5.
A REVIEW OF PERFORMANCE DURING 9TH FIVE YEAR PLAN AND GOALS SET
FOR THE 10TH PLAN
(I) The Ministry of Environment &
Forests was allocated an outlay of Rs.3,013.84 crores for its 9th Plan 1997-2002. The actual expenditure in 1997-98 was
Rs.406.70 crores, in 1998-99 it was Rs.497.77crores, in 1999-2000 Rs.539.90
crores, in 2000-2001, Rs.607.56 crores
and in 2001-2002 it was Rs.893.55 crores, making a total of Rs.2945.48 crores.
The sector-wise and year wise details of outlays/expenditure are as follows:
Table-A: Sector
wise/Year wise approved Outlays & Expenditure under 9th Plan.
(Rs.
in Crores)
|
Sector |
9th Plan Outlay Original |
Outlay 97-98 |
Expdt. 97-98 |
Outlay 98-99 |
Expdt. 98-99 |
Outlay
99-2000 |
Expdt.
99-2000 |
Outlay
2000-2001 |
Expdt.
2000-2001 |
Outlay 2001-2002 |
Expdt.
2001-2002 |
|
1 |
2 |
3 |
4 |
5 |
6 |
7 |
8 |
9 |
10 |
11 |
12 |
|
Environ-ment |
887.00 |
198.00 |
115.37 |
210.91 |
144.00 |
191.50 |
118.11 |
229.90 |
166.48 |
214.65 |
196.92 |
|
NRCD |
766.84 |
109.00 |
99.44 |
191.70 |
107.48 |
200.00 |
157.24 |
210.05 |
121.58 |
190.95 |
297.37 |
|
NAEB |
500.00 |
92.00 |
69.19 |
92.35 |
72.05 |
93.50 |
86.45 |
152.00 |
115.10 |
137.20 |
137.41 |
|
Forests &
Wildlife |
860.00 |
144.70 |
122.70 |
209.13 |
174.24 |
215.00 |
178.10 |
258.05 |
204.40 |
257.20 |
261.85 |
|
Total |
3013.84 |
543.70 |
406.70 |
704.09 |
497.77 |
700.00 |
539.90 |
850.00 |
607.56 |
900.00 |
893.55 |
Table-B: Sector-wise Plan outlay
& Expenditure in percentage under
the IXth Plan
(Rs. in Crores)
|
Sector |
9th Plan
Outlay Original |
Total Outlay Revised |
Total Expdt. |
Allocations (% increase
over original outlay) |
Expdt. (% increase
over original outlay) |
|
1 |
2 |
3 |
4 |
5 |
6 |
|
Environment |
887.00 |
1044.96 |
740.88 |
17.80 |
- 16.47 |
|
NRCD |
766.84 |
901.70 |
783.11 |
17.58 |
2.12 |
|
NAEB |
500.00 |
567.05 |
480.20 |
13.41 |
- 3.96 |
|
Forests & Wildlife |
860.00 |
1084.08 |
941.29 |
26.05 |
9.45 |
|
Total |
3013.84 |
3597.79 |
2945.48 |
19.37 |
- 2.27 |
6. OUTLAY FOR THE NINTH PLAN AND ANNUAL PLANS
1997-98, 1998-99, 1999-2000, 2000-2001
and 2001-2002 AND APPROVED OUTLAY FOR
TENTH PLAN.
