CHAPTER II - A
& B
REVIEW OF OVERALL PERFORMANCE
FOR THE 9TH PLAN
(I) The Ministry of Environment & Forests was allocated an outlay of Rs.1200 crores for its 8th Plan 1992-97. The actual expenditure in 1992-93 was Rs.274.65 crores, in 1993-94 it was Rs.303.52 crores, in 1994-95 Rs.328.25 crores, in 1995-96, Rs.296.64 crores and in 1996-97 it was Rs.428.84 crores, making a total of Rs.1631.90 crores. The sector-wise and year wise details of outlays/expenditure is as follows:
Table-A: Sector wise/Year wise approved Outlays & Expenditure under VIIIth Plan.
(Rs. in Crores)
|
Sector |
8th Plan Outlay Original |
Outlay1992-93 |
Expdt. 92-93 |
Outlay93-94 |
Expdt. 93-94 |
Outlay 94-95 |
Expdt. 94-95 |
Outlay 95-96 |
Expdt. 95-96 |
Outlay96-97 |
Expdt. 96-97 |
|
1 |
2 |
3 |
4 |
5 |
6 |
7 |
8 |
9 |
10 |
11 |
12 |
|
Environ-ment
NRCD
NAEB
Forests & Wildlife |
325
350
275
250 |
48.00
55.00
115.00
62.00 |
45.09
54.19
114.45*
60.92 |
70.00
65.00
98.00
85.00 |
71.15
64.91
90.33
77.13 |
79.00
78.00
103.00
100.00 |
103.52
31.34
103.13
90.26
|
80.00
79.00
104.00
107.50 |
63.00
42.09
93.18
98.37 |
125.00
106.00
90.00
148.40 |
124.18
121.53
87.55
95.58 |
|
Total |
1200 |
280.00 |
274.65 |
318.00 |
303.52 |
360.00 |
328.25 |
370.50 |
296.64 |
469.40 |
428.84 |
* During 1992-93, the then National Wastelands Development Board was bifurcated into two separate Boards. NWDB was transferred to Department of Wastelands Development and NAEB was retained in Ministry of Environment & Forests. The allocation of Rs.115.00 crores was for both the boards. The expenditure of Rs. 114.45 crores relates to both the Boards. Expenditure under NAEB was Rs.72.736 crores during 92-93.
Table-B: Sector-wise Plan outlay & Expenditure in percentage under the VIIIth Plan
(Rs. in Crores)
|
Sector
|
8th Plan Outlay Original |
Total Outlay Revised |
Total Expdt. |
Allocations (% increase over original outlay) |
Expdt. (% increase over original outlay) |
|
1 |
2 |
3 |
4 |
5 |
6 |
|
Environment
NRCD
NAEB
Forests & Wildlife |
325.00
350.00
275.00
250.00 |
402.00
383.00
510.00
502.90 |
406.95
314.07
488.64
422.24 |
23.69
9.42
85.45
101.16 |
25.21
(-)10.27
77.68
68.90 |
|
Total |
1200.00 |
1797.90 |
1631.90 |
49.82% |
36.00% |
Notes:
- Increase in outlays/expenditure over original approved Plan outlay in case of NAEB is due to the fact that the major schemes of NAEB were got approved from CCEA at enhanced outlays for 8th FYP so as to increase area coverage under afforestation/Eco-development activities.
- Increase in outlays/expenditure over original approved Plan outlay in case of Environment is due to the fact that year-wise outlays for certain schemes like Environmental Impact Assessment, Industrial Pollution Control Project, Conservation & Survey etc. were approved by Planning Commission at increased levels.
- Increase in outlays/expenditure over original approved Plan outlay in case of Forest and Wildlife is due to the fact that the major schemes like World Bank aided Forestry Research Education Extension Scheme of ICFRE, Eco-Development in and around Protected Areas, Project Tiger, Development of National Parks and Sanctuaries, Project Elephant etc. were approved at enhanced level in VIII Plan due to increased activities.
- Under NRCD, during VIIIth Plan, except GAP Phase I which was 100% central
funded, all schemes are implemented on a 50:50 sharing basis.
6. OUTLAY FOR THE NINTH PLAN AND ANNUAL PLANS 1997-98, 1998-99, 1999-2000 and 2000-2001.
Overall Plan outlay/expenditure
sector-wise
(Rs. in Crores)
|
Year |
Environment |
NRCD |
Forests & Wildlife |
NAEB |
Total |
|
9th Plan approved outlay 1997-98Outlay Expenditure 1998-99Outlay Expenditure
Expenditure 2000-2001 Outlay |
887.00 198.00 115.37 210.91 144.00 191.50 118.11 229.90 |
766.84 109.00 99.44 191.70 107.48 200.00 157.24 210.05 |
860.00 144.70 122.70 209.13 174.24 215.00 178.10 258.05 |
500.00 92.00 69.19 92.35 72.05 93.50 86.45 152.00 |
3013.84 543.70 406.70 704.09 497.77 700.00 539.90 850.00 |
NRCD - National River Conservation Directorate,
NAEB- National Afforestation and Eco-Development Board.
7.
The scheme wise details of outlay, expenditure, physical targets and achievements during the 8th Plan period in all the sectors as above, and, the outlay and the goals set for 9th Plan are as below:
8. INDIRA GANDHI NATIONAL FOREST ACADEMY (IGNFA), DEHRA DUN
The IGNFA is responsible for in-house training for Indian Forest Service Probationers. Its
achievements during the VIII Plan and goals for the IX Plan are as under:-
(Rs. in Crores)
|
Programme |
VIII Plan Outlay |
Expenditure
|
Physical Targets |
Achievements |
9th Plan Outlay |
Goals set for 9th Plan. |
|
Training of IFS Probationers. |
7.03 |
7.03 |
* |
Fully Achieved |
15.00 |
** |
* Training of IFS Probationers recruited from 1992-98
Compulsory courses for in-service IFS officers.
Induction Training Programme .
**Training of IFS Probationers.
Modernization of Academy.
Upgradation of Computer Lab.
Construction of Pavilion.
Improvement of Hostel facilities.
9. STATE FOREST SERVICE AND RANGERS COLLEGES
This Institute caters to the training requirement of SFS Officers of different States. Its achievements during the VIIIth Plan and goals for the IXth Plan are as under:
(Rs. in Crores)
|
Programme |
VIII Plan Outlay |
Expdt. |
Physical Targets. |
Physical Achieve-ments |
Ninth Plan Outlay |
Goals set for Ninth Plan |
Achievements so far |
|
SFS & Rangers Colleges |
4.05 |
3.97 |
6.00
|
||||
|
Training of SFS Officers |
15 courses |
12 courses |
15 courses
|
3 courses |
|||
|
Training of Forest Rangers |
5 courses |
5 courses |
2 courses |
-- |
|||
|
Special Refresher Course for In-service SFS Officers |
59 courses |
59 courses |
55 courses |
32 courses |
|||
|
Course on Computer Application in Forestry for In-service SFS Officers |
17 courses |
17 courses |
34 courses |
27 courses |
|||
|
Course on Social Forestry & Sustainable Rural Development |
2 courses |
2 courses |
5 courses |
7 courses |
|||
|
Thematic Course on Bio-diversity Conservation |
1 course |
1 course |
5 courses |
9 courses |
|||
|
Promotion related courses for ACFs and Forest Rangers |
-- |
-- |
8 course (4 courses for ACFs and 4 for Forest Rangers) |
3 courses (For Forest Rangers) |
10. INDIAN INSTITUTE OF FOREST MANAGEMENT (IIFM), BHOPAL
IIFM, Bhopal is an autonomous Institution under the Ministry established for the development of managerial capacity in the forestry sector. Its achievements during VIIIth Plan and goals for the
Ninth Plan are as under:-
(Rs. in Crores)
|
S. No. |
Programme |
VIII Plan Outlay |
Expdt |
Physical Targets. |
Physical Achieve-ments |
Ninth Plan Outlay |
Goals set for Ninth Plan |
|
|
IIFM |
6.50 |
10.34 |
|
|
12.50 |
|
|
a)
b)
c) |
Management Development Programme (MDP)/ Courses & Seminars
Post-Graduate Diploma in Forestry Management (PGDFM)
M.Phil level Course on Resource Management (MRM). |
|
|
MDP 109 Nos. 5+3 batches
PGDFM 5 batches
MRM 3 batches |
MDP 79 Nos. 5+3 batches
PGDFM 5 batches
MRM 3 batches |
|
131MDP and 19 workshops
Every year 35 students in PGDFM, 5 seats to SAARC students, 5 seats for foreign nationals/NRIs,
