CHAPTER II - A & B
REVIEW OF OVERALL PERFORMANCE
5. A REVIEW OF PERFORMANCE DURING 8TH FIVE YEAR PLAN AND GOALS SET
FOR THE 9TH PLAN
(1) The Ministry of Environment &- Forests was allocated an outlay of Rs. 1200 crores for its 8th Plan 1992-97. The actual expenditure in 1992-93 was Rs.274.65 crores, in 1993-94 it was Rs.303.52 crores, in 1994-95 Rs.328.25 crores. in 1995-96. Rs.296.64 crores and in 1996-97 it was Rs.428.84 crores, making a total of Rs.1631.90 crores. The sector-wise and year wise details of outlays/expenditure is as follows:
Table-A: Sector wise/Year wise approved Outlays & Expenditure under VIIIth Plan.
|
(Rs. In Crores) Sector |
8th Plan Outlay Original |
Outlay 1992- 93 |
Expdt. 92-93 |
Outlay 93-94 |
Expdt. 93-94 |
Outlay 94-95 |
Expdt. 94-95 |
Outlay 95-96 |
Expdt. 95-96 |
Outlay 96-97 |
Expdt 96-97 |
|
1 |
2 |
3 |
4 |
5 |
6 |
7 |
8 |
9 |
10 |
11 |
12 |
|
Environment |
325 |
48.00 |
45.09 |
70.00 |
71.15 |
79.00 |
103.52 |
80.00 |
63.00 |
125.00 I |
124.18 |
|
NRCD |
350 |
55.00 |
54.19 |
65.00 |
64.91 |
78.00 |
31. 34 |
79.00 |
42.09 |
106.00 |
121.53 |
|
NAEB |
275 |
115.00 |
114.45* |
98.00 |
90.33 |
103.00 |
103.13 |
104.00 |
93.18 |
90.00 |
87.55 |
|
Forests & Wildlife |
250 |
62.00 |
60.92 |
85.00 |
77.13 |
100.00 |
90.26 |
107.50 |
98.37 |
148.40 |
95.58 |
|
Total |
1200 |
280.00 |
274.65 |
318.00 |
303.52 |
360.00 |
328. 25 |
370. 50 |
296.64 |
469.40 |
428.84 |
* During 1992-93, the then National Wastelands Development Board was bifurcated into two separate Boards. NVrDB was transferred to Department of Wastelands Development and NAEB was retained in Ministry of Environment & Forests. The allocation of Rs. 115.00 crores was for both the boards. The expenditure of Rs. 114.45 crores relates to both the Boards. Expenditure under NAEB was Rs.72.736 crores during 92-93.
Table-B: Sector-wise Plan outlay & Expenditure in percentage under the VIIIth Plan
(Rs. in Crores)
|
Sector |
8th Plan Outlay Original |
Total Outlay Revised |
Total Expdt. |
Allocations (% increase over original outlay) |
Expdt. (% increase over original outlay) |
|
1 |
2 |
3 |
4 |
5 |
6 |
|
Environment |
325.00 |
402.00 |
406.95 |
23.69 |
25.21 |
|
NRCD |
3,50.00 |
383.00 |
314.07 |
9.42 |
(-)10.27 |
|
NAEB |
275.00 |
510.00 |
488.64 |
85.45 |
77.681 |
|
Forests & Wildlife |
250.00 |
502.90 |
422.24 |
101.16 |
68.90 |
|
Total |
1200.00 |
1797.90 |
1631.90 |
49.82% |
36.00% |
Notes:
Increase in outlays/expenditure over original approved Plan outlay in case of NAEB is due to the fact that the major schemes of NAEB were got approved from CCEA at enhanced outlays for 8th FYP so as to increase area coverage under afforestation/Eco-development activities.
Increase in outlays/expenditure over original approved Plan outlay in case of Environment is due to the fact that year-wise outlays for certain schemes like Environmental Impact Assessment. Industrial Pollution Control Project, Conservation & Survey etc. were approved by Planning Commission at increased levels.
Increase in outlays/expenditure over original approved Plan outlay in case of Forest and Wildlife is due to the fact that the major schemes like World Bank aided Forestry Research Education Extension Scheme of ICFRE. Eco-Development in and around Protected Areas. Project Tiger, Development of National Parks and Sanctuaries. Project Elephant etc. were approved at enhanced level in VIII Plan due to increased activities.
Under NRCD. during VIIIth Plan, except GAP Phase I which was 100% central funded- all schemes are implemented on a 50:50 sharing basis.
6. OUTLAY FOR THE NINTH PLAN AND ANNUAL PLANS 1997-98,1998-99 and 1999-2000.
Overall Plan outlay/expenditure
sector-wise
(Rs. in Crores)
|
Year |
Environment |
NRCD |
Forests & Wildlife |
NAEB |
Total |
|
9th Plan approved outlay |
875 . 50 |
693.80 |
868.20 |
735.00 |
3172.46 |
|
1997-980utlay |
198.00 |
109.00 |
144.70 |
92.00 |
5431.70 |
|
Expenditure |
115.37 |
99.44 |
122.70 |
69.19 |
406.70 |
|
1998-990inlay |
210.91 |
191.70 |
209.13 |
92.35 |
704.09 |
|
Expenditure |
144.00 |
107.48 |
174.24 |
72.05 |
497.77 |
|
1999-2000 Outlay |
191.50 |
'100.00 |
215.00 |
93.50 |
700.00 |
NRCD -National River Conservation Directorate.
NAEB-National Afforestation and Eco-Development Board.
7. The scheme wise details of outlay, expenditure, physical targets and achievements during the
8th Plan period in all the sectors as above, and- the outlay and the goals set for 9th Plan are as below:
8. INDIRA GANDHI NATIONAL FOREST ACADEMY (IGNFA), DEHRA DUN
The IGNFA is responsible for in-house training for Indian Forest Service Probationers. Its achievements during the VIII Plan and goals for the IX Plan are as under:
(Rs. in Crores)
|
Programme |
VIII Plan Outlay |
Expenditure |
Physical Targets |
Achievements |
9th Plan Outlay |
Goals set for 9th Plan. |
|
Training of IFS Probationers. |
7.03 |
7.03 |
* |
Fully Achieved |
1000 |
** |
* Training of IFS Probationers recruited from 1992-98
10 Compulsory courses for in-service IFS officers.
I Induction Training Programme with 26 participants.
**Training of IFS Probationers.
Modernisation of pavilion.
9.
STATE FOREST SERVICE AND RANGERS COLLEGES
This Institute caters to the training requirement of SFS Officers of different States. Its achievements during the VIIIth Plan and goals for the IXth Plan are as under:
(Rs. in Crores)
|
S. No. |
Programme |
VIII Plan Outlay |
Expdt . |
Physical Targets. |
Physical Achieve ments |
Ninth Plan Outlay |
Goals set for Ninth Plan |
|
|
SFS & Rangers Colleges |
4.05 |
3.97 |
|
|
6.00 |
|
|
1. |
Training of SFS Officers |
|
|
15 courses |
12 courses |
|
15 courses |
|
2 |
Training of Forest Rangers |
|
|
5 courses |
5 courses |
|
2 courses |
|
3. |
Special Refresher Course for In-service SFS Officers |
|
|
59 courses |
59 courses |
|
55 courses |
|
4. |
Course on Computer Application in Forestry for In-service SFS Officers |
|
|
17 courses |
17 courses |
|
34 courses |
|
5 |
Course on social Forestry & Sustainable rural development |
|
|
2 courses |
2 courses |
|
5 courses |
|
6. |
Theme based Course on Bio-diversity Conservation |
|
|
I course |
I course |
|
5 courses |
|
7. |
Promotion related courses for ACFs and Forest Rangers |
-- |
-- |
8 course (4 courses for ACFs and 4 for Forest Rangers) |
10. INDIAN INSTITUTE OF FOREST MANAGEMENT (HIM), BHOPAL
IIFM, Bhopal is an autonomous Institution under the Ministry established for the development of managerial capacity in the forestry sector. Its achievements during VIIIth Plan and goals for the Ninth Plan are as under:
(Rs. in Crores)
|
S. No. |
Programme |
Vill Plan Outlay |
Expdt. |
Physical Targets. |
Physical Achievem -ents |
Ninth Plan Outlay |
Goals set for Ninth Plan |
|
|
IIFM |
6.50 |
10.34 |
|
|
14.00 |
|
|
a) |
Management Development Programme (MDP)/ Courses & Seminars |
|
|
MDP Courses- 109 |
MDP Courses- 79 |
|
13 1 MDP and 19 workshops |
|
b) |
Post-Graduate Diploma in Forestry Management (PGDFM) |
|
|
PGDFM 5 batches |
PGDFM 5 batches |
|
Every year 35 students in PGDFM, 5 seats to SAARC students, 5 seats for foreign nationals/NRIs. |
