This scheme was started in VII Plan with the objective of utilising the expertise available with prfessional societies and institutions by way of financial assistance for developing programmes and activities in the areas of environmental education ecology and wildlife. It is difficult to quantity achievements. It has contributed substantially in creating facilities and development of programmes in the field.

 

16.3 Paryavaran Vahiniis: This is a component of main scheme Paryavaran Sudhar Pariyojana. This was started in 92-93 with the objective of creations of environmental awareness and involvement of people, reporting on illegal acts in the field, feedback regarding afforestation and monitoring of ambient air and waterquality. A total of 195 districts in 14 States and 6 Uts have been selected and 144 districts have been covered till 96-97.

 

16.4 Seminars and Workshpas-1 This scheme was started during VII Plan to provide a common forum to professionals for sharing upto date knowledge on various technical issues related to environment. This continued in VIII Plan also. It is difficult to quantify the achievements. It has been successful in providing a common platform to professionals to interact and share their knowledge. Such interaction also helps in formulating strategies for addressing the environmental issues.

 

16.5 ENVIS: The ENVIS network set up by the Ministry in 1982 in a decentralised information network based on the concept of distributed network of data basis for collection, collation, storage, retrieval and dissemination of environmental information ENVIS provides national environment information service. Has 24 ENVIS Centres and a Focal Point in the Ministry. This acts also as Regional Service Centre for South Asia Sub Region of the INFOTERA network. Target was to open 9 new ENVIS Centres during VIII Plan. 9 ENVIS Centres were set up. 12 Centres were given support to instal Email facilities. ENVIS Network responded to 30,000 queries on environment and provided information. IX Plan target is to set up more Centres in areas not covered yet. Besides continuing the existing Centres, provision of E mail, internet and Website is also will be considered.

 

16.6 NNRMS: NNRMS, started in 1987, has the objective of monitoring of natural resources for its optional utilisation, help planning for reduction of regional imbalances, and maintenance of ecological balance. A Standing Committee on Bio Resources has identified 56 thrust areas under NNRMS. The target was to cover 15 areas. So far 20 areas out of these 56 thrust areas have been covered. The goal for IX Plan is to cover the remaining areas.

 

16.7: CENTRIES OF EXCELLENCE: This is an ongoing Central Sector scheme for strengthening awareness, research and training in priority areas of environmental science and management. CEE, Ahmedabad & CPREEC, Madras are engaged in the development of environment education resource material and creation of awareness. They brought out resource material, organised training programmes for teachers, NGOs, rural workers and students and organised exhibitions. 14 research project were completed in Western Ghats by CEE. CME had conducted about 45 R&D projects out of which 20 have been completed. It also conducted 16 Eco Development Programmes and 3 Semester M. Tech programmes. SACON conducted activities on research and other extension activities relating to ornithology and natural history. The activities of these Centres were reviewed by a Monitoring Committee. During the IX Plan, these Centres would continue to function, to undertake R&D projects in their concerned fields.

 

17.0 ENVIRONMENTAL IMPACT ASSESSMENT AND PROMOTION OF CLEANER TECHNOLOGIES

 

(Rs. in crores)

Scheme/

Activity

8th Plan

Outlay

Expdt.

IX Plan

Outlay

Goals set for Ninth Plan

Environmental

Impact

Assessment

 

 

 

 

 

Development

and Promotion

of Cleaner

Technologies

15.00

 

 

 

 

 

 

 

 

 

---

14.25

 

 

 

 

 

 

 

 

 

---

47.00 crores

(including

Envtl. authorit-

Ies)

 

 

 

 

 

 

---

The activities, will be continued. These

will include continuation of EIA

Authorities for NCR, Tamil Nadu and

Dahanu Region; setting up of National

Environmental Tribunal and National

Environment Appellate Authority. During

IX Plan emphasis will be on taking up

more demonstration projects for effective

transfer of technologies

 

---

 

 

17.1 Environmental Impact Assessment

 

Targets :

 

- Carrying Capacity Studies for 5 regions (1) Doon Velly (2) National Capital Region (3) Damodar River Basin (4) Tapi Estuary (5) Greater Kochi Region

 

Achievements:

 

In the case (1) & (2) draft funal report received. (3) & (4) are in the final stages of completion. (5) Sanctioned in 1997 is under progress.