Overall Plan
outlay/expenditure sector-wise
(Rs. in Crores)
|
Year |
Environment |
NRCD |
Forests & Wildlife |
NAEB |
Total |
|
9th Plan
approved outlay |
887.00 |
766.84 |
860.00 |
500.00 |
3013.84 |
|
1997-98 Outlay |
198.00 |
109.00 |
144.70 |
92.00 |
543.70 |
|
Expenditure |
115.37 |
99.44 |
122.70 |
69.19 |
406.70 |
|
1998-99 Outlay |
210.91 |
191.70 |
209.13 |
92.35 |
704.09 |
|
Expenditure |
144.00 |
107.48 |
174.24 |
72.05 |
497.77 |
|
1999-2000 Outlay |
191.50 |
200.00 |
215.00 |
93.50 |
700.00 |
|
Expenditure |
118.11 |
157.24 |
178.10 |
86.45 |
539.90 |
|
2000-2001 Outlay |
229.90 |
210.05 |
258.05 |
152.00 |
850.00 |
|
Expenditure |
166.48 |
121.58 |
204.40 |
115.10 |
607.56 |
|
2001-2002 Outlay |
214.65 |
190.95 |
257.20 |
137.20 |
900.00 |
|
Expenditure |
196.92 |
297.37 |
261.85 |
137.41 |
893.55 |
SECTOR-WISE 10TH PLAN APPROVED OUTLAY:
|
Year |
Environment |
NRCD |
Forests & Wildlife |
NAEB |
Total |
|
10th Plan
approved outlay |
1200.00 |
1670.00 |
*1775.00 |
1300.00 |
5945.00 |
|
2002-2003 Outlay |
**110.57 |
299.83 |
257.77 |
321.83 |
990.00 |
|
Expenditure |
**129.12 |
295.31 |
249.16 |
274.45 |
948.04 |
|
2003-2004 Outlay |
**218.43 |
294.76 |
266.81 |
230.00 |
1010.00 |
|
Expenditure |
**293.18 |
244.63 |
257.83 |
240.55 |
887.93 |
* Including Rs.175.00 Crores for
Animal Welfare Division.
** Including Secretariat and CCU
7. The scheme wise details of outlay,
expenditure, physical targets and achievements during the 9th Plan period in
all the sectors as above, and the
outlay and the goals set for 10th Plan are as below:
8. INDIAN COUNCIL OF
FORESTRY RESEARCH AND EDUCATION (ICFRE), DEHRADUN
It is an autonomous body
under the Ministry of Environment and Forests, Government of India. Full
autonomy was accorded to ICFRE w.e.f. the 1st June 1991. Following
are mandate of the council:-
(i)
To
undertake, aid, promote and co-ordinate forestry education, research and its
application.
(ii)
To
act as a clearing-house for research and general information relating to Forest
& Wildlife.
(iii)
To
develop forestry extension programmes and propagates the same through mass
media, audio-visual aids and extension machinery.
(iv)
To
provide Consultancy services in the field of forestry education & training
and in allied sciences.
(v)
To
do other things considered necessary to attain the above objectives
It has 8 Institutes and 3
satellite Centres spread all over the country. Each Centre is attached to an
Institute. At the ICFRE (HQ) there are 4 Directorate viz. Directorate of
Administration, Directorate of Research, Directorate of Education &
Directorate of Extension.
The thrust of forestry research was on
reducing pressure on natural resources by increasing productivity through
genetic and silvicultural improvement, and making available wood substitutes;
eco-restoration through treatment of wasteland; conservation of forest
ecosystems; tribal development and social forestry.
Its achievements during IXth Plan and goals for the
X Plan are as under:-
(Rs. in crores)
|
No. |
Programme |
9th Plan outlay |
Expenditure |
Physical Targets
|
Physical
Achievements
|
||
|
Plan |
Non-Plan |
Plan
|
Non-Plan |
||||
|
1. |
General
Component |
157.75 |
48.58 |
153.78 |
48.58 |
@ |
|
|
2. |
Education
& Training |
9.15 |
4.53 |
9.15 |
4.53 |
||
|
3. |
Externally
Aided Component |
107.17 |
- |
133.21 |
- |
||
|
4. |
North-East
|
1.00 |
- |
1.00 |
- |
||
|
|
Total |
275.07 |
53.11 |
297.14 |
53.11 |
||
II. B. OUTLAY
FOR THE Xth PLAN
(Rs. in crores)
|
Programme |
Xth Plan Outlay |
Goals set for Xth Plan |
Achievements |
|
PLAN Forestry
Research 1.GeneralComponent 2. Education & Training 3. Externally Aided Component Total:- |
196.50 13.50 - 210.00 |
@@ |
|
9. INDIAN
PLYWOOD INDUSTRIES RESEARCH & TRAINING INSTITUTE (IPIRTI), BANGALORE
The Institute
was established in 1961-62 as a Central Research Laboratory of the Indian
Plywood Manufacturers' Research Association under the Co-operative Research
Scheme of the Government of India from out of the funds provided by CSIR and
voluntary contribution from the Plywood Industries (in pursuance of Ministry of
Commerce and Industries Resolution No.CI-9 (5)/50 dated 22.9.1951). Since its
inception the Institute is an autonomous body registered as a society under the
Karnataka Society's Registration Act No. 16 of 1960 (Registration No.