|
c) |
M.Phil level Course on Resource Management (MRM). |
|
|
MRM 3 batches |
MRM 3 batches |
|
20 persons in MRM. Ph.D.Programmes 10 numbers. |
11. INDIAN COUNCIL OF FORESTRY RESEARCH & EDUCATION (ICFRE), DEHRADUN.
This is an autonomous body under this Ministry for research and education activities relating to forestry. It has 8 institutes and 3 satellite centres spread all over the country. Its achievement during VIII Plan and goals for Ninth Plan are as under:
(Rs. in Crores)
|
S.No. |
Programme |
VIH Plan Outlay |
Expdt. |
Physical Target/ Achievements |
Ninth Plan Outlay |
Goals for Ninth Plan |
|
1. |
Research a) General Component |
90.00 |
110.44 |
* |
267.00 (including externally aided component |
** |
|
|
b) Externally Aided Component |
90.00 |
56.69 |
|
|
|
|
2 |
Education & Training |
4.00 |
4.49 |
* |
8.00 |
** |
*ICFRE(HQ)
ICFRE(HQ) provides necessary guidance, finance, co-ordination and monitoring to its Institutes. Various administrative and technical issues regarding forestry research education & extension are co-ordinated. These works included allotment of budget, finance, administrative and service matter-, recruitment and deputation of staff: monitoring evaluation, supervision and control of externally aided projects, etc-, education under forest related matters was imparted through various PG Diploma courses and fellowships and research associateship were awarded The relevant extension materials and important research findings were published. The important research activities in different research Institutes of the Council for the plan period were as follows:
i) Forest Research Institute, Dehradun - Market price monitoring of 14 timber species from 10 markets and publication of information-. Development of packing boxes from poplars: Evaluation of gluing techniques and preservation treatment-. Factory trials of making pencil from poplar logs Developing designs of furniture from various woods-, Studies on storage on leguminous species of food mid medicinal value, Ecological monitoring on regeneration, mortality and bio-diversity in Garhwal Himalayas. Recycling of waste paper-, studies on nursery, and plantation diseases on woods. Development of bio-pesticide from Karanj seed.
ii) Institute of Forest Genetics and Tree Breeding, Coimbatore - Study of reproductive biology of important agroforestry and plantation tree species and mass multiplication of selected genotypes of agroforesty species for increasing the productivity-, Estimation of nutrient cycling in different plantation ecosystem.
iii) Institute of Wood Science & Technology, Bangalore - Surveys on sandal provenances and collection of seed from different areas for provenances trials and establish clonal seed orchards of superior genotypes-, developed tissue culture protocol for sandal and study the sandal wood pathogen. Study variation in wood and oil of sandle from various provenances.
iv) Tropical Forest Research Institute, Jabalpur - Collection of germplasm of non timber forest species e.g. grass, superior edible fruit giving trees in the forest, medicinal and aromatic plants of Central India and evaluate these for higher yields; study of allopathic effects of agroforestry trees on agricultural crop. Survey and identify, VAM fungi, rhizobiurn and frankia associate with different tree species and evaluate their effect on productivity of the species.
v) Arid Forest Research Institute, Jodhpur - Screen the local tree species for tolerance of moisture stress-, Evaluate and develop irrigation water management for tree species and in different
agroforestry systems to maximise productivity; Develop tissue culture protocol in propagation of superior genotypes of fodder yield trees, etc.
vi) Institute of Rain and Moist Deciduous Forest Research, Jorhat - Survey and examine variation in seed formation viability and germination of important agro-forestry species: Develop necessary, nursery technology for local agroforestry species.
vii) Himalayan Forest Research Institute, Shimia - Evaluate the suitability of plant species for cold desert areas and develop effective establishment techniques. Eco-rehabilitation of mined damaged areas, Survey and establishment of 1000 ha. seed stands and seed production areas.
viii) Institute of Forest Productivity, Ranchi - Maintenance of four new brood lac fams alongwith improvement trials with the introduction of new strains of lac insect and hosts, market data collection on lac and dissemination of information to the public.
ix) Institute of Social Forestry and Eco-Rehabilitation, Allahahad - Agro-forestry on demonstration sites with soil amendments and site preparation apphcation of bio-fertilisers and collection of growth data-, Socio-ecological survey on 10 locations in Vindhyan hill tracts and Gangetic plains.
X)
Research and Human Resource Development, Chhindwara Hunan resource development programmes for developing skilled manpower in forestry sector.
** Important research activities in different Institutes of the Council for the IXth Plan have been outlined below:
i) Forest Research Institute, Dehradun - Planting stock improvement programme of Poplar, Chirpine. Eucalyptus. Sisoo. Teak etc: Investigation into seed viability. germination and longevity of some important species of upper Gangetic plains-, Preparation of volume and yield tables of Dalbergia sisoo and Poplars, Economics of Tcctona 'grants plantations in Tarai region. Studies on nursery and plantation diseases and their management: development of adhesives from renewable sources: Studies on Jatropha seed oil: Development of technology for eco-friendly preservative: Production of restructured wood from lops and tops of Poplar arid Lantana. etc.
ii) Institute of Forest Genetics & Tree Breeding, Coimbatore - Genetic upgradation and planting stock enhancement of selected plant material of teak through macropropagation techniques-. Collection of seeds from SPA and maintenance of seedlings. Monitoring of seed orchards of MTP species and seed production areas: Collection of field data of teak plantations of Coinibatore. Pollachi and Thaqjavur divisions. Establishment of pasture and silvi-pasture system in the selected fields. Reproductive biology and breeding s-, stems in tropical tree species-. Selection of salinitv tolerant clones of casurina growth: Allopathic effect of forestry species on seed germination. etc.
iii) Institute of Wood Science and Technoloav, Bangalore - Study of anatomy of important species for the purpose of identification: Developinent of computer assisted wood identification: Assessment of wood quality of different clones of Eucalyptus tereticornis and evaluation of physical and mechanical properties of Eucalyptus grandis and Acacia auriculiformis: Training in field identification and grading of timber to in-service officials. Durability studies of timber treatability of timbers used in catamarans and leachabilitv of water borne preservatives in treated woods;
iv) Tropical Forest Research Institute, Jabalpur - Maintenance of provences trials; Establishment and maintenance of SSPAs. CSOs. multiplication garden of teak and development of model research nursery: Survey, identification and selection of plus trees of Teak- Casurina and Safed Siris. Bio-chemical studies of plant/trees sample collected from and around lime kiln area arid factors responsible for tolerance in these species: Identification of insect pests on forestry seeds in nurseries and plantations: Studies on bio-diversity of Satpura National Park
v) Arid Forest Research Institute, Jodhpur - Investigation of soil water relationship in various site conditions for important tree species of and zone. Evaluation of different tree species for high yields in forestry plantations and agro-forestry areas in the IGNP command area, Establishment of seed production areas, clonal seed orchards and vegetative multiplication gardens.
vi) Institute of Rain & Moist Deciduous Forest Research, Jorhat - Management of shifting cultivation; Effect of shifting cultivation on the vegetation pattern-, microbial population and soil nutrients in North-East India-, Development of agro-forestry model-, Survey and collection of Bamboo blight disease, isolation, culture arid identification of pathogens: pathogenecity tests, isolation work. Restoration and reclamation of abundant mined areas of Assam coal fields.
vii) Himalayan Forest Research Institute, Shimla - Planting stock improvement programme identification and location of seed stands and their development into seed production areas-, Establishment of vegetative multiplication garden-, Studies on Himalayan pine-identification, screening, selection and collection of germplasm of Pinus roxburghii; Regeneration of coniferous and broadleaved forests; Examine the effect of the introduction of Poplars into degraded coniferous forests
viii) Institute of Forest Productivity, Ranchi - Establishment and maintenance of seed production areas, Seedling seed and clonal seed orchards for the priority species in Bihar and West Bengal: Provenance trials of Eucalyptus, Gamhar, Neem and Sisso. etc, Establishment of vegetative multiplication garden; Hydrological studies.
ix) Institute of Social Forestry and Eco-Rehabilitation, Allahabad - Agroforestry models for wasteland: Enviromnental rehabilitation of Vindlivan hills and Gangetic plains, Enhancement of productivity of ecosystems.
x) Institute of Forestry Human Resource Development, Chhindwara - Imparting training in advanced forestry technology: Studies on socio-econoinic aspects and joint forest management: Identification of key pests and their control measures.
xi) Forest Research Centre, Hyderabad - Building construction at new site: Planting stock improvement programme. Studies on mangrove forests. non-wood forest products, bio-diversity conservation,
12. INDIAN PLYWOOD INDUSTRIES RESEARCH & TRAINING INSTITUTE (IPIRTI), BANGALORE
The Indian Plywood Industries Research and Training Institute (IPIRTI) is an autonomous body of the Ministry of Environment and Forests, Government of India. It was established in 1962 as Indian Plywood Manufacturers Research Association (IPM11A) at the initiative of the plywood industry with participation of the Council of Scientific and Industrial Research (CSIR). The Institute was redesignated as Indian Plywood Industries Research Institute in 1970. The administrative control of the Institute was transferred to the Ministry of Environment & Forests in 1990. The objectives of the Institute are:
(Rs. in Crores)
|
Programme |
VIII Plan Outlay |
Expdt. |
Physical Ninth Plan Targets/Achievements Outlay |
Ninth Plan Outlay |
Goals set for Ninth Plan
|
|
IPIRTI |
2.16 |
2.21 |
* |
4.00 |
** |
* The Institute's Research & Development focus during VIII Plan period was on the following key areas:
Optimum utilisation of small diameter logs in the production of lumber and plywood. Formulation of adhesives replacing non-renewable with renewable materials. Development of economical methods to treat wood and wood based panels with preservatives. Evaluation and standardisation of plywood woods for engineering applications. Promotion of Total Quality Management (TQM) tools for better quality and higher productivity.