20 persons in MRM. Ph.D.Programmes10 numbers |
11. INDIAN COUNCIL OF FORESTRY RESEARCH & EDUCATION (ICFRE), DEHRADUN.
This is an autonomous body under this Ministry for research and education activities relating to forestry. It has 8 institutes and 3 satellite centres spread all over the country. Its achievement during VIII Plan and goals for Ninth Plan are as under:-
(Rs. in Crores)
|
S.No. |
Programme |
VIII Plan Outlay |
Expdt. |
Physical Target/ Achievements |
Ninth Plan Outlay |
Goals for Ninth Plan |
|
1. |
Research a) General Component |
90.00 |
110.44
|
* |
260.00 (including externally aided component |
** |
|
|
b) Externally Aided Component |
90.00 |
56.69 |
* |
|
**
|
|
2 |
Education & Training |
4.00 |
4.49 |
* |
8.00 |
**
|
*ICFRE(HQ)
ICFRE(HQ) provides necessary guidance, finance, co-ordination and monitoring to its Institutes. Various administrative and technical issues regarding forestry research education & extension are coordinated. These works included allotment of budget, finance, administrative and service matter; recruitment and deputation of staff; monitoring evaluation, supervision and control of externally aided projects, etc; education under forest related matters was imparted through various PG Diploma courses and fellowships and research associateship were awarded. The relevant extension materials and important research findings were published. The important research activities in different research Institutes of the Council for the plan period were as follows:-
iii) Institute of Wood Science & Technology, Bangalore - Surveys on sandal provenances and collection of seed from different areas for provenances trials and establish clonal seed orchards of superior genotypes; developed tissue culture protocol for sandal and study the sandal wood pathogen. Study variation in wood and oil of sandle from various provenances.
moisture stress; Evaluate and develop irrigation water management for tree species and in different agroforestry systems to maximise productivity; Develop tissue culture protocol in propagation of superior genotypes of fodder yield trees, etc.
variation in seed formation, viability and germination of important agro-forestry species; Develop necessary nursery technology for local agroforestry species.
vii) Himalayan Forest Research Institute, Shimla - Evaluate the suitability of plant species for cold desert areas and develop effective establishment techniques; Eco-rehabilitation of mined damaged areas; Survey and establishment of 1000 ha. seed stands and seed production areas.
demonstration sites with soil amendments and site preparation application of bio-fertilisers and collection of growth data; Socio-ecological survey on 10 locations in Vindhyan hill tracts and Gangetic plains.
** Important research activities in different Institutes of the Council for the IXth Plan have been outlined below:
improvement programme; Studies on mangrove forests, non-wood forest products, Biodiversity conservation; Training to forest officials, NGOs and farmers.
12. INDIAN PLYWOOD INDUSTRIES RESEARCH & TRAINING INSTITUTE (IPIRTI), BANGALORE
The Indian Plywood Industries Research and Training Institute(IPIRTI) is an autonomous body of the Ministry of Environment and Forests, Government of India. It was established in 1962 as Indian Plywood Manufacturers Research Association (IPMRA) at the initiative of the plywood industry with participation of the Council of Scientific and Industrial Research (CSIR). The Institute was re-designated as Indian Plywood Industries Research Institute in 1970. The administrative control of the Institute was transferred to the Ministry of Environment & Forests in 1990. The objectives of the
Institute are:-
(Rs. in Crores)
|
Programme |
VIII Plan Outlay |
Expdt. |
Physical Targets/Achievements |
Ninth Plan Outlay |
Goals set for Ninth Plan |
|
IPIRTI |
2.16 |
2.21 |
* |
4.50 |
** |
* The Institute’s Research & Development focus during VIII Plan period was on the following key areas:
The Institute is credited with the development of technologies, goal directed R & D Programmes, purposeful efforts to effect improvements in the existing process techniques. The forces of competition and changes in technologies needed were considered in formulating R & D Programmes.
** The Ninth Plan R & D and Training programmes of the Institute continue to place emphasis on
conservation of wood by upgradation of technology and intensive manpower training. The Institute
R & D focus during the Ninth plan period is as follows:
with due emphasis on critical areas of production technology.
SURVEY AND UTILISATION OF FOREST RESOURCES
13. FOREST SURVEY OF INDIA (FSI):
The FSI is responsible for survey and utilisation of forest resources in India and its achievements during the VIII Plan and outlay proposed for the IX Plan are as under:
(Rs. in Crores)
|
S.No.
|
Programme |
VIII Plan Outlay |
Expenditure |
Ninth Plan Outlay |
|
1. |
Application of Remote Sensing Techniques in Survey of Forests. |
19.21 |
13.79 |
15.00 |
The physical targets and achievements of FSI during the VIII Plan and the goals set for the IX Plan are as under:-
(Rs. in Crores)
|
S. No. |
Programme |
Units |
Physical Targets |
Physical Achievements |
Goals for Ninth Plan |
|
1. |
Forest Inventory |
Area in Sq. Km. |
1,27,057 |
1,67,571 |
1,70,000
|
|
2. |
Data Processing |
-do- |
1,20,043 |
1,15,481 |
1,70,000
|
|
3. |
Thematic Mapping |
1:50,000 scale |
1,300 |
1301 |
670 |
|
4. |
Vegetation Mapping |
1:250,000 scale |
909 |
911 |
905
|
|
5. |
Training |
No. of Persons Trained |
420 |
613 |
450 |
|
6. |
Special Study |
-- |
6 |
13 |
20
|
14. FOREST CONSERVATION
Under the Scheme "Strengthening of Forestry Division", six Regional Offices are implementing the Forest Conservation Act and monitoring of environmental clearances accorded by the
Ministry under Environment Protection Act. The physical and financial achievements during the VIII Plan and goals set for IX Plan are as under:-
(Rs.in Crores)
|
S. No. |
Programme |
VIII Plan Outlay
|
Expdt. |
Physical Targets |
Achiev-ement |
Ninth Plan Outlay |
Goals set for Ninth Plan |
|
1. |
Strengthening of Forest Division:
|
9.55
|
9.56
|
4370
--
--
2140 |
4194 1196 (site inspection) 1431
615
2527 |
20.00 |
4750
2000 |
15. FOREST PROTECTION AND REGENERATION
The Scheme "Association of Scheduled Tribes and Rural Poor in Regeneration of Degraded Forests" was started in 1992-93 on pilot basis with 37 projects in 9 States, namely, Andhra pradesh, Bihar, Gujarat, Madhya Pradesh, Maharashtra, Rajasthan, Orissa, West Bengal and Karnataka. Its achievement during the VIII Plan and goals set for the IX plan are as under:-
(Rs.in Crores)
|
Programme |
VIII Plan Outlay |
Expdt. |
Physical Targets |
Physical Achievements |
Ninth Plan Outlay |
Ninth Plan Physical Target |
|
Association of Scheduled Tribe & Rural Poor |
7.35 |
7.36 |
10.550 ha. Rehabilitation of degraded Forest lands |
8330 ha. of degraded forests were rehabilitated and remaining 2240 ha. were covered during 97-98 as spill over works. |
15.00 |
15677 ha. Rehabilitation of Degraded forest land.
- Maintenance of assets created during 8th Plan. |
During the VIII Plan, a Central Sponsored Scheme, "Modern Forest Fire Control Methods in India" was continued. The project was implemented in 11 States during VIII Plan. Its achievement
during the VIII Plan and goals set for IX Plan are as under:-
(Rs. in crores)
|
Programme |
VIII Plan Outlay |
Expdt. |
Physical Targets |
Physical Achievements |
Ninth Plan Outlay |
Goals set for IXth Plan |
|
Modern Forest Fire Control Methods in India |
7.37 |
7.37 |
To assist 11 States to develop necessary infrastructure to control forest fire |
11 States were assisted |
40.00 |
To assist all the States to develop necessary infrastructure to control forest fire. |
|
National Forestry Action Programme |
-- |
-- |
-- |
-- |
0.50 |
* |
* Goals set for IXth Plan
Achievements for IXth Plan
16. WILDLIFE
Ministry of Environment & Forests oversees implementation of Wildlife (Protection) Act, provides assistance to State Governments for development and protection of National Parks and Wildlife Sanctuaries and deals with matters relating to Wildlife Institute of India (WII), Dehradun and Convention on International Trade in Endangered Species (CITES).