S-6/1961-62 dated 24th October 1961).
Consequent to
the re-organization of the CSIR during 1977-78 (vide letter No. 5(15)/77-IED dated 21.3.1978 of the Secretary, DST
and Notification No.CD-261/78 dated 6-4-1978), IPIRI was transferred to the
Ministry of Industry, government of India. Subsequently, vide Government Order No.2/1/88-CI of the Ministry of Industries,
Department of Industrial Development dated 30-4-1990, the Institute was
transferred to the administrative control of Ministry of Environment and
Forests (Government of India (GOI/Allocation
of business rules (211 amendment) 1959) amended vide Cabinet Secretary notification dated 15.5.1990 The name of the
Institute was changed to Indian Plywood Industries Research and Training
Institute (IPIRTI) in the year 1992.
Broadly speaking the present mandate of the Institute includes:
Research on all aspects of production of sawn timber, manufacturing
plywood and other allied engineered and reconstituted wood or lignocellulosic
products, including improvement of materials, manufacturing processes,
improvement of machines and appliances, conditions of work - time and motion
studies - standardization of methods of work -conditioning of factories,
Inspection, certification and marking of all forest products viz. plywood, wood, timber, hardboard,
particleboard, chipboard, furniture, glue-lam, compreg, doors, panel doors,
block board, flush doors, veneered panels, veneers, laminated panels, composite
boards, and the products of allied trade and industry,
Training in connection with forest product utilization for plywood industry
and trade, and allied industries, imparting technical education and/or training
at undergraduate, postgraduate, and/or any other level in technology of forests
products and plastics, chemicals and paper laminates, and/or synthetic
finishing, manufacturing machinery.
Contribution
made by the institute since its inception in the areas of wood
products/composites research and providing timely technological interventions
and commercial interaction with the industry resulted in establishment of
organized plywood and allied industry sector. The plywood industry in the
country is technologically competent to produce high quality wood-based
products to meet the varied domestic market needs and export.
The Institute’s
Vision is "Conservation of
natural forests through development and adoption of efficient technologies for
manufacturing wood alternates and panel products from renewable fibers,
including plantation timbers &
bamboo to meet the vital needs
of our developing society".
Its achievements during IXth Plan and
goals for the X Plan are as under:-
(Rs. in crores)
|
Sl. No. |
Programme |
9th Plan Outlay |
Expdt. |
Physical Target |
Physical Achieve-ments |
X Plan Outlay |
Goals set for X Plan |
Achievements |
|
1 |
Inputs to improve research capability in Labs., experimental
plant at IPIRTI and Training Centre for Mechanical Wood Industries |
*4.82 |
4.35 |
@ |
33.70 |
@@ |
||
*Against this amount of Rs.4.82 Crores, amount sanctioned from MOEF is Rs.4.19 Crores
@ Physical Target
and Achievements
There is a huge
gap between supply and demand for wood, including the gap in respect of
industrial wood raw material, which is of the order of 25-30 per cent of the
demand. The gap decrease gradually when
the benefits of the intensive effort now being made to grow trees through agro/social/farm
forestry, other plantations and better management of natural forests through
innovative practices starts flowing to the society. Wood is the most eco-friendly and can be produced in a
sustainable manner to meet the increasing demand of growing population.