** The research and Development focus during the Ninth Plan will be as follows:
Further strengthening of Mechanical Wood Industries Research and Training facilities at IPIRTI specially for production of panel products and sawn wood from small diameter logs.
Establishment of Research & Training facilities in particle board for efficient utilisation of fast growing plantation wood, wood residues from wood industry and other lignocellulsic agroresidues.
Establishment of Research and Training facilities in Ringer jointing and laminating plant for better utilisation of sawn wood from small diameter plantation timbers and wood residues for different and use applications.
Establishment of an outreach station in North Western India to cater to R&D needs of North and north-western States of the country including Haryana, Punjab, Himachal Pradesh. J&K. UP and Rajasthan.
Continue R&D work on finding wood alternatives by plantation grown timber and bamboo.
Establishment of facilities for evaluating strength characteristics of large size wood and wood based panels non-destructively.
Organising in-plant training at the factory premises.
SURVEY AND UTILISATION OF FOREST RESOURCES
13. FOREST SURVEY OF INDIA (FSI):
The FSI is responsible for survey and utilisation of forest resources in India and its achievements during the VIII Plan and outlay proposed for the IX Plan are as under:
(Rs. in Crores)
|
S.No. |
Programme |
VIII Plan Outlay |
Expenditure |
Ninth Plan Outlay |
|
I |
Application of Remote Sensing Techniques in Survey of Forests. |
19.21 |
13.79 |
21.00 |
The physical targets and achievements of FSI during the VIII Plan and the goals set for the IX Plan arc as under:
|
S. No. |
Programme |
Units |
Physical Targets |
Physical Achievements |
Goals for Ninth Plan |
|
1. |
Forest Inventory |
Area in Sq. Km. |
1,27,057 |
1,67,571 |
1,70,000 |
|
2. |
Data Processing |
-do- |
1,20,043 |
1,15,481 |
1,70,000 |
|
3. |
Thematic Mapping |
1:50,000 scale |
1,300 |
1301 |
670 |
|
4~ |
Vegetation Mapping |
1:250,000 scale |
909 |
911 |
905 |
|
5. |
Training |
No. of Persons Trained |
420 |
613 |
450 |
|
6. |
Special Study |
-- |
6 |
13 |
20 |
14. FOREST CONSERVATION
Under the Scheme "Strengthening of Forestry Division", six Regional Offices are implementing the Forest Conservation Act and monitoring of environmental clearances accorded by the Ministry under Environment Protection Act. The physical and financial achievements during the VIII Plan and goals set for IX Plan are as under:
(Rs. in Crores)
|
S. No. |
Programme |
Vill Plan Outlav |
Expdt. |
Physical Targets |
Achiev -ement |
Ninth Plan Outlay |
Goals set for Ninth Plan |
|
I |
Strengthening of Forest Division: |
9.55 |
9.56 |
20.00 |
|||
|
a) Monitoring of Forest Conservation Projects/Cases |
4370
|
4094
|
4750 |
||||
|
b) Monitoring of Environment Clearance Prejects/Cases. |
2140 |
2527 |
2200 |
15. FOREST PROTECTION AND REGENERATION
The Scheme "Association of Scheduled Tribes and Rural Poor in Regeneration of Degraded Forests" was started in 1992-93 on pilot basis with 37 projects in 9 States, namely, Andhra pradesh, Bihar. Gqjarat. Madliva Pradesh. Maharashtra, Rajasthan. Orissa, West Bengal and Karnataka.. Its achievement during the VIII Plan and goals set for the IX plan are as under:-
(Rs. in Crores)
|
Programme |
Vill Plan Outlav |
Expdt. |
Physical Targets |
Physical Achieve Ments |
Ninth Plan Outlav |
Ninth Plan Physical Target |
|
Association of Scheduled Tribe & Rural Poor |
7.35 |
7.36 |
10.550 ha. Rehabilitation of degraded Forest lands |
10570 ha. |
12.00 |
15670 ha. Rehabilitation of Degraded forest land. |
During the VIII Plan, a Central Sponsored Scheme, "Modem Forest Fire Control Methods in India" was continued. The project was implemented in 11 States during VIII Plan. Its achievement during the VIII Plan and goals set for IX Plan are as under:
(Rs. in crores)
|
Programme |
VIll Plan Outlay |
Expdt. |
Physical Targets |
Physical Achievem ents |
Ninth Plan Outlay |
Goals set for IXth Plan |
|
Modern Forest Fire Control Methods in India |
7.37 |
7.37 |
To assist 11 States to develop necessary infrastructure to control forest fire |
11 States were assisted |
15.00 |
To assist all. States/UTs to Develop necessary Infrastructure to Control forest fire. |
WILDLIFE
16. Ministry of Environment & Forests oversees implementation of Wildlife (Protection) Act. provides assistance to State Governments for development and protection of National Parks and Wildlife Sanctuaries and deals with matters relating to Wildlife Institute of India (WII), Dehradun and Convention on International Trade in Endangered Species (CITES).
17. WILDLIFE INSTITUTE OF INDIA (WII)
WII was established in 1982 under the erstwhile Ministry of Agriculture and Co-operation and subsequently brought under the Ministry of Environment and Forests. The main mandate of the Institute is to impart training to government and non-government personnel to carry out research and advise on matters of conservation and management of wildlife resources. In April. 1986, autonomous status was granted to this Institute for developing its professional role in bio-diversity conservation for South and South East Asian Region.
The Institute conducts three principal courses viz.. the 3 months' certificate, the 9th months' diploma and 2 years M.Sc. in Wildlife Biology on a regular basis.
During 8th Plan about 170 students/Forest Officers/others were trained by WII in different courses conducted by it. Its achievements during 8th Plan and goals set for 9th Plan are given below:
(Rs.in Crores)
|
Programme |
8'h Plan Outlay |
Expdt. |
Physical targets (no. of persons) |
Achievements (no. of persons) |
9th Plan Outlay |
Goals set for 9th Plan (No. of Persons) |
|
W11 |
17.57 |
16.21 |
|
|
20.00 |
|
|
a) M.Sc, courses in Wildlife Sciences |
50 |
26 |
65 |
|||
|
b) P.G. Dip, Course in Wildlife Management. |
150 |
86 |
110 |
|||
|
c) Certificate Course in Wildlife Management. |
150 |
83 |
110 |
|||
|
d) Field Workshop/ Short Courses |
300 |
175 |
1500 |
18. STRENGTHENING OF WILDLIFE DIVISION AND CONSULTANCIES FOR SPECIAL TASKS
The Scheme was started from 1986 with activities like Strengthening of Wildlife Division and Regional Offices in Delhi, Mumbai, Calcutta and Chennai with adequate manpower and development of infrastructure for better enforcement of Wildlife (Protection) Act, CITES, etc. Three sub-regional offices at Guwahati, Amritsar (shifted from Pathankot) and Cochin were started. The achievement of the Scheme during the VIII Plan and Goals set for the IX Plan are as under:
(Rs.in Crores)
|
Scheme |
8th Plan Outlav |
Expdt. |
Physical Targets/ Achievements |
9th Plan Outlay |
Goals set for 9th Plan. |
|
Strengthening of Wildlife Division |
3.50 |
2.71 |
* |
6.00 |
** |
*Establishment expenses, Office Expenditure, Domestic Travel Expenses. of Central Wildlife Division and Regional Offices are being paid from the Scheme. Funds are also provided for conduct of Consultancies in wildlife management for special tasks and assistance is given as and when there is a proposal for the same.
**Besides providing funds to Central Wildlife Division , Regional Offices and Consultancies for special tasks, creation of two new regional offices at Ahmedabad and Hyderabad will be undertaken alongwith strengthening of existing Central Division/Regional and Sub-regional Offices.
19. NATIONAL PARKS AND SANCTUARIES
The objective of the Scheme is to assist the State governments and UTs in the development of their National Parks and Sanctuaries and encourage them to extend protected area network. The Scheme provides financial assistance for habitat development of Wildlife and Bio-diversity Conservation, to create infrastructure facilities for better protection and management. 100%assistance is provided under this Scheme for identified items of non-recurring expenditure in case of National Parks and Sanctuaries. 50% assistance is also provided in respect of certain identified recurring items of expenditure in respect of National Parks only. Its achievement during the 8th Plan and goals set for the 9th Plan are as under:
(Rs.in Crores)
|
Scheme |
8th Plan Outlay |
Actual Expdt. |
Physical Targets |
Achieve- Ments |
9th Plan Outlay |
Goals set for 9th Plan. |
|
Develop- ment of National Parks and Sanctuaries. |
49.50 |
49.50 |
250 National Parks and Sanctuaries to be covered and Provided assistance. |
220 National Parks and Sanctuaries were provided assistance. |
85.00 |
To provide financial assistance to all National Parks and Sanctuaries in States/UTs for protection of endangered species and Conservation of Wildlife. |
20. CENTRAL ZOO AUTHORITY (CZA)
The Central Zoo Authority (CZA) was constituted by the Government of India in February, 1992 with a view to enforce minimum standards for upkeep and health care of animals in zoos. This was done through an amendment of the Wildlife (Protection) Act, 1972.
The achievements of CZA during the VIII Plan and goals set for the IX Plan are as under:
(Rs. in Crores)
|
Name of the Scheme |
Eight Plan Outlay |
Actual Expdt. |
Ninth Plan Outlay |
Physical Targets/ Achievements |
Goals Set for Ninth Plan |
|
Central Zoo Authority |
12.00 |
12.00 |
40.00 |
* |
** |
*Rs.948.36 lakhs were released to various Zoos as approved by CZA.