 

- Natural Resource Accounting Study in upper Yamuna Basin Study completed and report is expected in March 98.

 

- Life Cycle Analysis for Steel Sector under progress

 

17.2 Development and Promotion of Cleaner Technologies

 

Development and use of cleaner technologies. A demonstration project after utilisation of spent ash for energy generation was sanctioned. Action for setting up on Indian Centre for Promotion Cleaner Technologies is also under progress

 

18.0 ABATEMENT OF POLLUTION

 

(Rs. in crores)

Scheme/Activity

8th Plan

Outlay

Expdt.

IX Plan

Outlay

Goals set for Ninth Plan

I)Assistance for

Abatement of

Pollution.

7.00

8.22

12.75

Under this scheme, grants will continue to be

released for strengthening the technical

capabilities of SPCBs, State Environment

Departments, PCCs, Pollution Pontrol Projects etc.

Other ongoing schemes will be continued and

consolidated.

2) Reimburse-

ment of Water

Cess

166.85

130.57

144.78

As this is based on collect and deposit no target

has been fixed.

3) Environ-

Mental Statistics

and Mapping

0.50

0.50

1.00

- Preparation of Zoning Atlas.

- Setting up of Environmental Statistics Cells.

- To bring out Status and trends in water quality.

4) Environ-

Mental Audit

0.50

0.50

5) Adoption of

Clean

Technologies

0.50

0.50

6) Improvement

of

Environmental

Performance in

Industries

1.50

This is a new scheme by merging Environmental

Audit and Clean Technologies by SSIs. The goal

is continuation and improvement of entire

performance.

 

Target/Achievements during the VIII Plan:

 

I)Assistance for Abatement of Pollution.

 

Under this scheme, funds were released to State Environment Departments, SPCBs, etc. and also for Pollution Prevention/Control Schemes and projects. The Government has initiated a scheme of National Award to encourage industries to take steps for prevention of pollution. Steps are being taken to control pollution in Agra Mathura trapezium. Keeping in view the importance of Environmental Epidemilogical Studies, 24 critically polluted areas in the country have been identified and work in 4 such areas have started. The scheme will continue in IX Plan also.

 

2) Reirnburse-ment of Water Cess.

 

Water Cess cellected is deposited by SPCBs/PCCs to the Consolidated Fund of India. This is reimbursed to the SPCBs/PCCs as per the prescribed formula. As this is based on collection no target is fixed.

 

3) Environmental Statistics and Mapping

 

Target:

 

- Preparation of District wise atlas for siting of industries

 

Achievements

 

 

During the IX Plan, the goal will be (1) preparation of Zonal Atlas, Setting up of environmental statistical cells and to bring out status and trends in water quality.

 

4) Environmental Audit

 

Targets:

 

Promotion of Sector wise training prograrnmes and Sector specific manuals.

 

Achievements:

 

Modular Environmental audit manuals were prepared, trainings were conducted, Sector specific manuals were prepared for Sugar, Lube oil and Refining Industry.

 

5) Adoption of Clean Technologies

 

Targets:

 

 

Achievements:

 

- General Guidelines Manual from Wastes to Profits prepared.

 

- Sector-specific manuals for pulp and paper, pesticides formulation Textiles Dyeing and Printing prepared.

 

- About 100 training programmes conducted.

 

19.0 NATIONAL MUSEUM OF NATURAL HISTORY (NMNH)

 

(Rs.in crores)

Programme

VH1 Plan

Outlay

Expdt.

Physical

Targets/Achievements

Ninth Plan

Outlay

Goals set for

Ninth Plan.

NMNH

10.00

7.19

*

19.00

**

 

* With the ongoing and diversified programmes and activities, NMNH consolidated its position during 8th Plan in Non-formal Environmental Education.

 

The Regional Museum of Natural History at Mysore was inaugurated and opened to the public on 20th May, 1995.

 

The First phase of construction of the building of RMNH, Bhopal was completed and handed over in January, 1996.