17. WILDLIFE INSTITUTE OF INDIA (WII)
WII was established in 1982 under the erstwhile Ministry of Agriculture and Co-operation and subsequently brought under the Ministry of Environment and Forests. The main mandate of the Institute is to impart training to government and non-government personnel to carry out research and advise on matters of conservation and management of wildlife resources. In April, 1986, autonomous status was granted to this Institute for developing its professional role in bio-diversity conservation for South and South East Asian Region.
The Institute conducts three principal courses viz., the 3 months’ certificate, the 9th months’ diploma and 2 years M.Sc. in Wildlife Biology on a regular basis.
During 8th Plan about 370 students/Forest Officers/others were trained by WII in different
courses conducted by it. Its achievements during 8th Plan and goals set for 9th Plan are given below:
(Rs.in Crores)
|
Programme |
8th Plan Outlay |
Expdt. |
Physical targets (no. of persons) |
Achievements (no. of persons) |
9th Plan Outlay |
Goals set for 9th Plan. (No. of persons) |
|
WII |
17.57 |
16.21 |
|
|
18.00 |
|
|
a) M.Sc. courses in Wildlife Sciences |
|
|
50 |
26 |
|
65 |
|
b) P.G. Dip. Course in Wildlife Management. |
|
|
150 |
86 |
|
110 |
|
c) Certificate Course in Wildlife Management. |
|
|
150 |
83 |
|
110 |
|
d) Field Workshop/ Short Courses |
|
|
300 |
175 |
|
1500 |
The Scheme was started from 1986 with activities like Strengthening of Wildlife Division and Regional Offices in Delhi, Mumbai, Calcutta and Chennai with adequate manpower and development of infrastructure for better enforcement of Wildlife (Protection) Act, CITES, etc. Three sub-regional offices at Guwahati, Amritsar (shifted from Pathankot) and Cochin were started. The achievement of
the Scheme during the VIII Plan and Goals set for the IX Plan are as under:
(Rs. in Crores)
|
Scheme |
8th Plan Outlay |
Expdt. |
Physical Targets/ Achievements |
9th Plan Outlay |
Goals set for 9th Plan. |
|
Strengthening of Wildlife Division |
3.50 |
2.71 |
* |
6.00 |
** |
* Physical target are not given as the scheme aims at strengthening the functions of the Central Wildlife Organisation and Regional and Sub-regional Offices. It also aims at enforcement of Wildlife (Protection) Act 1972 and the provisions of CITES. The Central as well as Regional Offices have been able to achieve the objectives to a great extent. Large number of seizures of wildlife and its derivatives have been made which would otherwise have found their route in the international market. The offices also implement the provisions of CITES with respect to trade in wildlife and its derivatives.
Dr. Salim Ali and Dr. Kailash Sankhla National Fellowship Awards have been commissioned during the year 1995. These awards are given in alternate year.
**
1. Strengthening of Central Unit Regional and Sub-regional Offices.
2. Upgradation of existing three Sub-regional Offices and creation of four new Regional Offices
at Imphal, Hyderabad, Varanasi and Ahmedabad.
3. Consultancies for Special Tasks.
Achievements of 9th Plan
Physical target are not given as the scheme aims at strengthening the functions of the Central Wildlife Organisation and Regional and Sub-regional Offices. It also aims at enforcement of Wildlife (Protection) Act. 1972 and the provisions of CITES.
19. NATIONAL PARKS AND SANCTUARIES
The objective of the Scheme is to assist the State governments and UTs in the development of their National Parks and Sanctuaries and encourage them to extend protected area network. The Scheme provides financial assistance for habitat development of Wildlife and Bio-diversity Conservation, to create infrastructure facilities for better protection and management. 100% assistance is provided under this Scheme for identified items of non-recurring expenditure in case of National Parks and Sanctuaries. 50% assistance is also provided in respect of certain identified recurring items
of expenditure in respect of National Parks only. Its achievement during the 8th Plan and goals set for the 9th Plan are as under:
(Rs.in Crores)
|
Scheme |
8th Plan Outlay |
Actual Expdt. |
Physical Targets |
Achieve-ments |
9th Plan Outlay |
Goals set for 9th Plan. |
|
Develop-ment of National Parks and Sanctuaries. |
49.50 |
49.50 |
250 National Parks and Sanctuaries to be covered and provided assistance. |
220 National Parks and Sanctuaries were provided assistance. |
70.00 |
To provide financial assistance to all National Parks and Sanctuaries in States/UTs for protection of endangered species and Conservation of Wildlife. |
The Central Zoo Authority (CZA) was constituted by the Government of India in February, 1992 with a view to enforce minimum standards for upkeep and health care of animals in zoos. This was done through an amendment of the Wildlife (Protection) Act, 1972.
The achievements of CZA during the VIII Plan and goals set for the IX Plan are as under:-
(Rs. in Crores)
|
Name of the Scheme |
Eighth Plan Outlay |
Actual Expdt. |
Physical Targets |
Physical Achievements |
Ninth Plan Outlay |
Goals set for Ninth Plan |
|
Central Zoo Authority |
12.00 |
12.00 |
* |
** |
40.00 |
*** |
*
To evaluate zoo with reference to norms and standards specified under the Recognition of Zoo Rules, 1992 and provide technical and financial support to zoos having potential to achieve the desired standards.
To recognize or de-recognize zoos under the provisions of Wildlife (Protection) Act.
**
***
To achieve the standards and norms set-forth under the Recognition of Zoo rules, 1992; to provide grants for animal housing and veterinary care; capacity building; research activities; and creation of rescue facility in the off display area of the zoos.
21. ANIMAL WELFARE BOARD OF INDIA (AWBI)
Various animal welfare organisations along with the Board take steps to generate public awareness, AWBI receives grants-in-aid from Government of India and in turn provides assistance to various organisations in the country for rescue/shelter homes, animal birth control, vehicles, medicines and veterinary care, etc. AWBI also imparts training to representatives of various Animal Welfare Organisations and public in animal care, laws and various other disciplines. Its achievements during
the VIII Plan and goals set for the IX Plan are as under:
(Rs.in Crores)
|
Name of the Scheme |
VIII Plan outlay |
Expdt. |
Physical Target/ achievements |
Ninth Plan outlay |
Goals set for Ninth Plan |
|
Animal Welfare Board of India |
6.50 |
6.40 |
* |
15.50 |
Number of trainers 150. Number of Hon. Animal Welfare Officer-12000. Number of training centres-1000.
Rescue Homes for Animals – Number of Organisations to be benefited – 300.
ABC operations – 1,00,000 Number of Centers – 30 Construction of Office Building of AWBI.
Research & Development |
*Physical Targets
a) Humane Education
b) Rescue home for animals including water troughs and water facilities.
c) Animal birth control operations
*Achievements
a) Number of trainers 97. Number of Honorary Animal Welfare Officers 9500; Number of Training Centres 600.
b) Number of organisations benefited 250.
c) Number of operations 70,000. Number of centres 20.
Scheme has been transferred to the Ministry of Social Welfare and Empowerment w.e.f. 3.9.98.
22. PROJECT TIGER (PT)
The Centrally Sponsored Plan Scheme ‘Project Tiger’ was launched on 1st April, 1973. Initially, nine tiger reserves were created. Presently, there are 27 tiger reserves in 14 States covering an
area of 37761 sq. kms. The achievements of the Scheme during the VIII Plan and goals set for the IX Plan are as under:-
(Rs. in Crores)
|
Scheme |
8th Plan Outlay |
Expdt.
|
Physical Targets |
Physical Achievements |
Ninth Plan Outlay |
Goals set for Ninth Plan.
|
|
Project Tiger |
40.00 |
38.90 |
* |
** |
75.00 |
6 New Tiger reserves are to be identified and included in the Project Tiger scheme in addition to providing central assistance to 23 tiger reserves created upto the end of the Eight Plan. Creation of Strike Force in six Tiger Reserve facing militancy and Extremists activity. |
*Physical Targets
To assist Tiger Reserves for conservation and protection of tigers habitat improvement, forest protection, construction of staff quarters, office building, wireless network, etc.