All large, medium, small, mini and mobile zoos were evaluated.
Training courses for Zoo Directors and Zoo Keepers were organised at various places.
Workshops were organised.
Zoo Directors and Veterinarians were sent for training at Wildlife Preservation Trust at Jersey, U.K.
2 research projects were awarded to CCMB for DNA finger printing of wild animals and semen and Geo-preservation. of Spermatozoa of Indian Wild Animals.
** Grants to zoos for improvement of animal enclosures/upgradation of upkeep/ health care, awareness, etc.
Creation of centre for conservation of endangered species.
Education and awareness of programmes through NGOs.
Training programmes / workshops will be organised in collaboration with Wildlife Institute of India and other Institutes.
Suitable office accommodation for CZA office will be hired /acquired.
Creation of rescue centres for animals at each zone.
21. ANIMAL WELFARE BOARD OF INDIA (AWBI)
Various animal welfare organisations along with the Board take steps to generate public awareness. AWBI receives grants-in-aid from Government of India and in turn provides assistance to various organisations in the country for rescue/shelter homes, animal birth control, vehicles, medicines and veterinary, care. etc. AWBI also imparts training to representatives of various Animal Welfare Organisations and public in animal care, laws and various other disciplines. Its achievements during theVIII Plan and goals set for the IX Plan are as under.
(Rs. in Crores)
|
Name of the Scheme |
VIII Plan Outlay |
Expdt. |
Physical Target/ Achievements |
Ninth Plan outlay |
Goals set for Ninth Plan |
|
Animal Welfare Board of India |
6.50 |
6.40 |
* |
15.50 |
Number of trainers 150. Number of Hon. Aninial Welfare Officers 12000. Nuiiiber of training centres 1000. |
|
Rescue home for animals - Number of organisations to be benefited 300. |
|||||
|
ABC operations 100000. Number of Ccntres 30. |
|||||
|
|
|
|
|
|
Construction of office building of AWBI. |
|
|
|
|
|
|
Research & Development. |
Scheme has been transferred to the Ministrv of Social Welfare & Empowerment w.e.f 3.9.98.
Phvsical Targets
a) Humane Education
b) Rescue home for animals including water troughs and water facilities.
c) Animal birth control operations (ABC)
Achievements
a) Number of trainers 97. Number of Honorary Animal Welfare Officers 9500. Number of Training
Centres 600.
b) Number of organisations benefited 250.
c) Number of operations 70,000. Nuniber of centres 20,
The scheme has been transferred to Ministry of Social Justice and Empowerment during 1998 -99.
22. PROJECT TIGER (PT)
The Centrally Sponsored Plan Scheme 'Project Tiger' was launched on I st April. 1973. Initially. nine tiger reserves were created. Presently. there are 25 tiger reserves in 14 States covering an
area of over 33,000 sq. kms. The achievements of the Scheme during the VIII Plan and goals set for theIX Plan are as under:-
(Rs. in Crores)
|
Scheme |
8th Plan Outlay |
Expdt. |
Phvsical Targets |
Phvsical Achievements |
Ninth Plan Outlay |
Goals set for Ninth Plan.
|
|
Project Tiger |
40.00 |
38.90 |
* |
** |
75.00 |
6 New Tiger reserves are to be identified and included in the Project Tiger scheme in addition to providing central assistance to 23 tiger reserves created upto the end of the Eight Plan, Creation of Strike Force in six Tiger Reserve facing militancy and Extremists activity. |
*Physical Target
To assist Tiger Reserves for conservation and protection of tigers habitat improvement, forest protection. construction of staff quarters. office building & wireless network. etc.
**Plivsical Achievements
Central assistance was given to 23 Tiger Reserves and the following targets were achieved:
a) Habitat Development - 6425 Hc.
b) Fire Protection - 3 00 kms of new fire lines.
c) Development - 40 Nos. Anicuts. 85 Nos. Tanks/Ponds 200 Nos. water-holes. 50 Nos. Tubewells
d) Construction of Building - 545 of various categories of buildings.
e) Construction of Roads - 350 Kms.
f) Wireless Network - 50 Nos. Wireless Stations. 100 Nos. Wireless Sets and 400 Nos. W.T. Sets.
g) Replacement of Vehicles - Jeep/Cars 50 Nos.. Motor Cycles 40 Nos. and others 10 Nos.
h) Protection - 125 Nos. of Arms Supplied.
i) Nature Interpretation Centres - 20 Nos. completed.
23. PROJECT ELEPHANT
The Scheme was started in 1991-92. The achievement during the VIII Plan and goals set for the IX Plan are as under:
(Rs. in Crores)
|
Scheme |
VIII Plan Outlay |
Expdt. |
Physical Targets |
Physical Achieve-ments |
Ninth |
Goals for the Ninth Plan |
|
Project Elephant |
23.00 |
19.51 |
To assist 12 States for Conservation of elephants, habitat development etc. |
Assisted 13 States for conservation of elephants |
40.00 |
To assist 12 States for conservation of elephants. |
24. ECO-DEVELOPMENT SCHEME IN AND AROUND PROTECTED AREAS:
The objectives of the Scheme is to provide alternative sources of sustenance to the communities on the fringes of National Parks and Sanctuaries and to improve the ecological productivity of the buffer zones of Protected Areas through (the introduction of sustainable economic activities and also to provide assistance for preparation of plans for eco-development. soil conservation. alternative energy sources, efficient utilisation of biomass etc. Its achievement during the 8th Plan and goals for the 9th Plan are as under:
(Rs in Crores)
|
Scheme |
8th Plan Outlay |
Expdt. |
Physical Targets |
Achievements. |
9th Plan Outlay |
Goals set for 9th Plan |
|
Eco- develop Ment Around Protected Areas |
22 99 |
22.20 |
80 national Parks and Sanctuaries and 23 Project Tiger areas to be covered. |
70 National Parks and Sanctuaries and 23 ProjectTiger areas covered under the scheme. They were provided assistance for biomass generation and non- conventional energy resources |
175.00 (includin g India Eco Develop -ment Project) |
80 National Parks & Sanctuaries and 24 Project Tiger areas will be covered (excluding 5 Tiger Reserves being assisted under the Externally Aided Scheme) for biomass generation and non-conventional energy resources. |
|
India: Eco- develop Ment Project. |
6.16 |
2.36 |
The Project Preparation Facility funds of US $2 million was provided as loan By IDA to take up Demonstration activities viz. Improved management. village eco- development, Environment Education Awareness campaign, etc. in 7 protected areas where the main scheme would be Implemented during the 9th Plan. |
Infrastructure development facilities were taken up in the Central Coordination Unit the PT Division in the Ministry. Concerned State Governments were provided assistance for taking up Development activities in the 7 protected areas. |
The Project Agreement was signed on 30/9/96 and became effective from 27/12/96. The Project will be implemented by the concerned States to achieve improved protected area management, village eco-development, environmental education awareness campaigns, etc. in the 7 identified areas viz. Gir. Nagarhole, Ranthambore, Periyar, Buxa, Palarmau and Pench. |
25. BENEFICIARY ORIENTED SCHEME FOR TRIBAL DEVELOPMENT:
The Scheme was launched during 1989-90 with an objective of rehabilitation of tribal families affected tinder the relocation plan of national parks and sanctuaries including project tiger reserves. The achievement during the VIII Plan and goals set for the IX Plan are as under:
(Rs in Crores)
|
Scheme |
VIII Plan Outlay |
Expdt. |
Physical Targets |
Physical achievements |
IX Plan outlay |
Goals set for Ninth Plan. |
|
Beneficiarv Oriented Scheme for 'Tribal Develop- ment. |
3.50 |
2.40 |
Relocation of tribal families outside the Protected areas. |
Out of 423 tribal families proposed for relocation outside the protected areas. relocation of 226 families completed. |
12.00 |
1000 tribal families are proposed to be relocated outside protected areas. |
16
26. NATIONAL ZOOLOGICAL PARK, NEW DELHI
The Scheme is being continued since 1955-56 with the objective of conserving and breeding rare and endangered animals, to conduct research regarding behaviour, reproduction and nutrition. to educate and entertain people about preservation of wildlife. It also provides assistance and guidance to other zoos in the country.
During VIII Plan, against the target of Rs. 1.95 Crores for developmental work in the NZP, Rs.1.30 Crores were spent. 28 construction/development works were completed. Ninth Plan outlay for NZP is Rs.4.00 Crores. Various construction/development works will be undertaken.
27. NATIONAL AFFORESTATION & ECO-DEVELOPMENT BOARD
The National Afforestation & Eco-Development Board (NAEB) was set up in August 1992. Its main functions are:
(a) Ecological restoration of degraded forest areas and adjoining lands
(b) Research and extension of research findings to disseminate new and proper technologies.