 

The Scientific collection work was started at the level of NMNH and RMNH, Mysore.

 

The first phase of the buildings of RMNH, Bhubaneswar is under construction.

 

The Proposal for creation of posts for RMNH, Bhopal, Mysore and Bhubaneswar is under process for obtaining approval of competent authority.

 

Indo-US Natural History Workshops were organised in India and USA. Under the Partnership Programmes three pairs were exchanged of museum personnel from NMNH and RMNH, Mysore with different US Natural History Museums.

 

** Acquisition of land and construction of building of NMNH.

Renovation and updation of existing NMNH galleries.

Completion of 2nd and 3rd phase of galleries of RMNH, Mysore.

Completion of 2nd Phase of building of RMNH, Bhopal.

Completion of 2nd phase of galleries of RMNH, Bhopal and open air exhibits on eco-history of Central India.

Completion of 1st and 2nd phases of building of RMNH, Bhubaneswar.

Completion of lst phase of galleries of RMNH, Bhubaneshwar.

Setting up of National Photographic Index at NMNH.

 

20.0. CIVIL CONSTRUCTION UNIT

 

(Rs. in crores)

Item

V111th

Plan

Outlay

Expdt.

Physical

Targets

(No. of

works)

Achieve-

ments

(No. of

works)

Ixth Plan

Outlay

(Proposed)*

Goals set for

Ixth Plan (No. of

Works)

Forestry and Wild

Life

4.95

4.45

19

14

33.84

71

Ecology and

Environment

18.50

16.36

44

32

40.00

98

Environment

Education/Training/

Extention

2.00

4.82

4

2

12.50

27

Civil works

 

3.00

3.75

--

--

6.00

--

Grand Total

28.45

30.38

67

48

91.98

196

 

21.0 NATIONAL RIVER CONSERVATION DIRECTORATE

 

At present there are 3 ongoing plan schemes relating to pollution abatement of rivers in the country. These are as below:

 

    1. Ganga Action Plan Phase 1
    2. Ganga Action Plan Phase 11
    3. National River Conservation Plan (NRCP)

 

GAP I is an ongoing Centrally Sponsored Scheme since 1985.

 

During the V111 Plan, out of the 261 schemes sanctioned, 250 schemes had been completed and 11 schemes are under implementation. Against the total sanctiolned cost of Rs.462.04 crores of GAP - Phase I, the VIII Plan allocation was of Rs. 105 crores, the expenditure is Rs.152.16 crores. The delay in completion of schemes were due to (i) delays in land acquistion, (2) litigations and court cases (3) encroachment of STP sites (4) repeated invitation of tenders (5) diversion of funds by the State Governments of UP & Bihar. Such a scheme was taken up for the first time in there country and adequate technical expertise was initially lacking.

 

Under GAP II, Yamuna Action Plan, Gomati Action Plan, Damodar Action Plan, Other towns on the main stem of the Ganga, including towns covered under Supreme Court order as also CETP at Calcutta are included. Against the total estimated cost of Rs.1281.17 crores, and outlay of Rs. 180 crores in VIII Plan, the expenditure is Rs. 131.76 crores.

 

The National River Conservation Plan is ongoing Centrally Sponsored Scheme which was approved in 1995 at an estimated cost of Rs. 772.08 crores. Funding under the scheme is to be shared on 50% basis between the Central and the concerned State Government. The scheme covers pollution abatement works in 18 rivers in 10 states and 46 towns. The likely period of completion is 10 years. So far projects costing Rs.65.28 crores have been sanctioned.

 

A new Centrally Sponsored Scheme of National Lake Conservation Plan (NLCP) was fortmulated at an estimated cost of Rs. 1065.10 crores, covering 11 urban lakes in the first phase. The Planning Commission has approved clean up operations in only 10 lakes but approval from the Cabinet is pending. Bhoj wetlands in Madhya Pradesh has been taken up with assistance from OECF. The tentative cost of the project is Rs.637 crores.

 

(Rs. in crores)

 

Scheme Acitivity

8th

Plan

Outlay

Expdt.