At IPIRTI, R &
D activities have already been reoriented to achieve the twin goals of
rationalizing the wood utilization of available wood resources through
appropriate technological innovations and development of wood alternates from
other natural/renewable fibres. To
achieve these goals, various projects have been pursued under following
headings.
A RESEARCH AND DEVELOPMENT
1. RESEARCH
Research projects
pursued during the 9th Five Year Plan in various disciplines are as follows:
1.1 Wood
and Wood Composites
Due to shortage of indigenous
timbers from natural forests for plywood manufacture, particularly to produce
high quality face veneers, studies were conducted to find out the suitability
of imported species to enhance the acceptability of panels based sustainability
on fast growing plantation wood grown in the country.
Study on the suitability of
newer plantation grown timber species with constant improvement of
technological innovations on efficient utilization is a continuing process
including their evaluation for the production of higher grades of plywood.
Fast growing plantation timbers
are very prone to warping thereby limiting wider acceptability of panels from
such species. Tenderizing technique to
overcome this problem has been worked out in laboratory scale experiments and
industrial model is planned followed by its industrial adoption. Finger jointing of veneers for higher
recovery from small girth logs is also
under progress.
Revision of I.S. specifications
in context of use of fast growing plantation wood are pursued to expand the
scope of the plantation grown timbers.
Development of Laminated Veneers Lumber (LVL) is another study showing
promising results having higher potential for innovative applications as
alternate to sawn wood products in joinery and carpentry products.
Development of glued laminated
timber through finger jointing technique has been evolved for the efficient use
of plantation wood for value added products is quite encouraging. Defect free smaller sections of timber of
plantation origin can be finger jointed and edge laminated to frame into larger
section with improved physico-mechanical properties.
Development of innovative
resins, adhesives, additives for resin adhesives to improve performance or to
enlarge raw material base are being pursued from the beginning. Efforts are
also being made to develop resin with lesser formaldehyde emission, which are
becoming mandatory in other countries. Phenolic resin where phenol has been
replaced by materials of natural origin has been developed keeping in view of
the ever increasing cost of phenol.
Attention is also being given in
recent years to minimize the pollution of water/air etc. through proper
treatment techniques.
1.2 Composites
from Non-wood Lignocellulosic materials
Development of bamboo based
composites is a thrust area of R & D at the Institute and a number of
innovative products have been developed, some of which are commercialized. They include:
Development of Bamboo Mat Board
(BMB)
Bamboo Mat Veneer Composites
(BMVC)
Bamboo Mat Moulded Trays (BMMT)
Bamboo Mat Corrugated Sheets
(BMCS)
Bamboo Laminates (BL)
Bamboo Match splint (BMS)
Structural products from bamboo
based housing system
These products have been found
to be environmentally friendly giving vast employment opportunities to rural
poor particularly women.
Development of particle board
from forest residues like Chir pine needles through innovative process
developed at the Institute under a sponsored project and the use of particle boards in door making, an essential
requirement of housing, is quite
promising.
Development of moulded products
from coir non-woven felt developed
has enormous potential as
alternate to house-hold moulded products as alternate to the ones based on
plastics, metals, etc. Work has also
been initiated to develop panel products based on coffee husk, Casuarina
needles, banana sheath, etc.
1.3 Enhancement
of service life of wood and wood based panel products
R & D activity on this
subject is being pursued to evaluate the performance of newer preservative
compositions as well as agricultural
pesticides evolved to preserve wood and wood based panels to enhance service
life. This has become more relevant
with extensive use of plantation wood which are generally non-durable.
Testing
Product testing is an important activity aiming at production of
quality products by the Industry and helping consumers, including Government
organizations in checking quality of goods purchased. IPIRTI is also a laboratory recognized by BIS for testing of wood
and wood composites and products for licensing/certification programme. Limited test facility is also available at
the Kolkata Field Station. During the
year samples were tested for conformity to relevant standards, including
testing of samples drawn by BIS.
924 samples of
wood and wood based panels including resin and chemicals, details
of which are given below, received from
outside agencies were tested as per relevant standards.