**Physical Achievements
Central assistance was given to 23 Tiger Reserves and the following targets were achieved:
23. PROJECT ELEPHANT
The Scheme was started in 1991-92. The achievement during the VIII Plan and goals set for the IX Plan are as under:-
(Rs. in Crores)
|
Scheme |
VIII Plan Outlay |
Expdt. |
Physical Targets |
Physical Achieve- ments |
Ninth Plan outlay |
Goals for the Ninth Plan. |
|
Project Elephant. |
23.00 |
19.51 |
To assist 12 States for Conservation of elephants. |
Assisted 13 States for conservation of elephants. |
35.00 |
To assist 12 States for conservation of elephants. |
24. ECO-DEVELOPMENT SCHEME IN AND AROUND PROTECTED AREAS:
The objectives of the Scheme is to provide alternative sources of sustenance to the communities on the fringes of National Parks and Sanctuaries and to improve the ecological productivity of the buffer zones of Protected Areas through the introduction of sustainable economic activities and also to provide assistance for preparation of plans for Eco-development, soil conservation, alternative energy sources, efficient utilisation of biomass, etc. Its achievement during the 8th Plan and goals for the 9th Plan are as under:
(Rs in Crores)
|
Scheme |
8th Plan Outlay |
Expdt. |
Physical Targets |
Achievements. |
9th Plan Outlay |
Goals set for 9th Plan. |
|
Eco-develop Ment Around Protected Areas
India: Eco-develop Ment Project. |
22.98
6.16 |
22.20
2.36 |
80 national Parks and Sanctuaries and 23 Project Tiger areas to be covered.
The Project Preparation Facility funds of US $2 million was provided as loan by IDA to take up demonstration activities viz. Improved management, village eco-development, environment education awareness campaign, etc. in 7 protected areas where the main scheme would be implemented during the 9th Plan. |
70 National Parks and Sanctuaries and 23 Project Tiger areas covered under the scheme. They were provided assistance for biomass generation and non-conventional energy resources.
Infrastructure development facilities were taken up in the Central Coordination Unit in the PT Division in the Ministry. Concerned State Governments were provided assistance for taking up development activities in the 7 protected areas. |
175.00 (including India Eco Develop-ment Project)
|
80 National Parks & Sanctuaries and 24 Project Tiger areas will be covered (excluding 5 Tiger Reserves being assisted under the Externally Aided Scheme) for biomass generation and non-conventional energy resources.
The Project Agreement was signed on 30/9/96 and became effective from 27/12/96. The Project will be implemented by the concerned States to achieve improved protected area management, village eco-development, environmental education awareness campaigns, etc. in the 7 identified areas viz. Gir, Nagarhole, Ranthambore, Periyar, Buxa, Palamau and Pench. |
25. BENEFICIARY ORIENTED SCHEME FOR TRIBAL DEVELOPMENT:
The Scheme was launched during 1989-90 with an objective of rehabilitation of tribal families affected under the relocation plan of national parks and sanctuaries including project tiger reserves. The achievement during the VIII Plan and goals set for the IX Plan are as under:-
(Rs in Crores)
|
Scheme |
VIII Plan Outlay |
Expdt.
|
Physical Targets |
Physical achievements |
IX Plan outlay |
Goals set for Ninth Plan. |
|
Beneficiary Oriented Scheme for Tribal Develop-ment. |
3.50 |
2.40 |
Relocation of tribal families outside the protected areas. |
Out of 423 tribal families proposed for relocation outside the protected areas, relocation of 226 families completed. |
19.00 |
1000 tribal families are proposed to be relocated outside protected areas. |
26. NATIONAL ZOOLOGICAL PARK, NEW DELHI
The Scheme is being continued since 1955-56 with the objective of conserving and breeding rare and endangered animals, to conduct research regarding behaviour, reproduction and nutrition, to educate and entertain people about preservation of wildlife. It also provides assistance and guidance to other zoos in the country.
(Rs. in Crores)
|
Name of the Scheme |
8th Plan Outlay |
Actual Expdt. |
Physical Target |
Physical Achievements |
9th Plan Outlay |
Goals set for 9th Plan |
|
NATIONAL ZOOLOGICAL PARK |
1.95 |
1.30 |
* |
** |
5.00 |
*** |
*
Improvement of Kangaroo, Water ducks, Sangai, Cheetah, Leopard, Jaguar encl. and incinerator. Rewiring and repair of staff quarters, recycling plan, construction of stand of barriers, quarantine works and hoarding desilting and cleaning of moats etc.
**
All the above mentioned works have been completed.
***
27. NATIONAL AFFORESTATION & ECO-DEVELOPMENT BOARD
The National Afforestation & Eco-Development Board (NAEB) was set up in August 1992. Its main functions are:
development
(Rs in Crores)
|
Scheme/Activity |
8th Plan Outlay |
Financial Achieve- Ments for 8th Plan |
Physical Targets for 8th Plan |
Physical Achievements for 8th Plan
|
IXth Plan outlay |
Goals set for IXth Plan |
|
Integrated Afforestation and Eco- Development Projects scheme
Fuelwood/Fodder Projects Scheme
Non-Timber Forests Produce (including Medicinal Plants) Scheme
Seed Development Scheme
Grants-in-Aid Scheme (for Voluntary Agencies)
Aerial Seeding Scheme
20 Point Programme
a) Seedling Distribution
b) Area coverage Others |
200.00
158.00
55.00
9.00
9.50
6.00
|
203.12
154.19
56.47
7.81
7.51
2.49
|
3,79,558 ha.
4,20,084 ha.
1,00,000 ha.
-
-
This scheme is in abeyance since 1994-95
625.85 crores
5522200 ha. |
2,98,981 ha.
4,04,218 ha.
1,08,000 ha.
25 States assisted
338 Projects sanctioned
557.90 crores
5067031 ha. |
247.00
135.00
80.50
6.00
8.00 |
1,77,000 ha.
3,67,000 ha.
74,000 ha.