Target / Achievements

IX Plan

Outlay

Goals set for

Ninth Plan

National River

Conservation

Directorate

 

  1. Ganga Action
  2. Plan I

     

  3. Ganga Action
  4. Plan II (YAP,

    GoAP, DAP

    GAP-II, M.S.,

    SC), CETPs

     

  5. NRCP

 

 

4) NLCP

 

 

350.00

 

 

 

105.00

 

 

180.00

 

 

 

 

 

65.00

 

 

---

314.46

 

 

 

152.16

 

 

131.76

 

 

 

 

 

30.54

 

 

---

 

 

 

 

Completed 250 schemes. 11

schemes under completion..

 

Launch of Phase-II. All plans

Approved, YAP nearing

Completion; others are in

Progress

 

 

Launch of Action Plan. Works

in progress

 

---

 

693.80

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

---

Plan outlay

Approved is

against the

projection of

Rs. 1758 crores

Plan size/Target

being finalised

 

 

 

 

 

 

 

 

 

---

 

 

YAP (Yamuna Action Plan); DAP (Damodar Action Plan); MS (Main Stem); SC (Supreme Court; CETP (Common Effluent Treatment Plant).

 

22.0. PREVENTION AND CONTROL OF POLLUTION (ABATEMENT OF POLLUTION)

 

22.1 This scheme meets the need to strengthen the various State Polution Control Boards and State Environment Departments for enforcing the statutory provisions for taking up pollution abatement measures. The detail of the activities under the scheme are indicated as follows:

 

CENTRAL POLLUTION CONTROL BOARD

 

(Rs. in crores)

Scheme/Activity

8th Plan

Outlay

Expdt.

IX Plan

Outlay

Goals set for Ninth Plan

CENTRAL

POLLUTION

CONTORL

BOARD

16.00

20.63

32.00

Continuation of activities taken up in VIII

Plan, with attention on pollution control

enforcement in various key areas.

 

CPCB is the statutory body constituted under the Water Act, 1974 for functions specified under Sec 16 of Water Act, 1974 and Air Act, 198 1. It formulates plans and programmes relating to abatement of pollution. The main activities undertaken are as given below:

 

1. Pollution Assessment Survey and Monitoring

 

- Surveys and monitoring carried out to assess pollution loads generated by various sources

 

II. Laboratory Management

 

 

III. Development of Standards and Eco. Mark.

 

 

IV. Training.

 

- Regular training programmes on various subjects were organised for SPCBs/PCCs.

 

V. Information Management.

 

- SPCB/PCCs have been linked with CPCB through NICNET and information is seed on water

+ air quality monitoring from State Boards.

 

VI. Pollution Control Enforcement.

 

- 17 Categories of highly polluting industries were identified. These industries were directed to

comply with standards and legal action initiated as per law in the case of defaulters.

- Action points were prepared and implemented for critically polluted areas.

- Industries discharging waste water, were identified and industries located alongwith the banks

of river Ganga were rigorously monitored.

- Environmental auditing done in important categories of industries.

- Zoning Atlas work initiated in various districts.

- Comprehensive programme for reduction in vehicular pollutions Introduction of unleaded

oil in 4 metrocities.

 

VII. Pollution Control Technologies

 

- Review and study of technology undertaken in various specific sectors like distilleries, pulp, paper, cement, furnaces, combustion technology, boiler degrees etc.

 

VIII.- Mass Awareness.

 

 

X. Hazardous Waste Mana2ement.

 

- Inventorisation of hazardous waste generated by industries in various States/UTs was undertaken.

 

23.0. ASSISTANCE TO BOTANIC GARDENS

 

This scheme is aimed at conservation and propagation of plant and genetic resources. Its achievements during the Eighth Plan and goals for the Ninth Plan are as under:

 

(Rs. In crores)

Programme

VIll

Plan

Outlay

Expen

diture

Physical Targets

Physical

Achievements

Ninth

Plan

Outlay

Goals set for

Ninth Plan

Assistance

for Regional

Botanic

Gardens

1.5

3.18

One time financial

assistance to existing

botanical gardens for

improving their

infrastructural

facilities to facilitate

ex-situ conservation

of rare and

endangered plants

species.

40 Botanic

Gardens were

provided

financial

support.