(c) Create general awareness to foster a people's movement for promoting afforestation and eco
development
(Rs in Crores)
|
Scheme/Activity |
8th Plan Outlay |
Financial Achieve- Ments for 8th Plan |
Physical Targets for 8th Plan |
Phvsical Ac~ievemen ts for 8th Plan |
IXth Plan outlay |
Goals set for IXth Plan |
|
Integrated Afforestation and Eco- Development Projects scheme |
200.00 |
203.12 |
3,79,558 ha |
2,98,981 ha, |
273.87 |
1,77,000 ha. |
|
Fuelwood / Fodder Projects Scheme |
158.00 |
154.19 |
4,20,084 ha. |
4 04,218 ha. |
200.00 |
3,67,000 ha. |
|
Non-Timber Forests Produce (including Medicinal Plants) Scheme |
55.00 |
56.47 |
1,00,000 ha. |
1,08,000 ha. |
80.50 |
74,000 ha. |
|
Seed Development Scheme |
9.00 |
7.81 |
25 States assisted |
11.30 |
All States to be assisted |
|
|
Grants-in-Aid Scheme (for Voluntary Agencies) |
9.50 |
7.51 |
338 Projects sanctioned |
10.00 |
NGO projects to be sanctioned |
|
|
Aerial Seeding Scheme
20 Point Programme
a) Seedling Distribution
b) Area coverage Others |
6.00 |
2.49 |
This scheme is in Abeyance since 1994-95
625.85 crores
5522200 ha. |
557.90 crores
5067031 ha |
28. BOTANICAL SURVEY OF INDIA (BSI)
Botanical Survey of India is a Subordinate Office of this Ministry with Headquarters at Calcutta and Circles and Field Offices at 9 centres in the country. The primary objectives of BSI are to explore plant resources of the country, to inventories and monitor phytodiversity. to document phytodiversity in the form of Flora of India, State Floras, District Floras and Floras of Fragile Eco- system. protected areas etc., to identified species. populations and Eco-systems which are under threat and need conservation including endemic, to undertake Ex-situ conservation of critically threatened taxa in the Botanical gardens through conventional and bio-technological methods and to explore the bio-perspectives of the plant wealth of the , country for sustainable utilisation through enthnobotanical studies etc. The achievements of BSI during, the 8th Plan and goals set for the 9th Plan are as follows:
(Rs. in Crores)
|
Schemes |
VIII Plan Outlav |
Expdt. |
Physical Targets |
Physical Achieve ments |
Ninth Plan Outlav |
Goals set for Ninth Plan |
|
Botanical Survey of India: a) Survey of Natural Resources (no. of tours) |
12.41 |
11.84 |
207 |
165 |
32.00 |
Exploration tours - 650 |
|
b) Endangercd Species (no. of Red Data Sheets to bc compiled) |
790 |
610 |
Coverage of species Under threat in Publication Red Data Book (ca. 750) |
|||
|
c) Scientific evaluation of selected useful plants (nos) |
14 |
10 |
||||
|
d) National database of type specimen. |
2770 |
2770 |
Preservation of specimens (ca.60.000) |
|||
|
e) Listing of Live Specimen Collection |
15.2100 |
15045 |
Collection of specimens (80000) |
|||
|
f) Publication. |
|
|
17 |
1 |
|
Publication (ca.250) |
29. ZOOLOGICAL SURVEY OF INDIA ~(ZSI)
Zoological Survey of India was established primarily to explore and inventories the faunal diversity' of the country and to collect and document baseline data in respect of taxonomy- geographical distribution, bio-ecology of various animal groups. The primary, objectives are 1. Exploration and survey of Fauna resources. 2. Taxonomic studies. 3. Statues survey of Endangered species. 4. Status survey of conservation areas. 5. Publication of results through departmental books and journals 6. Publication of Fauna of India series. 7. Maintenance and development of National zoological collections. The achievements of ZSI during the 8th Plan and the goals set for the 9th Plan are as follows :
(Rs. in Crores)
|
Scheme |
VIII Plan Outlav |
Expdt. |
Physical Targets |
Physical Achievements |
Ninth Plan Outlav |
|
Zoological Survey of India :Survey of States Fauna. |
11.83 |
Survey of 8 states. |
99 Survey in 8 states covering 60districts Completed. Faunal resources of Orissa. West Bengal and Delhi completed. |
32.00 |
|
|
Studies on Selected Eco- Systems |
States of Himachal Pradesh. Sikkim. Arunachal Pradesh. J&K. Gujarat. Ratasthan- Tripura. Manipur. Nagaland Mizoram Kerala and Andamans. |
187 Surveys in different states completed. Faunal diversity of Sikkim documented inventory of faunal component and publication of data taken. |
|||
|
Survey of Conservation area s including Tiger Reserves |
Important conservations areas of the country |
69 Surveys in different conservation areas of Prambiculam, Melghat. Gulf of Mannar, Tadoba. deserts. Valmuki Tiger Reserves. |
|||
|
Taxonomic studies |
Taxonomic studies of conservation areas and eco-systerns |
Fauna of West Bengal. Meghalaya. Nilgiri, Nanda Devi. Manas Tiger Reserves. Ujini Wetlands completed |
|||
|
Status of Endangered Species |
Status surveys of selected species |
Status survey of Capped Langur, Hoolock Gibben. Desert Cat. Chinkara. Hispid Hara, Golden Langoor. Nilgiri Langoor. Leaf Monkey. Rhesus Monkey. Hanurnan Langoor completed |
|||
|
Red Data Book on Vertebrates |
Preparation of Publications |
Completed |
* |
||
|
Fauna of India |
2 volurnes published -3 sent for publication and 2 volumes~ made press ready |
||||
|
EIA Programme |
|
|
|
33 EIA studies undertaken |
|
Goals for 9"' Plan
Survey of States Fauna.
8 states
Studies on Selected Eco-systems
7 Eco-systems
Survey of Conservation areas including Tiger Reserves
20% of the total conservation areas.
Taxonomic studies
6 States and 5 Eco-systenis.
Status of Endangered Species
20 species
Red Data Book on Vertebrates
Invertebrates part I
Fauna of India
8 volumes of Fauna of India
EIA Programme
As and when assigned.
30. ENVIRONMENTAL EDUCATION, AWARENESS & TRAINING
(Rs. in Crores)
|
Name of the Scheme |
8th Plan Outlay |
Actual Expdt. |
IXth Plan Outlay |
Physical Target/Achievements |
Goals set for Ixth Plan |
|
Environment Education & Training
Seminars/Sympo sia / Workshops |
17.65
1.40 |
15.09
0.89 |
18.00
1.50 |
No quantitative targets Were set for the schemes as such. However, the Targets set for various Programmes under the Scheme have been Successfully achieved. |
It is not possible to set any quantitative targets for these schemes. However, the existing programmes will be continued. |
31. ENVIRONMENTAL INFORMATION SYSTEM (ENVIS)
(Rs. in Crores)
|
Scheme / Activity |
8th Plan Outlay Plan |
Expdt. Plan |
IX Plan Outlay Plan |
|
ENVIS |
5.50 |
5.81 |
7.50 |
Targets:
i) During Eighth Plan period, nine new ENVIS Centres, on various subject areas were to be set up to develop the ENVIS network.
ii) A quarterly document namely. –`Paryavaran Abstracts' reporting research in the field of environment in the Indian context was to be published in every year during the plan period.
iii) Annual Report of the Ministry to be published by ENVIS every year.
iv) Networking among all the centres to be established for electronic communication with the ENVIS Focal Point in dissemination of information.
v) Query-answer service to be provided to the users.
Achievements:
i) All the tune new ENVIS Centres. in various subject areas oil environment, were set up during the plan period.
ii) Paryavaran Abstracts were published as per schedule during tile plan period.
iii) Annual Report of the Ministry was published by the ENVIS in each year during the plan period.
iv) Efforts were made by tile ENVIS for establishing E-mail service in order to have a direct electronic communication with its network partners. 17 ENVIS centres were provided with modem and hardware support to install E-mail facilities during the plan period.
V) The ENVIS network responded to about 30,000 queries in environment and its related fields during the plan period and provided substantive information to its users.
Goals set for IXth Plan
In addition to tile existing centres, a few centres under the priority areas, not covered so far, would be set up during the ninth plan period. All ENVIS Centres would be strengthened for developing the Homepage in their assigned areas for accessing information by the users concerned. In order to promote all online information, all ENVIS centres will be networked with the Focal Point in the Ministry and vice versa. It is also proposed that a Wide Area Network (WAN) would be installed at all ENVIS Centres not only to link with Internet but also liase with various other international databases in the field of environment and its associated areas for easy and quick accession of the desired information.
Achievements
Homepage for 17 centres have been developed. Centres are being networked and could be browsed through internet for getting information in the assigned subject areas.
32. CENTRES OF EXCELLENCE
(Rs. in Crores)
|
Name of the Scheme |
8th Plan Outlay |
Expenditure |
IX th Plan Outlay |
Goals set for the IX th Plan |
|
Centres of Excellence |
23.00 |
20.08 |
24.99 |
To strengthen awareness, research & training in the priority areas of environmental science through existing seven centres of excellence and to augment infrastructural and other facilities in these Centres. |
(Rs. in Crores)
|
Scheme/Activity |
8th Plan Outlay Plan Non-Plan |
Expenditure Plan Non-Plan |
IX Plan Outlay Plan Non-Plan |
|
NNRMS |
4.10 -- |
3.81 -- |
4.10 -- |
Targets:
Projects belonging 15 areas identified by the Bio-resource Committee were to the considered.
Achievements:
Out of i6 thrust areas, 20 areas have since been covered and 30 projects sanctioned.
Goals set for IX th Plan
The thrust areas identified by tile Bio-resource Committee will be covered in a phased manner and corresponding research projects will be supported for application of remote sensing technologies in the field of environmental sciences for optimal Utilisation of the natural resources.