All States to be assisted
NGO projects to be sanctioned |
Botanical Survey of India is a Subordinate Office of this Ministry with Headquarters at Calcutta and Circles and Field Offices at 9 centres in the country. The primary objectives of BSI are to explore plant resources of the country, to inventories and monitor phytodiverrsity, to document phytodiversity in the form of Flora of India, State Floras, District Floras and Floras of Fragile Eco-systems, protected areas etc., to identified species, populations and Eco-systems which are under threat and need conservation including endemic, to undertake Ex-situ conservation of critically threatened taxa in the Botanical gardens through conventional and bio-technological methods and to explore the bio-perspectives of the plant wealth of the country for sustainable utilisation through ethnobotanical
studies etc. The achievements of BSI during the 8th Plan and goals set for the 9th Plan are as follows:
(Rs. in Crores)
|
Schemes |
VIII Plan Outlay |
Expdt. |
Physical Targets |
Physical Achievements |
Ninth Plan Outlay |
Goals set for Ninth Plan |
|
Botanical Survey of India: Survey of Natural Resources (no. of tours) |
12.41
|
11.84
|
207 |
135 |
32.00 |
Exploration tours – 650 |
|
b) Endangered Species(no. of Red Data Sheets to be compiled) |
|
|
790 |
610 |
|
Coverage of species under threat in publication Red Data Book (ca. 750) |
|
c) Scientific evaluation of selected useful plants (nos.) |
|
|
15 |
10 |
|
|
|
d) National database of type specimen. |
|
|
2770 |
2770 |
|
Preservation of specimens (ca.60,000) |
|
e) Listing of Live Specimen Collection |
|
|
15,200 |
15045 |
|
Collection of specimens (80,000) |
|
f) Publication. |
|
|
31 |
31 |
|
Publication (ca.250)
|
Zoological Survey of India was established primarily to explore and inventories the faunal diversity of the country and to collect and document baseline data in respect of taxonomy, geographical distribution, bio-ecology of various animal groups. The primary objectives are 1. Exploration and survey of Fauna resources, 2. Taxonomic studies, 3. Statues survey of Endangered species, 4. Status survey of conservation areas, 5. Publication of results through departmental books and journals 6. Publication of Fauna of India series, 7. Maintenance and development of National zoological
collections. The achievements of ZSI during the 8th Plan and the goals set for the 9th Plans are as follows:
(Rs. in Crores)
|
Scheme |
VIII Plan Outlay |
Expdt |
Physical Targets |
Physical Achievements |
Ninth Plan Outlay |
|
Zoological Survey of India: Survey of States Fauna. |
11.83
|
12.30
|
Survey of 8 states. |
99 Surveys in 8 states to explore Faunal resources, 60 districts were covered. Faunal resources of Orissa, West Bengal & Delhi completed. |
32.00 |
|
Ecosystem Studies Himalayan Ecosystem Desert Ecosystem Tropical Rain Forests Ecosystem Freshwater Ecosystem Marine Ecosystem |
|
|
States of Himachal Pradesh, Sikkim, Arunachal Pradesh, J&K, Gujarat, Ratasthan, Tripura, Manipur, Nagaland, Mizoram Kerala and Andamans. |
187 Surveys in different states completed. Faunal diversity of Sikkim documented. Inventorisation of Faunal component & Publication of Data taken. |
|
|
Survey of Conservation area s including Tiger Reserves |
|
|
Important conservation areas of the country |
69 Surveys in different conservation areas of Prambiculam, Melghat, Gulf of Mannar, Tadoba, deserts, Valmiki Tiger Reserves. |
|
|
Taxonomic studies |
|
|
Taxonomic studies of conservation areas and Ecosystems |
Fauna of West Bengal, Meghalaya, Nilgiri, Nanda Devi, Manas Tiger Reserves, Ujini Wetlands completed |
|
|
Status of Endangered Species |
|
|
Status surveys of selected species |
Status survey of Capped Langur, Hoolock Gibben, Desert Cat, Chinkara, Hispid Hara, Golden Langur, Nilgiri Langur, Leaf Monkey, Rhesus Monkey, Hanuman Langur completed. |
|
|
Red Data Book on Vertebrates |
|
|
Preparation of publications |
Completed |
|
|
Fauna of India |
2 volumes published, 3 sent for publication and 2 volumes made press ready |
*
|
|||
|
Computerization |
Type & Other Regd. Collections |
ENVIS Centre Estd. 40 sps. Of Schedule-1 animals completed. |
|||
|
Documentation & Publication |
Records of ZSI 1991-95 Annual Reports-85-94 Bibliography 27-30 State Fauna of W.B. Hoogly-Matla Estuary Rushikulya Estuary Chilka Wetland Rajaji National Park Status Survey of 3 species. |
||||
|
Training & Extension |
7 Training Programmes on Taxidermy, Collection & Preservation, Wildlife Conservation, Snail, Flukes & Man conducted. |
||||
|
EIA Programmes |
33 EIA Studies Undertaken. |
Goals for 9th Plan
Survey of States Fauna.
8 states
Studies on Selected Eco-systems
7 Eco-systems
Survey of Conservation Areas
20% of the Total Conservation Areas
Taxonomic studies of Fauna
6 States and 5 Eco-systems.
Status of Endangered Species
20 species
Preparation of Red Data Book and Fauna of India Project
Invertebrate part 1 & 8 Volumes of India
Computerization of Faunal Diversity including National Zoological Collection
Type data of General collections
Documentation & Publication
State Fauna Series, Ecosystems, Faunal Diversity document, Annual Reports, Bibliography, Handbooks & Monographs.
Training & Extension Services
7 Training Courses.
Achievements of 9th Plan
Survey of States Fauna.
112 in 8 States covering 48 districts so far.
Studies on Selected Eco-systems
5 ecosystem already taken up Under Action Plan
Survey of Conservation Areas
Survey & inventorisation of Fauna of 5 Conservation Areas taken up under Action Plan
Taxonomic studies of Fauna
Fauna of Sikkim, Manipur, Nagaland, Mizoram completed. Fauna of 3 Wetland and 1 Biosphere & 1 Desert under publication.
Status of Endangered Species
2 species completed, 2 more taken up under Action Plan.
Preparation of Red Data Book and Fauna of India Project
Red Data Book on Vertebrate Completed, Invertebrate, Part-1 under Process. 2 volumes of Fauna of India, Manuscript under Printing stage.
Computerization of Faunal Diversity including National Zoological Collection
Computerization of Type Collection is under progress.
Documentation & Publication
Records ZSI –97 published. Annual Reports – 94-95 made Press Ready. Bibliography Vol.30 Published. State Fauna of Meghalaya, West Bengal (Remaining Parts) published. Occasional Papers Nos.170-177 published.
Training & Extension Services
6 Training courses completed in different disciplines of Zoology.
(Rs. in Crores)
|
Name of the Scheme |
8th Plan Outlay |
Actual Expdt. |
Ixth Plan Outlay |
Physical Target/Achievements |
Goals set for IXth Plan |
|
Environment Education & training
Seminars/Symposia/Workshops
|
17.65
1.40
|
15.09
0.89
|
32.00
1.50
|
No quantitative targets were set for the schemes as such. However, the targets set for various programmes under the scheme have been successfully achieved. |
It is not possible to set any quantitative targets for these schemes. However, the existing programmes will be continued. Though no quantitative targets are set for the scheme, the targets set for various programmes under these schemes are achieved. |
31. ENVIRONMENTAL INFORMATION SYSTEM (ENVIS)
(Rs. in Crores)
|
Scheme/Activity |
8th Plan Outlay
|
Actual Expdt.
|
IX Plan Outlay
|
|
ENVIS |
5.50 |
5.81 |
18.00
|
Targets:
Achievements:
Goals set for IXth Plan
In addition to the existing centres, a few centres under the priority areas, not covered so far, would be set up during the ninth plan period. All ENVIS Centres would be strengthened for developing the Homepage in their assigned areas for accessing information by the users concerned. In order to promote an online information, all ENVIS centres will be networked with the Focal Point in the Ministry and vice versa. It is also envisaged that all the ENVIS Centres will develop their web sites, in their respective subject areas, so that all users concerned could access the information directly from the Centres through internet.
Achievements
Homepage for 17 centres have been developed. The remaining Centres are in the process of developing their home-page and web-site so that this could be browsed through internet by the user-concerned directly for getting their information feed-back.
32. CENTRES OF EXCELLENCE
(Rs. in Crores)
|
Name of the Scheme |
8th Plan Outlay
|
Expdt.
|
Ixth Plan Outlay |
Goals set for Ixth Plan |
|
CENTRES OF EXCELLENCE
|
23.00 |
20.08 |
22.20 |
To strengthen awareness, research & training in the priority areas of environmental science through existing seven centres of excellence and to augment infrastructural and other facilities in these Centres. |
33. NATIONAL NATURAL RESOURCES OF MANAGEMENT SYSTEMS (NNRMS)
(Rs. in Crores)
|
Scheme/Activity |
8th Plan Outlay Plan |
Expdt. Plan |
IX Plan Outlay Plan |
|
NNRMS |
4.10 |
3.81 |
4.00 |
Targets:
Projects belonging 15 areas identified by the Bio-resource Committee were to the considered..
Achievements:
Out of 56 thrust areas, 20 areas have since been covered and 30 projects sanctioned.
Goals set for IXth Plan
The thrust areas identified by the Bio-resource Committee will be covered in a phased manner and corresponding research projects will be supported for application of remote sensing technologies in the field of environmental sciences for optimal utilisation of the natural resources.
Achievements
Out of 56 areas, about 30 thrust areas have been identified and 14 new research projects, in addition to the on-going projects, have been supported under this Scheme.
34. PARYAVARAN VAHINI
(Rs. in Crores)
|
Scheme/Activity |
8th Plan Outlay
|
Expdt.
|
IX Plan Outlay
|
|
Paryavaran Vahini |
4.50 |
1.67 |
0.50 |
Target:
One Paryavaran Vahini has been constituted in each district which was selected on the basis of high incidence of pollution, density of tribal population and forest cover. 140 districts were identified for the setting up of Paryavaran Vahini.
Achievements:
Only 135 districts finally selected where Paryavaran Vahinis were set up. Token grant of Rs.200/- p.m. was given to the each member of Vahini. As per the decision of the Ministry, the scheme is likely to be transferred to the various States without any financial commitment of the Ministry. The Planning Commission has already been communicated in this regard.
Goals set for Ixth Plan
As per the decision of the Ministry, the scheme is likely to be transferred to the various States without any financial commitment of the Ministry. The Planning Commission has already been communicated in this regard. Decision of the Planning Commission is yet to be received by the Ministry.