5.5

To provide

Financial

assistance to

about 50

botanic gardens

for

infrastructural

improvements.

 

24.0 RESEARCH AND ECOLOGICAL REGENERATION

 

(Rs. in crores)

Scheme/Activity

8th

Plan

Outlay

Expdt.

Achievements

IX Plan

Outlay

Goals set for

Ninth Plan

RESEARCH AND

DEVELOP-MENT

Man & Biosphere

Environmental

Research, Action

oriented Research

Programme for

Eastern Western

Ghats

Integrated Action

Oriented Research

& Education .

Projects

18.38

15.85

This is a continuing scheme.

The objectives are (1)

Promotion of research in

multi-disciplinary aspects of

environment protection,

conservation and development

with capacity building.

During the first 4 years of

VIll plan 168 projects were

initiated and against target of

155. A total of 591 projects

were reviewed

aganist the target of 587. A

Compendium of 138

summaries was published and

action for printing of next

volume was initiated.

20.00

The scheme

will be

continued.

 

25.0. G.B. PANT INSTITUTE OF HIMALAYAN ENVIRONMENT & DEVELOPMENT

 

This Institute is supported by the Ministry for carrying out environment research in Himalayas. Its performance during the VIII Plan and goals set for the IX Plan are as under:

 

(Rs. in lakhs)

Programme

Vill

Plan

Outlay

Expdt.

Physical

Targets

Physical

Achievements

Ninth

Plan

Outlay

Goals set for

Ninth Plan

Research and

Development

of Himalayan

Region

2000.00

2132.00

Strengthening

of

infrastructure

and

construction of

buildings of the

Institute at

Almora, Kullu

& Gangtok and

Development/

Augmenting

Research and

activities in six

divisions.

Building at

Almora was

completed and

constaruction at

Kullu and Gangtok

was initiated with

50% achievements

at Kullu. Research

and development

projects initiated

by various

divisions were

successfully

completed.

3600.00

Research &

Development

Activities will

Be

strengthened.

Buildings at

Kullu and

Gangtok will

Be completed

And work will

Be initiated at

Itanagar.

 

25.1. INTEGRATED ACTION ORIENTED R&D AND EXTENSION PROJECTS IN HIMALAYAN REGION.

 

The achievement of the scheme during the the V111 Plan and goals set for IX Plan are given below:

(Rs. In crores)

 

Programme

Viii

Plan

Outlay

Expdt.

Physical Targets

Achievements

Ninth

Plan

Oulay

Goals set for

9" Plan

Integrated

Action

Oriented

Research

2.00

1.76

To provide extra

funds for location

of specific

projects operated

by various

organisations of

the Himalayan

Region.

56 Projects were

sanctioned out of

which 32 projects

completed and

results

disseminated to

various organisat-

ions.

Merged

with the

outlay

of GB

Pant

Instit-

ute.

In addition to

funding of on-

going projects.,

new projects

will be initiated

and new

network

partners will be

identified.

 

26.0. HAZARDOUS SUBSTANCES MANAGEMENT

 

The objectives of this scheme are (i) creation of infrastructure/information base and human resource development for handling of chemical accidents and (ii) creation of structures in the states for Hazardous Substances Management. For achieving these objectives, eight specific areas requiring immediate attention during the VIII Plan were identified. Five areas were identified for effective handling of chemical accidents and three areas for proper handling and disposal of wastes. The targets and achievements during the VIII Plan are as follows:

(Rs. in crores)

Scheme/Activity

8th Plan Outlay

Expdt.

IX Plan Outlay

Goals set for Ninth Plan

Hazardous Substances Management

12.4

9.16

20

The projects will continue

Hazardous Substances Management

Target/Achievements:

1) Management structure in 18 states created for Hazardous Substances Management,

2) Central Crises Group Alert System "Red Book" updated.

3) New Regulations and amendments to existing rules were taken up.

4) Implementation of the acts and rules are in progress.

5) Preparation of various guidelines on FISM done.

6) R&D projects on HSM were taken up.

7) Training of personnel and creation of public awareness on chemical accidents being conducted in identified institutions.