Achievements
Out of 56 areas, about 30 thrust areas have been identified and 13 new research projects, in addition to the on-going projects, have been supported under this Scheme.
34. PARVAVARAN VAHINI
(Rs. in Crores)
|
Scheme/Activity |
8th Plan Outlay Plan Non Plan |
Expdt. Plan Non Plan |
IX Plan Outlay Plan Non Plan |
|
Paryavaran Vahini |
4.50 -- |
1.67 -- |
1.00 -- |
Target:
One Paryavaran Vahini has been constituted in each district which was selected on the basis of high incidence of pollution, density of tribal population and forest cover. 140 districts were identified for the setting up of Paryavaran Vahini.
Achievements:
Only 135 districts finally selected where Paryavaran Vahinis were set up. Token grant of Rs. 200/- p.m. was given to the each member of Vahini. As per the decision of the Ministry, the scheme is likely to be transferred to the various States without any financial commitment of the Ministry. The Planning Commission has already been communicated in this regard.
Goals set for IX th Plan
As per the decision of the Ministry. the scheme is likely to be transferred to the various States without any financial commitment of tile Ministry. The Planning Commission has already been communicated in this regard. Decision of the Planning Commission is yet to be received by the Ministry.
35. GRANTS-IN-AID TO PROFESSIONAL SOCIETIES
(Rs. in Crores)
|
Scheme / Activity |
8th Plan Outlay |
Expdt. |
IX Plan Outlay |
|
Grants-in-aid to Professional Societies |
0.50 |
0.23 |
0.50 |
Target :
Though no numerical figure was targeted, efforts were made to provide financial support to the Professional Societies and other appropriate institutions for developing activities and projects in the field of environment as well as to develop exhibition galleries and educational programmes relevant to tile ecology.
Achievements:
During the plan period about eight institutions were supported and no other worth supporting proposals were received in the Ministry.
Goals set for IXth Plan
Though numerical number for supporting the professional societies are not earmarked but efforts will be made to support various professional societies and other educational institutions to develop their activities and projects in tile field of environment as well as to develop exhibition galleries and educational programmes relevant to ecology, wildlife and environment.
Achievements
Proposals from various organisations have been received and are being considered by a Committee for providing assistance under this Scheme.
36. ENVIRONMENT IMPACT ASSESSMENT
(Rs. in Crores)
|
Name of the Scheme |
8th Plan Outlay |
Actual Physical Expdt. Targets |
Achievements |
IX th Plan Outlay |
Goals set for IX th Plan |
|
Environmental Impact Assessment
Sustainable Development Strategies
Development and Promotion of Clean Technologies |
15.00 |
14.25 |
To undertake new sectoral studies, set up ICPC, Demonstration projects |
25.80 |
|
|
EIA Authorities |
|
|
|
15.00 |
Provisions of grant in aid to National Environment Appellate Authority, Dahanu Taluka Environment Protection Authority, EIA Authority for National Capital Region and Loss of Ecology Authority for Tamil Nadu. |
37. ENVIRONMENTAL AUDIT, CLEAN TECHNOLOGY, ENVIRONMENTAL STATISTIC AND MAPPING
(Rs. In Crores)
|
Scheme /Activity |
8th Plan Outlay |
Actual Expdt. |
Targets / Achievements |
IX Plan Outlay |
Goals set for Ninth Plan |
|
Environmental Audit |
0.50 |
0.50 |
* |
0.60 |
** |
|
Environment Statistics & Mapping |
0.50 |
0.50 |
|
0.60 |
|
|
Adoption of Clean Technologies in Small Scale Industries |
0.50 |
0.50 |
|
0.60 |
|
* Physical Targets / Achievements
Environmental Audit
Physical Targets:
Promotion, sector-wise training programmes, sector-specific manuals.
Achievements:
Modular Environmental audit manuals prepared: 20 sector-wise training programmes conducted. Sector-specific manuals in r/o Sugar, Lube oil Re-refining industry have been prepared.
Environmental Statistics and Mapping
Physical Targets:
Achievements:
Adoption of Clean Technologies in Small Industries
Physical Targets:
Training and awareness programme, preparation of sector specific manuals, WM demonstration studies.
Achievements:
About 40 training and awareness programme conducted, sector specific manuals on pulp & paper pesticide formulations & textiles prepared. Demonstration studies in Electro-plating conducted.
**Goals set for IX th Plan
Environmental Audit.
Promotion of concept of environmental audit and for reducing pollution load in industry.
Achievements: Sector-wise training programmes and preparation of sector-specific manuals in selected sectors.
Environmental Statics and Mapping.
Preparation of envirornmental maps depicting polluting data relating to air, water. soil and noise for the metro cities and polluted areas.
Achievements: Environment atlas for metro-cities in India has been prepared.
Adoption of Clean Technologies in Small Scale Industries.
Training and awareness programmes, sector specific manuals, Waste Minimisation Studies.
Achievements: About 40 training programmes conducted. Sector specific manuals and WM demonstration studies in textile processing units, edible oil industry, dye and dye intermediate industry bulk drug industry were undertaken.
38. ASSISTANCE FOR ABATEMENT OF POLLUTION
(Rs. in Crores)
|
Scheme / Activity |
8th Plan Outlay |
Expdt. |
IX Plan Outlay |
Goals set for Ninth Plan |
|
Assistance for Abatement of Pollution |
7.00 |
8.22 |
12.75 |
Financial assistance for supporting equipment, studies, projects etc., to various SPCBs/UT PCCs etc., to meet the objectives of the Policy Statement for Abatement of Pollution. |
39. NATIONAL MUSEUM OF NATURAL HISTORY(NMNH)
(Rs.in Crores)
|
Programme |
VIII Plan Outlay |
Expdt. |
Physical Targets / Achievements |
IX Plan Outlay |
Goals set for IX th Plan |
|
NMNH |
10.00 |
7.19 |
* |
19.00 |
** |
* The NMNH consolidated its position in the area of non-formal environmental education with its diversified programmes and activities and also by way of organising similar programmes & activities in its Regional Museums of Natural History at Mysore, Bhopal and Bhubaneshar during the VIII Plan period.
The Regional Museum of Natural History at Mysore was inaugurated and opened to the public on 20th May, 1995.
The first phase of the building of the Regional Museum of Natural History, Bhopal was completed and Museum was inaugurated and opened to the public on 29th September, 1997.
The first phase of the building of the Regional Museum of Natural History. Bhubaneshwar is near completion.
The scientific collection work relevant to the exhibits and educational activities were made at the level of NMNH and Regional Museums of Natural History at Mysore and Bhopal.
The proposal for creation of posts for RMNH, Bhopal, Mysore and Bhubaneshwar is under process for obtaining approval of competent authority.
Indo-US Natural History Workshops were organised in India and USA. Under the Partnership Programmes three pairs of Museum personnel's were exchanged from NMNH and RMNH. Mysore with different US Natural History Museums.
** Acquisition of land and construction of building of NMNH.
Renovation and updating of existing NMNH galleries.
Completion of 2nd phase of galleries of RMNH, Mysore.
Completion of 2nd phase of building, of RMNH, Bhopal.
Completion of 2nd phase of galleries of RNINH, Bhopal and open air exhibits on eco-history of Central India.
Completion of 1st and 2nd phases of building of RMNH, Bhubaneshwar.
Setting up of National Photographic Index at NMNH.
Completion of first phase of Galleries of RMNH, Bhubaneswar.
40. CIVIL CONSTRUCTION UNIT
(Rs. in Crores)
|
Item |
VIII th Plan Outlay |
Expdt. |
Physical Target (No. of works) |
Achievements (No. of works) |
IX th Plan Outlay |
Goals for IX th Plan (No. of works) |
Achievements |
|
Forestry & Wild Life |
4.95 |
5.45 |
19 |
14 |
14.70 |
71 |
27 |
|
Ecology & Wild Life |
18.50 |
16.36 |
44 |
32 |
28.00 |
98 |
53 |
|
Environment / Education / Training / Extension |
2.00 |
4.82 |
4 |
2 |
9.00 |
27 |
3 |
|
Civil Works |
3.00 |
3.75 |
- |
- |
7.00 |
- |
- |
|
Grand Total |
28.45 |
30.38 |
67 |
48 |
58.70 |
196 |
83 |
41. NATIONAL RIVER CONSERVATION DIRECTORATE
(Rs. in Crores)
|
Scheme / Activity |
8th Plan Outlay |
Expdt. |
Target Achievements |
IX Plan Outlay |
Goals set for Ninth Plan / Achievements * |
|
National River Conservation Directorate.
|
193.01
149.00
41.00 -- -- |
152.15
131.75
30.54 -- -- |
76Schemes 65Schemes
176 Schem. 8 Schemes
110 Schemes -- -- -- -- --
|
24.50
500.00
150.00 25.00 0.50 |
The goal of the NRCP is to reduce pollution in the major rivers by executing pollution abatement measures such as interception and diversion and treatment of domestic sewage, undertaking river front works, etc. The projected target of Rs. 25 crore for NLCP is likely to be achieved. Achievements: The following no. of Schemes have been completed under the IX Plan so far: GAP-I = 2 GAP-II = 57 NRCP = 37 |
OBJECTIVE
The main objective of the river action plans is to improve the water quality of the rivers to bathing class standards by preventing pollution load reaching the river by under taking works like (i) interception & diversion works to capture the raw sewage flowing into the river through open drains and divert them for treatment, (ii ) sewage treatment plant for treating the diverted sewage, (iii) low cost sanitation works to prevent open defecation oil river banks, (iv) electric and improved wood based crematoria to conserve the use of wood and help in ensuring proper cremation of bodies brought to the burning ghat, (v) river front development works such as improvement of bathing ghats etc. and (vi) other minor misc. works.