Products/Materials tested
|
Product/Material |
No. of samples |
|
Plywood |
173 |
|
Block
board/Flush door |
150 |
|
Particle & Fiber board |
51 |
|
Resin &
Chemicals |
172 |
|
Wood &
Veneers |
358 |
|
Others |
20 |
|
Total |
924 |
Standardization
The Institute continues to play
significant role in formulating and evaluating standards, specifications for
wood, wood products and products from lignocellulosic materials by serving on
various committees/subcommittees of BIS, the national standards body of India
responsible for formulation of standards.
C Extension
Extension is one of the
important activities provided by IPIRTI to Industry. This activity has become an important assignment to extend the
Research & Development of the Institute to wood and wood based industries
including bamboo and other lignocellulosic materials.
D Training and
Education
Training is an important
tool to facilitate efficient use of a resource through making available trained
personnel at various levels in industries, and enhancing the professional
competence of the industrial workers through refresher courses in different
disciplines. IPIRTI is the only training institute of its type in the country
in the field of mechanical wood industries. In addition to imparting training to
meet the HRD needs of the Mechanical Wood Industries, the Institute is also
making available its facilities for projects works undertaken by engineering
students. The Institute has constituted
a committee to evolve a revised syllabus related to wood and wood products for
graduate courses in civil engineering.
i) Post Graduate Diploma Course
The postgraduate diploma
course in Mechanical wood industries, the only one of its type in the country,
has been widely recognized by the industry and the Diploma holders are in high
demand. During the year 22 trainees successfully completed the PGDC (Fourteenth
batch) and were able to get employment through campus recruitment. XV PG
Diploma Course was started in December 2003 with 22 candidates. So far 344
candidates have been successfully completed the Diploma Course.
ii) Short Term Courses
Several short-term
vocational training courses offered by the Institute for enhancing/updating
skills of employees, continue to draw attention of both small and medium scale
wood based enterprises. Introductory
training in Plywood manufacturing started at Calcutta Field Station during 1999
was continued during the year. During
this year 14 training courses were conducted by the institute through which 180
persons sponsored by the various industries were trained.
iii) One Week Training for IFS officers
Institute conducted 3
training programmes on 8th to 12th September 2003, 13th
October 2003 to 17th October 2003 and 16th February to 20th
February 2004 for IFS officers drawn from different parts of the country on
"Innovative Industrial Product from Bamboo for poverty alleviation"
and "Wood substitutes from Agro and Forest residues". In all 51 Officers participated in the
programme.
@@ Goals set for the X Plan
and achievements
IPIRTI is making all efforts to
ensure the findings of laboratory results to commercialize the processes
developed for efficient utilization of fast growing plantation timbers and
renewable fibres for the manufacture of panel products as alternate to wood
which is a continuing endeavor. Some of the laboratory findings with
promising results will be further taken up for refinement of technologies
suitable to make for commercial adoption.
The main emphasis during the X
Five Year Plan are in the field of wood and wood based
composites, wood alternates for panel manufacture from bamboo and other
renewable fibres including bamboo, Testing and standardization and training are
as follows:
a)
Inputs
to improve research capability in laboratories and pilot plant at Indian
Plywood Industries Research and Training Institute.
b)
Training
in the field of Mechanical Wood
Industries Technology.
a) Development of bamboo based panel products, product
development, standardization of products, transfer of technologies,
establishment of demonstration centres, training of growers, entrepreneurs,
evaluation of standards and code of practice.
·
Establishment
of bamboo mat processing units for the development of bamboo mat based products
as an alternate to wood and wood products.
·
Establishment
of pilot plant for the development of appropriate technology for particleboard
aiming fuller utilization to wood, bamboo and agro and forest residues.
·
Development
of overlays and overlaying techniques for particleboard for value addition.
·
Extension
of Technologies already developed like BMB, BMMT, BMCS, Bamboo Housing etc.
·
Development
of technology for production of users' product from BMB and BL.