8) National Register for Potentially Toxic Chemicals has been set up.

9) 16 States have been provided financial assistance for development of waste disposal sites.

10) Pilot Projects for solid waste management were initiated.

11) A project on Industrial safety disaster prevention and FISM were taken up. This is to be implemented with external assistance.

26.1. World Bank assisted project on industrial Safety, Disaster Prevention and Hazardous Waste Management:

Under this scheme, a project on industrial Safety disaster prevention and hazardous waste management has been taken up. A Japanese grant of US $ 910,000 and Dutch grant of US $ 1,50,000 have been provided for conducting pre-feasibility studies. The project has 8 Terms references; and each TOR will be studied for project formulation by a Consultant.

During IX Plan, the scope of work on the thrust areas identified as above, will be extended. Many more areas are also proposed to be included. This includes support to State Governments.

27.0. CONSERVATION AND MANAGEMENT OF MANGROVES

The Scheme aims at the conservation and management of identified mangrove areas and its achievements during the VIII Plan and goals set for IX Plan are as under:

(Rs. In crores)

Programme

VIII Plan Outlay

Expdt.

Physical Taregts

Physical Avhievements

Ninth Plan Outlay

Goals set for IX Plan

Conservation & Management of Mangroves & Coral Reefs

4.5

3.6

15 MAPs on Mangroves & 4 MAPs on Coral Reefs

12 MAPs on Mangroves & 4 MAPs on Coral Reefs

7

15 MAPs on Mangroves & 4 MAPs on Coral Reefs

28.0. BIOSPHERE RESERVE

This scheme is intended to conserve representative ecosystems. 8 Biosphere Reserves have been set up. The achievement during the VIII Plan and goals set for IX Plan are as under:

(Rs. in crores)

Programme

VIII

Plan

Outlay

Expenditure

Physical

Targets

Physical

Achievements

Ninth

Plan

Outlay

Goals set for

Ninth Plan

Biosphere

Reserves

12.00

11.69

Funding to

state Govts. for

identified items

of activities in

8 Biosphere

Reserve and

initiation of

new research

projects in

those reserves.

Proposals

submitted by the

State

Governments

were funded for

approved items

of activities in 8

Biosphere

reserves. 32

research

projects were

also funded.

18.5

To design-ate

5 new sites as

Biosphere

Reserves and

to assist State

Govermnents

for identified

Biosphere

Reserves.

29.0. INTERNATIONAL COOPERATION

(Rs. in crores)

Scheme/Activity

8th Plan Outlay

Expdt.

IX Plan Outlay

Goals set for Ninth Plan

International Cooperation

49.18

122.89

193

1) Existing activities and contributions to International organisations will continue.

2) India Environmental Management Capacity Binding Project has been approved at a cost of US $ 61.48 million. to be implemented by MoEF,

DoD and Gujarat State Government.

Target/Achievements under International Co-operation.

1) Contribution to various international organisations continued.

2) Projects were approved under Global Environmental facility.

3) Projects were approved under India-Canada Envtl. facility.

4) Workshops were organised by SAARC, SACEP, ESCAP.

5) Trainings were conducted.

6) India was represented in International Conferences

7) Delhi Urban Environment & Infrastructure Development Project.

8) Indians Industrial Management Capacity Building Technical Assistance Project approval and implementation inititated.

30.0. ENVIRONMENTAL POLICY AND LAW

(Rs. in crores)

Scheme/Activity

8th Plan

Outlay

Expdt.

IX Plan

Outlay

Goals set for

Ninth Plan

1) Environment Policy Legislation

- Eco-Mark Scheme

- Comprehensive National

Environment Polity

- Integration of Eco mark

Institutions

0.50

0.50

15.00

2) Assistance for Abatement of

Pollution (Externally aided

projects)

10.00

3) Environ-mental Commission and

Tribunal

--

--

31.0. INDUSTRIAL POLLUTION CONTROL PROJECTS:

(EXTERNALLY AIDED SCHEMES)