ACHIEVEMENTS IN THE 8th PLAN
Ganga Action Plan Phase-1
Out of 261 schemes sanctioned, 250 schemes had been completed by the end of the 8th Plan. A sewage treatment capacity of 683 mld has been created under the programme so far. Out of the project outlay of Rs. 462.04 crore, an amount of about Rs. 447 crore had been spent on the programme.
Ganga Action Plan Phase - II
The total project cost of GAP Phase-II is Rs. 1229.87 crore which includes the following components.
- Under Yamuna Action Plan, out of the project outlay of Rs. 496.45 crore an expenditure of the Rs. 116.79 crore had been incurred by the end of the 8th Plan. 136 schemes were sanctioned and 11 were completed.
- Under Gamati Action Plan, out of the project outlay of Rs. 58.11 crore an expenditure of the Rs. 5.40 crore had been incurred. 19 schemes were sanctioned.
- Under Damodar Action Plan, out of the project outlay of Rs. 22.41 crore an expenditure of the Rs. 0.32 crore had been incurred.
- Under Ganga Action Plan Phase-II, out of tile project outlay of Rs. 652.00 crore an expenditure of the Rs. 9.24 crore had been incurred. 12 schemes were sanctioned.
National River Conservation Plan
Under this action plan out of the total project outlay of Rs.707.00 crore an expenditure of the Rs. 30.54 crore had been incurred. 110 no. of Detailed Project Reports were sanctioned under this action plan.
Goals set for the 9th Plan
The Yamuna Action Plan which is an important component of the Ganga Action Plan to be completed by 2000 A.D. The other components of the Ganga Action Plan are also to be pursued for completion in the Ninth Plan.
Considerable progress towards ensuring the early completion of the NRCP to be achieved.
42. WETLAND CONSERVATION PROGRAMME
(Rs. in crores)
|
Name of Acitivity |
8th Plan Outlay |
Expdt. |
Physical Targets |
Achievements |
9th Plan Outlay |
Physical Targets |
Achievements |
|
Wetland Conservation Programme |
6.80 |
6.60 |
* |
** |
18.00 |
*** |
**** |
*8 Plan Physical Targets:
- Convening of meetings of National Committee on Wetlands.
- Convening of meetings of Research Committee on Wetlands.
- Organism- of Workshops and Training Programmes.
- Preparation of guidelines of MAPs of Wetlands.
** Achievements During 8th Plan:
***Targets for 9th Plan:
- Preparation of MAP and release of funds to the State Governments in respect of identified wetlands. MAP include various activities like data collection and survey, control of encroachment, eutrophication abatement, aquatic weed control, identification of wetlands, wetland mapping, landscape planning, hydrology, wildlife conservation, fisheries development and environmental awareness.
****Achievements so far during 9th Plan:
43. CENTRAL POLLUTION CONTROL BOARD
(Rs. in Crores)
|
Scheme / Acitivity |
8th Plan Outlay |
Expdt. |
Physical Targets |
Achievements |
9th Plan Outlay |
Achievements |
|
Central Pollution Control Board |
16.00 |
20.83 |
* |
** |
32.00 |
*** |
* Physical Targets
To undertake survey and monitoring for assessment of water and air quality, undertake analysis of pollutants, organised training programmes, develop standards and guidelines, compliance of industries to the prescribed standards, inventorisation of hazardous waste generating, industries and organise mass awareness, programmes.
** Achievements
Regular surveys carried out for assessment of pollution from stationary and mobile sources and air and water quality monitoring programmes were taken up with SPCB/PCC. Samples analysed for air, water and soil anaIytical quality control tests were organised for the laboratories of SPCBs. Standards have been developed in respect of important category of industries and also developed guidelines for the assistance to the industries. Training programmes were orgarnised for SPCB/PCC and for industries personnel. The training programmes were taken up under the World Bank Programme. Regular follow-ups were taken in respect of 17 categories of highly polluting industries and follow-up actions maintained with the State Boards in respect of implementation of action points for restoration of environmental quality in critically polluted areas. CPCB participated in various exhibitions organised by different agencies. Technical Reports were brought out, disseminating information on pollution. Inventorisation of hazardous waste generating industries taken up in different States.
***Goals sets for Ninth Plan
Continuation of activities taken up in VIII Plan with attention on Environmental Monitoring assessment of Pollution Development of Environmental standards and action plans. Promotion of infrastructure and capacity up-gradation programmes.
44. ASSISTANCE TO BOTANIC GARDENS
This scheme is aimed at conservation and propagation of plant and genetic resources. Its achievements during the Eight Plan and goals for the Ninth Plan are as under:
(Rs. in Crores)
|
Programme |
8th Plan Outlay |
Expdt. |
Physical Targets |
Physical Achievements |
9th Plan Outlay |
Goals set for Ninth Plan |
|
Assistance for Regional Botanical Gardens |
1.5 |
3.18 |
One time financial assistance to 35 botanical gardens for improving their infrastructural facilties |
40 Botanical Gardens were provided financial support |
7.00 |
To provide financial assistance to about 50 botanical gardens for improvements of infrastructural facilities |
45. RESEARCH AND ECOLOGICAL REGENEKATION(R&D)
(Rs. in Crores)
|
Scheme / Activity |
8th Plan Outlay |
Expdt. |
Physical Targets |
Physical Achievements |
9th Plan Outlay |
|
Research and Development |
18.00 |
15.85 |
Initiation of new projects: 200 Servicing of ongoing projects: 808 (cumulative) Review & monitoring of ongoing projects: 740 (cumulative) Dissemination of research results: publication of executive summaries |
This is a continuing scheme. The objectives are promotion of research in multidisciplinary aspects of environment protection, conservation and development with capacity building. During the period 197 projects were initiated. A total of 740 projects were reviewed. Servicing of ongoing projects - 808 (cumulative). A Compendium of executive summaries was published. |
20.00 |
*Goals set for IX th Plan: The scheme will be continued.
Achievements: During the period 1997 to 1999 (31.10.99) 83 new projects were initiated. 90 projects were completed and 110 projects remained operational. A total of 220 (cumulative) projects were reviewed and evaIuated.
46. G.B. PANT INSTITUTE OF HIMALAYAN ENVIRONMENT & DEVELOPMENT
(Rs in Crores)
|
Programme |
VIII Plan Outlay |
Expdt |
Physical Targets |
Physical Achievements |
Ninth Plan Outlay |
|
G.B. Pant Institute of Himalayan Environment & Development |
22.23 |
21.32 |
|
|
36.00 |
Goals set for IXth Plan
1 . Strengthening of six R&D Core programmes initiated in the preceding plan period at HQs and through 4 units. Initiation of a major new programme on indigenous knowledge systems and two more units.
2. Completion of phase I of construction at Katarinal, Kullu and Panthang. Initiation of works at Garbwal (Srinagar) and NE (Itanagar) units.
Remarks
(1 &2) approved by Science Advisory Committee and Board of Governors of the Institute.
47. INTEGRATED ACTION ORIENTED R&D AND EXTENSION PROJECTS IN HIMALAYAN REGION.
(Rs in Crorcs)
|
Programme |
VIII Plan Outlay |
Expdt. |
Physical Targets |
Achievements |
Ninth Plan Outlay |
Goals set for 9th Plan |
|
Integrated Action Oriented |
1.77 |
1.79 |
To support location specific activities throughout the Indian Himalayan Region |
56 Projects were sanctioned and 32 projects were completed |
5.00 |
Continuation of support to ongoing projects and Initiation of new location Specific projects throughout Indian Himalayan Region. |
Remarks
All on-going projects would be completed during the plan period and several new projects would be initiated. Dissemination of findings would be augmented.
48. HAZARDOUS SUBSTANCES MANAGEMENT
(Rs in crore)
|
Programme |
VIII Plan Outlay |
Expenditure |
Targets/ Achievement |
IXth Plan Outlay |
Goals set for IXth Plan |
Achievement so far |
|
Hazardous Substance Management |
12.40 |
9.16 |
* |
22.00 |
** |
*** |
*Target/Achievements:
i) Establishment Management Structure in 18 States.
ii) Red Book updated.
iii) New Regulation notified.
iv) Amendment to the Rules.
v) Implementation of Acts and Rules in progress.
vi) Guidelines prepared.
vii) Developmental Projects taken.
viii) Training on Chemical Accidents conducted.
ix) Data Base on Chemical Set-up.
x) Financial Assistance provided to 16 states for identification of H.W. Disposal Site.
xii) Pilot Projects on Solid Waste Management initiated.
xii) World Bank Assistance Project on Industrial Safety & Disaster Prevention & 14W Management in 4 States initiated.
"Goals set for IXth Plan
i) Strengthening of HSM structure in the States.
ii) Accident prevention and emergency preparedness.
iii) Crisis Management during chemical accidents.
iv) Notification of new regulations and amendments.
v) Implementation of the notified Rules on chemicals. Hazardous Waste, Bio-Medical Waste, Micro- organisms etc.
vi) Hazardous waste management site identification, site remediation and establishment of disposal facilities.
vii) Management of municipal solid industrial waste.
viii) Training of personnel and public Awareness.
ix) Publication of documents and establishment of database of hazardous substances.