·
Propagation
of technology for bamboo based housing system through out the country.
b) Improvement of sawing techniques for the manufacture
of sawn timber for efficient utilization of plantation wood.
·
Development
of innovative engineered products from plantation wood through finger jointing
and laminating techniques.
·
Human
resource development programmes for farmers, entrepreneurs, technical
personnel, consumers aiming self-reliance with requirements of timber and
timber products.
·
Establishment
of facilities for seasoning of timber for research and training.
c) Information
and Consumer awareness programmes
·
Preparation
Of Techno Commercial Project Report On Varies Bamboo Based Products Developed
By The Institute
·
Organization
of seminars and workshops for consumer awareness in different parts of the
country.
·
Preparation
of publicity materials for consumer awareness
·
Regular
updating of IPIRTI website for benefits of industry.
d) Training
courses for IFS officers, Assistant Conservator of Forests, Range Forest
Officers.
e)
Construction
of residential quarters for staff members in a phased manner and extension of
laboratories for research purpose.
Inclusion of centre for testing and
evaluation of materials, products, components from wood, bamboo, non-wood
natural renewable fibres including agro-residues based on National
Accreditation Board for testing and calibration Laboratory (NABL).
10. INDIAN INSTITUTE OF FOREST MANAGEMENT
(IIFM), BHOPAL
The
Indian Institute of Forest Management, Bhopal was established on January
15,1982. The main task of the Institute is to facilitate and actively
contribute to the development of managerial capacity in the forestry sector.
The main objectives of the Institute are:
a) Provide
training in management and related subjects for persons from the Indian forest
service, Forest Departments, Forest Development Corporations and forest related
industries with a view to equip them to practice the art and profession of
management of forestry development.
b) Select
and prepare outstanding and talented young persons for careers leading to
management responsibility in forestry and related system.
c) Meet
the need of Indian forestry and forest related industry and commerce in respect
of upto date information on forestry management through research, consultancy
and publication.
d) Assist,
Institute and carry out research in matters concerning use of management and
allied techniques and methods conducive to the development of forestry in the
country.
Its achievements during IXth Plan and goals
for the Xth Plan are as under:-
|
S.No |
Programme |
IXth Plan Outlay |
Expdt. |
Physical
Target |
Achieve-ment |
Xth Plan
Outlay |
Goals set for
Xth Plan |
Achievement (upto Oct. 04) |
|
01. |
MDP/Courses & Seminars |
13.00 |
14.11 |
75 MDPs & 19 Workshops |
52 MDPs, 21 Workshops, 2 Seminars |
20.00 |
90 MDPs & 20 Workshops, 15 Seminars |
22MDPs and 3 Workshop during (F.Y.02-03), 22 MDP and,11 Workshops during (F.Y.2003-04), 22 MDPs and 3
Workshops during (F.Y.2004-05 upto Oct. 04) |
|
02. |
PGDFM/MRM |
|
|
Every year 35 students in PGDFM,5 seats to SAARC students, 5 seats for
foreign nationals/NRIs. 20 persons in MRM. |
198 admission in PFM and 74 admission
in MRM including SAARC & NRI sponsored students |
|
Every year 45 students in PGDFM, 20 Admissions in MRM. |
41 ( F.Y.
2002-03), 37( F.Y.2003-04), 44 (F.Y. 2004-05) Admissions in PGDFM, 18 ( 2002-03),20(2003-04), 17 (F.Y. 2004-05) Admission in MRM . |
|
03. |
Ph.D./Research Studies & Consultancy |
|
|
Ph.D. Programme - 10 Nos |
6 registered, 4 registration awaited |
|
|
6, student registered during F.Y. 2002-2003 and 3, student registered
during F.Y. 2003-2004 |
|
04. |
Manpower (Salary & Wages) and other expdt. |
|
|
Salary & Wages to supporting
staff and also to fill up the vacant posts |
Regular expenditure was made |
|
Salary & Wages to supporting
staff and also to fill up the vacant posts. |
Regular expenditure is being made. |
|
05. |
Library |
|
|
New additions of books/journals
and magazines are proposed for constant flow of information,1000 books and
250 journals/ periodicals |
3083 Books and 1058 periodicals / journals has been purchased. |
|
Procurement of 600 books and 200
journals every year. |
461
books and 200 Journals in (F.Y. 2002-03), 762 books and 200 Journals in (F.Y.