35. GRANTS-IN-AID TO PROFESSIONAL SOCIETIES
(Rs. in Crores)
|
Scheme/Activity |
8th Plan Outlay |
Expdt. |
IX Plan Outlay |
|
Grants-in-aid to Professional Societies |
0.50 |
0.23 |
0.50 |
Targets
:
Though no numerical figure was targeted, efforts were made to provide financial support to the Professional Societies and other appropriate institutions for developing activities and projects in the
field of environment as well as to develop exhibition galleries and educational programmes relevant to the ecology.
Achievements:
During the plan period about eight institutions were supported and no other worth supporting proposals were received in the Ministry.
Goals set for IXth Plan
Though numerical number for supporting the professional societies are not earmarked but efforts will be made to support various professional societies and other educational institutions to develop their activities and projects in the field of environment as well as to develop exhibition galleries and educational programmes relevant to ecology, wildlife and environment.
Achievements
Proposals from various organisations have been received and are being considered by a Committee for providing assistance under this Scheme. The guidelines and the proforma for submission of the projects have been finalised and circulated to all concerned for submitting the project proposals.
36. ENVIRONMENT IMPACT ASSESSMENT
(Rs. in Crores)
|
Name of the Scheme |
8th Plan Outlay |
Actual Expdt. |
Physical Targets |
Achievements |
Ixth Plan Outlay |
Goals set for IXth Plan |
|
Environmental Impact Assessment
(Including Clean Technologies )
|
15.00
|
14.25 |
The objective of Impact Assessment division is to assess the Impact of any development Project from Environment angle which is referred to this Ministry. Therefore there is no physical target/achievement. |
27.00 |
The objective of Impact Assessment division is to assess the Impact of any development Project from Environment angle which is referred to this Ministry. EIA is a continuous process & procedures have been evolved for appraisal. |
|
AND MAPPING
(Rs. in Crores)
|
Scheme/ Activity |
8th Plan Outlay |
Actual Expdt. |
Targets/ Achievements |
IX Plan Outlay |
Goals set for Ninth Plan |
|
Environmental Audit
Environment Statistics and Mapping
Adoption of Clean Technologies in Small Scale Industries |
0.50
0.50
0.50 |
0.50
0.50
0.50 |
*
|
0.60
0.60
0.60
|
** |
* 8th Plan Physical Targets/Achievements
Environmental Audit
Physical Targets:
Promotion, sector-wise training programmes sector-specific manuals.
Achievements:
Modular Environmental audit manuals prepared; 20 sector-wise training programmes conducted. Sector-manuals in r/o Sugar, Lube oil Re-refining industry have been prepared.
Environmental Statistics and Mapping
Physical Targets:
Visakhapatnam.
Achievements:
Visakhapatnam prepared.
Adoption of Clean Technologies in Small Industries
Physical Targets:
Training and awareness programme, preparation of sector specific manuals, Waste Minimisation demonstration studies.
Achievements:
About 40 training and awareness programme conducted, sector specific manuals on pulp & paper pesticide formulations & textiles prepared. Demonstration studies in Electro-plating conducted.
**Goals set for IXth Plan
Environmental Audit.
Promotion of concept of environmental audit and for reducing pollution load in industry.
Achievements: Sectorwise training programmes and preparation of sector-specific manuals in selected sectors, Sectoral analysis of information given in ES.
Environmental Statistics and Mapping.
Preparation of environmental maps depicting polluting data relating to air, water, soil and noise for the metro cities and polluted areas.
Achievements: Environment atlas for metrocities in India has been prepared.
Adoption of Clean Technologies in Small Scale Industries.
Training and awareness programmes, sector specific manuals, Waste Minimisation studies.
Achievements: About 60 training programmes conducted. Sector specific manuals and WM demonstration studies in textile processing units, edible oil industry, dye and dye intermediate industry, bulk drug industry were undertaken.
38.
ASSISTANCE FOR ABATEMENT OF POLLUTION(Rs. in Crores)
|
Scheme/Activity |
8th Plan Outlay |
Actual Expdt. |
Physical Targets |
Physical Achievements |
IXth Plan Outlay |
Goals set for IXth Plan |
|
Assistance for Abatement of Pollution |
7.00 |
8.22 |
-- |
-- |
10.00 |
Financial assistance for supporting equipment, studies, projects etc. to various SPCBs/UT PCCs etc. to meet the objectives of the Policy Statement for Abatement of Pollution. |
39. NATIONAL MUSEUM OF NATURAL HISTORY (NMNH)
(Rs. in Crores)
|
Programme |
VIII Plan Outlay |
Expdt. |
Physical Targets/Achievements |
Ninth Plan Outlay |
Goals set for Ninth Plan. |
|
NMNH |
10.00 |
7.19 |
* |
18.00 |
**
|
* Inauguration of the Regional Museum at Mysore. Completion of the 1st phase of the building of the RMNH, Bhopal. Collection of specimens for RMNH at Mysore and Bhopal. Construction of first phase of building at Bhubaneswar.
** Acquisition of land and construction of building of NMNH.
Renovation and updating of existing NMNH Galleries.
Completion of 2nd phase of galleries of RMNH, Mysore, Bhopal and 1st Phase at Bhubaneshwar.
40. CIVIL CONSTRUCTION UNIT
(Rs. in Crores)
|
Item |
VIIIth Plan Outlay |
Expdt. |
Physical Target (No. of works) |
Achieve-ments (No. of works) |
IXth Plan Outlay |
Goals set for IXth Plan (No. of works) |
Achievements |
|
Forestry & Wild Life |
4.95 |
5.45 |
19 |
14 |
16.20 |
71 |
35 |
|
Environment |
18.50 |
16.36 |
44 |
32 |
28.00 |
98 |
82 |
|
Environment Education Training and Extension |
2.00 |
4.82 |
4 |
2 |
9.00 |
27 |
5 |
|
Civil Works |
3.00 |
3.75 |
- |
- |
7.00 |
- |
- |
|
Grand Total |
28.45 |
30.38 |
67 |
48 |
60.20 |
196 |
122 |
41. NATIONAL RIVER CONSERVATION DIRECTORATE
(Rs. in Crores)
|
Scheme/Activity |
8th Plan Outlay |
Expdt. |
Target Achievements |
IX Plan Outlay |
Goals set for Ninth Plan/Achievements* |
|
National River Conservation Directorate.
1) Ganga Action Plan I
2) Ganga Action Plan II
3) NRCP
4) NLCP
5) Ganga Trust Fund |
193.01
149.00
41.00
--
-- |
152.15
131.75
30.54
--
-- |
76 Schemes 65 schemes
176 Schemes 8 schemes
110 schemes --
-- --
-- -- |
14.50
650.84
76.00
25.00
0.50 |
The goal of the NRCP is to reduce pollution in the major rivers by executing pollution abatement measures such as interception & diversion and treatment of domestic sewage, undertaking river front works etc. The projected target of Rs.25 crores for NLCP is likely to be achieved. Achievements: The following no. of schemes have been completed under the IX Plan so far: GAP-I 5 GAP-II 87 NRCP 57
|
OBJECTIVES
The main objective of the river action plans is to improve the water quality of the rivers to the desired class/standards by preventing pollution load reaching the river by undertaking works like (i) interception & diversion works to capture the raw sewage flowing into the river through open drains and divert them for treatment, (ii) sewage treatment plant for treating the diverted sewage, (iii) low cost sanitation works to prevent open defecation on river banks, (iv) electric and improved wood based crematoria to conserve the use of wood and help in ensuring proper cremation of bodies brought to the burning ghat, (v) river front development works such as improvement of bathing ghats etc. and (vi) other minor misc. works.
Reasons for Short fall of 8th Plan
The major reasons for delay in completion of schemes are:
ACHIEVEMENTS IN THE 8TH PLAN
Out of 261 schemes sanctioned, 250 schemes had been completed by the end of the 8th plan. A sewage treatment capacity of 683 mld was created under the programme . Out of the project outlay of Rs. 462.04 crores, an amount of about Rs. 447 crores was spent on the programme.
The total project cost of GAP Phase-II is Rs. 1276.26 crores which includes the following components.
National River Conservation Plan
Under this action plan, out of the total project outlay of Rs.1198.57 crores, an expenditure of the Rs.30.54 crores had been incurred. 110 no. of Detailed Project Reports were sanctioned under this action plan.