***Achievements so far
i) HSM structures created and are being strengthened.
ii) Off-site Plans prepared in 12 Districts.
iii) Central Crisis Group and Co-ordination Committee Constituted. meetings conducted.
iv) Notifications for new regulations. namely Bio-Medical Waste Rules. Plastic Bags and Fly Ash utilisation.
v) Draft Rules on Solid Waste Management published and amendments on H.W. Rules and Chemical Rules are being notified.
vi) 15 HW sites have been identified.
vii) Steps being taken for establishment of disposal facilities.
viii) Training being conducted.
ix) Pilot Plants for use of Municipal and Industrial Solid Waste are being set up.
49. BIODIVERSITY CONSERVATION
|
Activity |
8th Plan Outlay |
Expdt. |
Physical Targets |
Achievements |
IX Plan Outlay |
|
Bio-diversity |
1.50 |
0.95 |
Initiating preparation of Status Report, |
Discussion held on preparation of Status Report, National Plan and Legislation on Biodiversity |
10.00 |
Goals set for IX Plan
- To facilitate implementation of National Action Plan on Bio-diversity.
- Formulation of legislation on bio-diversity.
50. CONSERVATION AND MANAGEMENT OF MANGROVES AND CORAL REEFS
The Scheme on Conservation and Management of Mangroves and Coral Reefs was initiated in 1986 with the objectives of conservation and protection of the Mangrove Eco-system from further degradation, afforestation of degraded Mangroves areas, Maintenance of genetic diversity especially of the threatened and endemic species and creation of awareness among the people on importance of Mangrove Ecosystem and the need for conservation. The achievement of the scheme during the 8th Plan and goals set for 9th Plan are given below:
(Rs. in Crores)
|
Programme |
VIII Plan Outlay |
Extpdt. |
Physical Targets |
Physical Achievements |
Ninth Plan Outlay |
Goals set for Ninth Plan |
|
Conservation & Management of Mangroves and Coral Reefs |
4.50 |
3.60 |
15 MAPs on Mangroves & 4 MAPs on Coral Reefs |
12 MAPs on Mangroves & 4 MAPs on Coral Reefs |
7.00 |
19 Management Action Plans for Conservation of Mangroves & MAPs on Coral Reefs and 15 Research Projects on Mangroves & Coral Reefs to be undertaken. |
51. BIOSPHERE RESERVE
This scheme is intended to conserve representative ecosystems. 10 Biosphere Reserves have been set up. The achievement during the VIII Plan and goals set for IX Plan are as under:
(Rs. in Crores)
|
Programme |
VIII Plan Outlay |
Extpdt. |
Physical Targets |
Physical Achievements |
Ninth Plan Outlay |
Goals set for Ninth Plan |
|
Biosphere Reserves |
12.00 |
11.69 |
Funding to state Govts. For identified items of activities in 8 Biosphere Reserve and initiation of new research projects in those reserves |
Proposals submitted by the State Governments were funded for approved items of activities in 8 Biosphere reserves 32 research projects were also funded |
16.00 |
To designate 4 new sites as Biosphere Reserves and to assist State Governments for existing Biosphere Reserves and financial assistance for R & D in these reserves. |
52. INTERNATIONAL COOPERATION
|
Scheme / Activity |
8th Plan Outlay |
Expdt. |
IX Plan Outlay |
Goals set for Ninth Plan |
|
International Co-operation |
49.18 |
122.89 (Excess is due to implementation of Externally aided Project, Indo-Canada Environment Facilities (ICEF) |
148.00 (including 115 crore for EMCB Project) |
|
Target/Achievements
In IC Division the expenditure is, mainly on Foreign Travel, Contributions to UN and other International organisations and on the Externally Aided Projects, i.e., ICEF projects under the UNDP/CCF and the World Bank assisted Delhi Urban Environment Management & Infrastructure Improvement Project.
53. ENVIORNMENTAL POLICY AND LAW
|
Scheme / Activity |
8th Plan Outlay |
Expdt. |
IX Plan Outlay |
Physical Targets / Achievements |
Goals Set for IXth Plan |
|
1. Environment Policy & Law Scheme |
0.25 |
0.15 |
5.00 (including Environment Commission and Tribunals) |
* |
|
|
Activities (a) Environment Policy & Legislation
|
|
|
|
|
Existing activities will continue |
|
(b) Eco-mark scheme |
|
|
|
|
Publicity programms. Financial assistance for Comparative Testing Programmes. Publication of notification and development of criteria |
|
(c) Comprehensive National Environment Policy |
|
|
|
|
Preparation of a Comprehensive National Environmental Policy |
|
(d)Trade & Environment |
|
|
|
|
Holding seminars and preparation of Position Paper |
|
2. National Environment Tribunal |
- |
- |
- |
- |
Setting up of benches of the NETA |
Physical Target :
a) Enactment of Acts. Publication of Notification under pollution Acts.
b) Launch of publicity campaign. Development of criteria.
Physical Achievements:
a) Enacted:
National Environment Tribunal Act.
National Environment Appellate Authority Act.
10 notification published.
b) 10 Project were awarded.
19 notification published.
54. INDUSTRIAL POLLUTION CONTROL PROJECTS: (EXTERNALLV AIDED SCHEMES)
WORLD BANK AIDED INDUSTRIAL POLLUTION PREVENTION PROJECT
(Rs. in Crores)
|
Name of the Scheme |
VIII Plan Outlay |
Actual Expdt. |
IX Plan Outlay |
Goals set for IX Plan |
|
World Bank aided Industrial Pollution Control Project
|
90.00 |
64.4 |
96.00 |
Not operative since 1.4.999
|
Physical Targets for VIIIth Plan
1 . World Bank aided Industrial Pollution Control Project.
Procurement of equipment for 4 SPCBs viz. UP. Tamil Nadu. Gujarat & Maharashtra.
Construction of Labs for 4 SPCBs.
Training for SPCB personnel.
Construction of CETPs.
Awarded for Demonstration Projects.
Award of projects under TA component.
Physical Achievements for VIIIth Plan
All the identified equipments were procured
Laboratories have been constructed at UP, TN and Maharashtra and SPCBs
Training has been imparted to PCB personnel in the various subjects of Environment Management
83 CEYPs have been constructed
12 Demonstration projects have been completed
11 small projects have been sanctioned under this component
55. TAJ PROTECTION MISSION
|
Scheme / Activity |
8th Plan Outlay |
Expdt. |
Target / Achieve-ments |
IX Plan Outlay |
Goals set for Ninth Plan |
Achievements |
|
Taj Projection Mission |
- |
- |
- |
200.00 |
Ten schemes have been formulated under this project for overall improvement of Environment in and around the Taj Mahal |
All schemes under this project are at various stages of completion |
56. TAXONOMY CAPACITY BUILDING PROJECT
|
Scheme / Activity |
8th Plan Outlay |
Expdt. |
Target / Achieve-ments |
IX Plan Outlay |
Goals set for Ninth Plan |
Achievements |
|
Taxonomy capacity building |
- |
- |
- |
7.50 |
To build capacity in taxonomy in priority gap areas |
Programme initiated in 1999-2000 |
57. ENVIRONMENTAL MANAGEMENT CAPACITY BUILDING TECHNICAL ASSISTANCE PROJECT(WORLD BANK AIDED)
The project started in September 1997 only and hence no review of overall performance during Eighth Plan is not involved.
(Rs. in Crores)
|
Name of the ActivityGoals set for IXth Plan |
Achievements |
|||
|
Environmental Management Capacity Building Technical Assistance Project |
115.00 |
* |
** |
|
*Goals set for IXth Plan
The main objectives tinder the project are formulation of Environmental Research programmes by setting priority areas, strengthening of teaching and research in economics, decentralisation of environmental awareness, strengthening environmental legal capacity of the Ministry, enhance capacity of number of mining instructions to improve monitoring compliance of environmental policy and standards proposed new sites for industrial estates upgrade India's air pollution monitoring support environmental related programmes in Gujarat to mitigate adverse environmental impacts of environmental problems.
** Achievements
Project implementation plans for all the sub-components included in the project have been prepared. Procurement of national and international consultants has been finalised including requirement of equipment and staff. Inception reports have been received wherever necessary. Monograph on ecology and economics and under-graduate textbook in environmental economics completed. For environmental law 6 training and fellowship programmes were organised. Review of some policies/standards/acts relating to mines and minerals have been completed. Mapping of 86 districts has been completed for preparation of district zoning atlas. Collection of primary data for Coastal Zone Management has been completed and draft guidelines for posts and harbours completed.
58. INDIAN INSTITUTE OF BIO-DIVERSITY (IIB)
The Institute is proposed to be set up at Itanagar, Arunachal Pradesh during 1999-2000 as an autonomous institute of this Ministry, under Societies Act to design and conduct research on various aspects of Bio-diversity. The goals set for the 9"' Plan are as under.
(Rs. in Crores)
|
Name of the Activity |
VIIIth Plan Outlay |
Actual Expdt. |
Physical Targets / Achievements |
IXth Plan Outlay |
Goals set for Ninth Plan |
|
Indian Institute of Bio-diversity |
- |
- |
- |
1.50 |
To develop infrastructure buildings, To recruit staff, design and conduct research in priority areas. |