2003-04) and 195 books and 200 journals in (F.Y. 2004-05) were purchased |
11. STATE FOREST SERVICE AND RANGERS COLLEGES
The Directorate of Forest Education functions directly under the Ministry of Environment & Forests. The mandate of the Directorate is as follows:
(i)
To
cater to the training needs of SFS Officers and Forest Rangers of States /
Union territories in the country. Candidates sponsored by various public sector
undertakings, industrial firms, other institutions, universities and foreign
countries are also trained in these Institutions.
To ensure ‘standard and quality’ training imparted to the forestry personnel.
(iii) To help develop training ‘capacity and facility’ of desired standard, for various functionaries of forestry sector.
(iv) To assist develop appropriate and relevant training contents and evaluation standards for forestry training at various levels.
(iv)
To
generate awareness and sensitivity about forests and forest conservation
amongst various stakeholders.
(v)
To
assist the Centre and the States to develop training policy for efficient human
resource management and development.
(vi)
To
help States assess ‘Training Needs’ of forestry personnel for quality and
standard training.
The achievements during the IXth Plan and goals for
the Xth Plan and achievements so far are as under:
(Rs. in crores)
Programme
|
IXth Plan Outlay |
Expdt. |
Physical target |
Physical Achieve-ments |
Xth Plan Outlay |
Goals set for Xth Plan |
Achieve-ments |
|
SFS & Rangers Colleges |
5.00+ 1.00* |
4.28+ .0.57* |
|
|
6.00+ 4.00* |
- |
- |
|
Training of SFS officers |
|
- |
15 courses |
7 courses |
|
5 courses of 2 years duration (5 for newly
recruited+5 senior batches will continue training in 2nd year) |
2 courses of 2 year duration completed and 2
courses are going on). Remaining goal
will be achieved during the balance period of Xth Plan. |
|
Training of Forest Rangers |
|
- |
2 courses |
5 courses |
|
15 courses (15 for newly recruited+15 senior batches will
continue training in 2nd year) |
5 courses completed and 5 courses are going on. Remaining
goal will be achieved during the balance period of Xth Plan. |
|
Refresher
Courses for In-service SFS officers with 30-35 participants in each course. |
|
- |
55 courses |
39 courses |
|
45 courses |
20 courses. Remaining goal will be achieved during the balance
period of Xth Plan. |
|
Courses on Computer Application in Forestry for
In-service SFS officers with 30-35 participants in each course (Basic &
Advance courses). |
|
- |
34 courses |
43 courses |
|
50 courses |
27 courses. Remaining goal will be achieved during the balance
period of Xth Plan. |
|
Theme based Courses in Forestry for in-service SFS
officers with 25-30 participants in each course. |
|
- |
5 courses |
16 courses |
|
40 courses |
14 courses. Remaining goal will be achieved during the balance
period of Xth Plan. |
|
Two weeks “Trainers Training Course” with 20
participants each. |
|
- |
- |
1 courses |
|
8 courses |
4 courses. Remaining goal will be achieved during the balance
period of Xth Plan. |
|
Two weeks “Refresher Course” for Range Officers
with 30 participants in each course. |
|
- |
- |
- |
|
10 courses |
5 courses. Remaining
goal will be achieved during the balance period of Xth Plan. |
|
Seminars and Workshops on different themes of
Forestry at SFS Colleges, Dehradun, Burnihat, Coimbatore and EFRC, Kurseong |
|
- |
- |
5 |
|
15 |
2 Remaining goal will be achieved during the balance
period of Xth Plan. |
Courses for sister and other organisations on request.
|
- |
- |
- |
2 courses |
|
- |
3 courses. (No target is fixed for such courses. However, courses are conducted only on
receipt of demand from the States/Organisations). |
|
Promotion linked courses for ACFs |
|
|
8 Course (4 course for ACF and 4 for Forest
Rangers |
Course curriculam prepared and sent to Ministry
for approval. |
|
15 courses |
Course curriculam sent to Ministry for approval,
which is under consideration. |
Note:
In addition to above short term refresher
courses for the Deputy Rangers/Foresters/Forest Guards started from the year
2003-2004. 10 such courses has been
fixed for the year 2004-2005.