Goals set for the 9th Plan
The Yamuna Action Plan which is an important component of the Ganga Action Plan to be completed by 2002 A.D.. The other components of the Ganga Action Plan are also to be pursued for completion in the Ninth Plan.
2. Considerable progress towards ensuring the early completion of the NRCP to be achieved.
42. WETLAND CONSERVATION PROGRAMME
(Rs. in crores)
|
Name of Activity |
8th Plan outlay |
Expdt. |
Physical Targets |
Achieve-ments |
9th Plan outlay |
Physical Targets |
Achieve-ments |
|
WETLAND CONSERVATION PROGRAMME |
6.80 |
6.60 |
* |
** |
16.00 |
*** |
**** |
*8 Plan Physical Targets:
** Achievements During 8th Plan:
*** Targets for 9th Plan:
**** Achievements so far during 9th Plan:
43. CENTRAL POLLUTION CONTROL BOARD
(Rs. in Crores)
|
Scheme/Activity |
8th Plan Outlay |
Expdt. |
Physical Targets
|
Physical Achievements |
IXth Plan Outlay
|
Goals set for Ninth Plan |
|
Central Pollution Control Board |
16.00 |
20.83 |
* |
** |
32.00 |
***
|
* Physical Targets
To undertake survey and monitoring for assessment of water and air quality, undertake analysis of pollutants, organise training programmes, develop standards and guidelines, compliance of industries to the prescribed standards, inventorisation of hazardous waste generating industries and organise mass awareness programmes.
**Achievements
Regular surveys carried out for assessment of pollution from stationary and mobile sources and air and water quality monitoring programmes were taken up with SPCB/PCC. Samples analyzed for air, water and soil analytical quality control tests were organised for the laboratories of SPCBs. Standards have been developed in respect of important category of industries and also developed guidelines for the assistance to the industries. Training programmes were organised for SPCB/PCC and for industries personnel. The training programmes were taken up under the World Bank Programme. Regular follow-ups were taken in respect of 17 categories of highly polluting industries and follow up actions maintained with the State Boards in respect of implementation of action points for restoration of environmental quality in critically polluted areas. CPCB participated in various exhibitions organised by different agencies. Technical Reports were brought out, disseminating information on various aspects relating to prevention and control of pollution. Inventorisation of hazardous waste generating industries taken up in different States.
***Goals sets for Ninth Plan
Environmental monitoring, assessment of pollution environmental standards and action plans, Enforcement of pollution abatement programmes, Promotion of infrastructure and capacity upgradation programmes.
Achievements
The goals set for IXth Plan are being achieved in a phased manner, which includes;
Continuation of on-going programme of water and air quality monitoring. Pollution control in highly polluting industries and industries discharging wastewater into rivers. Implementation of action points in respect of problem areas. Review of standards and development of standards and guidelines in respect of industries and other sources. Continuation of on going programmes on hazardous waste inventorisation.
44. ASSISTANCE TO BOTANIC GARDENS
This scheme is aimed at conservation and propagation of plant and genetic resources. Its
achievements during the Eighth Plan and goals for the Ninth Plan are as under:
(Rs. in Crores)
|
Programme |
VIII Plan Outlay |
Expenditure |
Physical Targets |
Physical Achievements |
Ninth Plan Outlay |
Goals set for Ninth Plan |
|
Assistance for Regional Botanical Gardens |
1.50 |
3.18 |
One time financial assistance to existing botanical gardens for improving their infrastructural facilities to facilitate ex-situ conservation of rare and endangered plants species. |
40 Botanical Gardens were provided financial support. |
18.00 * |
To provide financial assistance to about 50 botanical gardens for improvements of infrastructural facilities. |
*Includes provision for National Botanic Garden, Noida.
Achievements of 9th Plan
75 Botanical Gardens were provided financial support.
(Rs. in Crores)
|
Scheme/Activity |
8th Plan Outlay |
Expdt. |
Physical Target |
Physical Achievements |
Ixth Plan Outlay* |
|
RESEARCH AND DEVELOPMENT
|
18.00 |
15.85 |
Initiation of new projects: 200 Servicing of ongoing projects:808 (cumulative) Review & monitoring of ongoing projects: 740 (cumulative) Dissemination of research results: publication of executive summaries |
This is a continuing scheme. The objectives are promotion of research in multidisciplinary aspects of environment protection, conservation and development with capacity building. During the period 197 projects were initiated. A total of 740 projects were reviewed. Servicing of ongoing projects – 808 (cumulative). A Compendium of executive summaries was published. |
17.00 |
*Goals set for Ixth Plan: The scheme will be continued.
Achievements: During the period 1997 to 2000 (31.10.2000) 105 new projects were initiated. 110 projects were completed and 105 projects remained operational. A total of 325 (cumulative) projects were reviewed and evaluated.
46. G.B. PANT INSTITUTE OF HIMALAYAN ENVIRONMENT & DEVELOPMENT
(Rs. in Crores)
|
Programme |
VIII Plan Outlay |
Expdt. |
Physical Targets |
Physical Achievements |
Ninth Plan Outlay |
|
G.B. Pant Institute of Himalayan Environment & Development
|
22.23
|
21.32
|
1. Initiation of strong R&D programmes in identified areas. 2. Construction of building complex at Katarmal (HQs) and initiation of construction at Kullu (HP)and Panthang (Sikkim). |
Were fully operational. Completed except for some spillover in the 9th Plan Period. 50% works at Kullu completed, work at Panthang initiated. |
36.00
|
Goals set for IXth Plan
Remarks
Institute. Seventh Core Programme already initiated.
2. Targets will be achieved within the plan period.
47. INTEGRATED ACTION ORIENTED R&D AND EXTENSION PROJECTS IN
HIMALAYAN REGION.
(Rs. in Crores)
|
Programme |
VIII Plan Outlay |
Expdt. |
Physical Targets |
Achievements |
Ninth Plan Outlay |
Goals set for 9th Plan |
|
Integrated Action Oriented Research Programme for the Himalayan Region |
1.76
|
1.79 |
To support location specific activities throughout the Indian Himalayan Region. |
56 Projects were sanctioned and 32 projects were completed |
1.50 |
Continuation of support to ongoing projects and initiation of new location specific projects throughout Indian Himalayan Region. |
Remarks
All on-going projects would be completed during the plan period and several new projects would be initiated. Dissemination of findings would be augmented.
( Rs in crore)
|
Programme |
VIII Plan Outlay |
Expenditure |
Targets/ Achievement |
IXth Plan Outlay |
Goals set for IXth Plan |
Achievement so far |
|
Hazardous Substance Management |
12.40 |
9.16 |
* |
22.00 |
** |
*** |
*Target/Achievements:
Sites.
**Goals set for IXth Plan
***Achievements so far
Fly Ash utilisation and Lead Acid Battery (M&H) Rules.
(Rs. in Crores)
|
Activity |
8th plan outlay |
Expdt. |
Physical targets |
Achievements
|
IX Plan outlay |
|
Bio-diversity Conservation |
1.50 |
0.95 |
Initiating preparation of Status Report, National Action Plan and legislation on bio-diversity |
Discussion held on preparation of Status Report, National Plan and Legislation on Bio-diversity |
5.00 |
Goals set for IX Plan
- To facilitate implementation of National Action Plan on Bio-diversity.
- Formulation of legislation on bio-diversity.
- Implementation of decisions of Conference of the Parties (CoP) to the CBD.
- Participation in negotiations for Cartagena Protocol on Biosafety.
- Signing and ratification of the Biosafety Protocol.