31.1. WORLD BANK AIDED INDUSTRIAL POLLUTION PREVENTION PROJECT Phase-I (1991-97)

There are two projects for pollution control and prevention under the World Bank assistance, namely, World Bank aided Industrial Pollution Control Project (World Bank Project Phase-I) World Bank Project Phase-II). The Phase I project started in late 1991 and is till June 98. The Phase II project is for the period till 2001. The Phase I project has been prepared by the Ministry to utilise the support of the World Bank to prevent and alleviate environmental degradation caused by industrial operations. The cost of the project was to be US $260 millions, including a line of credit of US$ 155.6 millions as World Bank component. and US $ 104.4 million as the counterpart component. The components of the projects are institutional development component (equipment laboratory facilities, training). Investment Component ( loans assistance, grants for CETPs, demonstration projects) and Technical Assistance Components (pre investment studies etc.).

(Rs. in crores)

Programme

VIII Plan Outlay

Expdt.

9th Plan Outlay

World Bank aided Industrial

Pollution Control Project.

90.00 (approx.)

64.4

Nil (For Pollution Control Project as

the project is coming to an end in June.

1998.

World Bank aided Industrial Pollution Control Project.

Physical Targets were as follows:

Procurement of equip-ment for State Boards of U.P. Tamil Nadu, Gujarat & Maharashtra.

Training to the personnel of all the Pollution Control Boards.

Establishment of Common Effluent Treatment Plants (CETP).

Assistance for Projects for demonstrations/pilot studies.

R&D and related project studies Technical Assistance component.

Achievement are as given below:

Procurement of some equipment have been made.

44 training programmes have been connected.

78 CETPs have been sanctioned by MoEF.

17 demonstration projects have been sanctioned.

10 projects under technical assistance have been sanctioned.

Studies on Task Force on Economic Instruments for Abatement of Pollution has been completed and report received.

Phase-11 (1995-2001): The objective of the proposal is promotions of cost are (1) to strengthen 4 additional SPCBs, while continuing the programme of support to the SPCBs already assisted. (ii) facilitate priority investments dedicated to prevent pollution from industrial service and (iii) provide technical assistance for adoption of modem tools of information, management and control of residences, organisaation of clean technology institutional network and set up an extensive service on environmentally sound proctices for small scale industry. The estimated cost is about US$ 330 million including credit of US $ 168 million and counterpart fund of US$ 162 millions. The project will focus on most polluting industrial sectors wand will comprise (i) institutional component (ii) investment and (iii) technical assistance component.

Name of

Project/

Implementi

ng Division

Nature of

project/ Main

project

components

Project

cost/Project

duration

Targets/Mile

Stones

Targets/Mile

Stones achieved

Targets/Mil

e Stones

Financial

Current

Status

Industrial

Pollution

Prevention

Project -

Phase-11

1) Strengthening

of four State

Pollution Control

Boards.

2) Prevent

pollution from

industrial sources.

3) Provide

technical

assistance.

US $ 330

millions

(1995-2001)

1. To appoint

consultants for

procurement of

equipment.

2. Preparation of

bid document by

consultant for

procurement of

equipment.

3. Preparation of

schedule of

procurement of

equipment.

4. Opening of bid

by Gujarat

Pollution Control

Board for GIS.

1. Consultants

appointed for

procurement of

equipment on

27.8.97.

2. Draft bid

document has

been sent to

World Bank for

approval.

3. Bids have been

collected by

GPCB and in the

process of

opening bid for

GIs package.

1. The

consultant

will

complete

work by 18

months

starting from

27.&97.

2. GIS bid

will be

opened.

1. Bid already

prepared and

sent for

approval of

World Bank.

2. GIs bid will

be opened

within 1997-98

financial year

by GPCB.

31.2. TAJ PROTECTION MISSION

(Rs. in crores)

Scheme/

Activity

8th Plan

Outlay

Expdt.

Target/

Achieve-

ments

IX Plan

Outlay

Goals set for Ninth Plan

Taj

Protection

Mission

--

--

--

200.00

(included in the outlay for PL Division)

The scheme includes projects for uninterrupted

power supply in Agra, Construction of Gokul

and Agra Barrage, Taj Afforestation

programme, improvement of drainage system

and sanitation in Agra city and Environmental

and other programmes for protection of Taj.