Achievements of IXth Plan
50. CONSERVATION AND MANAGEMENT OF MANGROVES AND CORAL REEFS
The Scheme on Conservation and Management of Mangroves and Coral Reefs was initiated in 1986 with the objectives of conservation and protection of the Mangrove Eco-system from further degradation; afforestation of degraded Mangroves areas; Maintenance of genetic diversity especially of the threatened and endemic species and creation of awareness among the people on importance of Mangrove Ecosystem and the need for conservation. The achievement of the scheme during the 8th Plan and goals set for 9th Plan are given below:
(Rs. in Crores)
|
Programme |
VIII Plan Outlay |
Expdt. |
Physical Targets |
Physical Achievements |
Ninth Plan Outlay |
Goals set for Ninth Plan |
|
Conservation & Management of Mangroves and Coral Reefs |
4.50 |
3.60 |
15 MAPs on Mangroves & 4 MAPs on Coral Reefs |
12 MAPs on Mangroves & 4 MAPs on Coral Reefs. |
13.20 |
30 Management Action Plans for Conservation of Mangroves & 4 MAPs on Coral Reefs |
|
Research Projects on Mangroves and Coral Reefs |
- |
- |
- |
- |
1.80 |
20 Research Projects and funding of ongoing projects |
IXth Plan Achievements
Physical
24 MAPs on Mangroves and 4 MAPs on Coral Reefs and 12 Research Projects on Mangroves & Coral Reefs to be undertaken.
Financial
MAPs – Rs.8.47 crores
Research Projects on Management and Coral Reefs-Rs 0.55 crores
51. BIOSPHERE RESERVE
(Rs. in Crores)
|
Programme |
VIII Plan Outlay |
Expdt. |
Physical Targets |
Physical Achievements |
Ninth Plan Outlay |
Goals set for Ninth Plan |
|
Biosphere Reserves |
12.00 |
11.69 |
Funding to state Govts. for identified items of activities in 8 Biosphere Reserve and initiation of new research projects in those reserves. |
Proposals submitted by the State Governments were funded for approved items of activities in 8 Biosphere Reserves. 32 research projects were also funded. |
15.00 |
To designate 4 new sites as Biosphere Reserves and to assist State Governments for existing Biosphere Reserves and financial assistance for R&D in these reserves. |
IXth Plans Achievements:
Physical: 4 new Biosphere Reserves were set up. Management activities in 12 existing BRs were
supported. 47 new research projects were sponsored.
Financial: Rs.12.76 crores
52. INTERNATIONAL COOPERATION
(Rs. in Crores)
|
Name of the Activity |
8th Plan Outlay |
Expdt. |
IX Plan Outlay |
Goals set for Ninth Plan |
|
International Co-operation |
49.18 |
122.89 (Excess is due to implementation of Externally Aided Project, India Canada Environment Facilities (ICEF) |
131.00 * |
Existing activities and contributions to International Organisations will continue. Implementation of externally aided projects funded by India Canada Environment Facility, UNDP-CCF Programme. |
* Including Rs.100 crores for India Environment Capacity Building project(EAP).
Target/Achievements
In IC Division the expenditure is, mainly on Foreign Travel, Contributions to UN and other International organisations and on the Externally Aided Projects, i.e., ICEF, projects under the UNDP/CCF and the World Bank assisted Delhi Urban Environment Management & Infrastructure Improvement Project.
53. ENVIRONMENTAL POLICY AND LAW
(Rs. in Crores)
|
Scheme/Activity |
8th Plan Outlay |
Expdt. |
IX Plan Outlay |
Physical Targets/ Achieve-ments |
Goals set for Ixth Plan |
|
1. Environment Policy & Law Scheme Activities:
|
0.25
|
0.15 |
3.00 (including Environment Commission and Tribunals |
* |
Existing activities will continue.
Publicity programmes. Publication of notification and development of criteria.
Preparation of a Comprehensive National Environment Policy.
Holding seminars and preparation of Position Paper.
|
|
|
- |
- |
- |
- |
Setting up of benches of the NETA. |
* Physical Target:
Physical Achievements:
National Environment Tribunal Act.
National Environment Appellate Authority Act.
10 notification published.
19 notification published.
(EXTERNALLY AIDED SCHEMES)
WORLD BANK AIDED INDUSTRIAL POLLUTION PREVENTION PROJECT
(Rs. in Crores)
|
Name of the Scheme |
VIII Plan Outlay |
Actual Expdt. |
VIIIth Plan Targets/Achievements |
IX Plan Outlay |
Goals set for IX Plan |
World Bank aided Industrial Pollution Control Project.
Control Project (Phase-I).
Prevention Project (Phase-II).
|
90.00 |
64.4 |
* |
96.00 |
The Phase-I has ended on 31.3.1999.
personnel of PCBs.
for waste water Recycling projects.
software Procurement and training under the GIS Project. Identification of waste minimization circle for Large and small industries. Identification and Training of Consultants. |
*
Physical Target
s for VIIIth Plan
1. World Bank aided Industrial Pollution Control Project.
- Procurement of equipment for 4 SPCBs viz. UP, Tamil Nadu, Gujarat & Maharashtra.
*
Physical Achievements for VIIIth Plan
(Rs. in Crores)
|
Name of the Scheme |
VIIIth Plan Outlay |
Actual Expdt. |
Physical Targets/ Achievements |
IXth Plan Outlay |
Goals set for Ninth Plan |
|
CLEAN TECHNOLOGY
|
15.00
|
14.26 |
Completion of 2 Carrying Capacity Studies, Initiating new projects on Life Cycle Analysis, Natural Resource Accounting & Demonstration Projects. |
20.00 |
New Sectoral Studies
Demonstration Projects, Data bases. |
56. REIMBURSEMENT OF WATER CESS
(Rs. in Crores)
|
Name of the Activity |
Outlay |
Actual Expdt. |
Physical Targets |
Physical Achievements |
IXth Plan outlay |
Goals set for IXth Plan |
|
REIMBURSEMENT OF WATER CESS (Non-Plan Scheme) |
106.85 |
144.78 |
-- |
-- |
-- |
Since the expenditure is being met from the Non-Plan budget and is made on the basis of the collection and deposit of Water Cess in the Consolidated Fund of India, no outlay has been proposed for IXth Plan |
57. TAJ PROTECTION MISSION
(Rs. in Crores)
|
Scheme/ Activity |
8th Plan Outlay |
Expdt. |
Target/ Achieve-ments |
IX Plan Outlay |
Goals set for Ninth Plan |
Achievements |
|
Taj Protection Mission
|
-- |
-- |
-- |
200.00 |
Ten schemes have been formulated under this project for overall improvement of Environment in and around the Taj Mahal. Five new projects have been prepared and are being approved by Central Government. |
All schemes under this project are at various stages of completion. For new five projects EFC clearance and CCEA approval is being obtained. |
(Rs. in Crores)
|
Scheme/ Activity |
8th Plan Outlay |
Expdt |
Target/ Achieve-ments |
IX Plan Outlay |
Goals set for Ninth Plan |
Achievements |
|
TAXONOMY CAPACITY BUILDING
|
-- |
-- |
-- |
7.50 |
To build capacity in taxonomy in priority gap areas |
Programme initiated in 1999-2000. Funds released to 11 Centres for Research |
59. ENVIRONMENTAL MANAGEMENT CAPACITY BUILDING TECHNICAL ASSISTANCE PROJECT (WORLD BANK AIDED)
The project started in September 1997 only and hence no review of overall performance during Eighth Plan is called for.
(Rs. in Crores)
|
Name of the Activity |
Ixth Plan Outlay |
Goals set for IXth Plan |
Achievements |
|
ENVIRONMENTAL MANAGEMENT CAPACITY BUILDING TECHNICAL ASSISTANCE PROJEC |
115 |
* |
** |
*Goals set for IXth Plan
The main objectives under the project are formulation of Environmental Research programmes by setting priority areas, strengthening of teaching and research in environmental economics, decentralization of environmental education, strengthening environmental legal capacity of the Ministry, enhance capacity of number of mining institutions to improve monitoring compliance of environmental policy and standards, proposed new sites for new industrial estates, upgrade India’s air pollution monitoring, support environment related programmes in Gujarat to mitigate adverse environmental impacts of environmental problems.
**Achievements
Project implementation plans for all the sub-components included in the project have been prepared and approved by the World Bank. These plans are in various stages of implementation. Procurement of national and international consultants has been finalized including requirement of equipment and staff. Some equipments have already been procured and consultants appointed.
The Institute is proposed to be set up at Itanagar, Arunachal Pradesh as an autonomous institute
of this Ministry under Societies Registration Act to design and conduct research on various aspects of Bio-diversity. The goals set for the 9th Plan are as under:
(Rs. in Crores)
|
Name of the Activity |
VIIIth Plan Outlay |
Actual Expdt. |
Physical Targets/ Achievements |
IXth Plan Outlay |
Goals set for Ninth Plan |
|
INDIAN INSTITUTE OF BIO-IVERSITY |
-- |
-- |
-- |
10.00 |
Physical: To develop infrastructure facilities and building. To appoint Director and staff. To finalise SFC, Cabinet. Note and Memorandum of Association. |