12. IN-SERVICE TRAINING FOR IFS OFFICERS
Ministry of Environment and
Forests being nodal ministry in respect of the Indian Forest Service Officers
sponsor one/two-week refresher training courses in the premier institutes all
over the country on the pattern of DoPT guidelines as applicable to the other
All India Service Officers, i.e., IAS/IPS etc.
The basic aim of the
in-service training courses is to upgrade the managerial skills of the officers
in the changing socio-economic scenario of the country as also expose them to
the recent developments in the field of forestry and allied subjects to enable
them to handle their present duties and future needs better. The training courses also provide a forum
for the IFS officers serving in different regions of the country for sharing of
experiences for efficient discharge of their responsibility.
In addition to above
one/two-week compulsory training courses, it is proposed to sponsor six IFS
officers each for undergoing courses on “Advanced Professional Programme in
Public Administration” at IIPA-New Delhi and one year course on “Executive Post-graduate Diploma in Business
Programme” at MDI, Gurgaon, Haryana during 2005-06.
The achievements during the IXth Plan and goals for
the Xth Plan and achievements so far are as under:
(Rs. in Crores)
|
Programme |
IXth Plan outlay |
Expdt. |
Physical
target |
Physical Ach. |
Xth Plan
outlay |
Goals set
for Xth Plan |
Achievements |
|
In-service
training for IFS officers |
5.00 |
100% |
100% |
100% |
6.00 |
To sponsor one/two-week training
courses for 1400 officers and sponsor 9/12 months advance training courses
for about 12 IFS officers each in the remaining period of the five year plan.
|
100% |
13. INDIRA
GANDHI NATIONAL FOREST ACADEMY (IGNFA), DEHRADUN
IGNFA
was constituted in the year 1987 by renaming the erstwhile Indian Forest
College vide Ministry of Environment and Forest order no.1-6/87-RT dated
25.5.87. This Academy is engaged in
imparting induction training to IFS (Probationers) and in-service training of
one week/two weeks to the in- service officers. Academy has also started Professional Skills Upgradation Training
for the officers promoted to Indian Forest Service from SFS. Brief objectives/activities of the Academy
are as under:
1.
Conducting initial training of IFS probationers extended over a
period of three years.
2.
Organizing Professional Skills Upgradation training programme for
officers of SFS promoted into IFS.
3.
Conducting compulsory course for in service IFS officers at
middle/senior level.
4.
Organizing seminar/workshop on relevant Sectoral issues, case
studies etc.
5.
Conducting Advanced Forest Management Courses of in service
courses for officers of 10 years, 7 years and 21 years of service.
( Rs. in Crores)
|
Programme |
9th Plan |
Expdt. |
Physical Target |
Achieve-ment |
10th Plan Outlay
proposed |
Goals set for X Plan |
|
Training of IFS Probationers and
officers |
9.77 |
9.72 |
1.
Training of IFS Probationers recruited from the year 1999 to 2002. 2. Compulsory courses for in service IFS officer. 3. Professional Skills Upgradation training programme 4. Advanced Forest Management Courses for officers of 10, 17 and 21 years of service. |
Targets set out
for academy were fully achieved. |
35.28 |
* |
* Goals set for Xth Plan
1.
To Impart training to IFS
probationers and in service officers.
14. FOREST SURVEY OF INDIA (FSI)
Forest Survey of India (FSI)
was created in June, 1981 with the objective of monitoring periodically (ten
years cycle) the changing situation of land and forest resources and present
the data for national planning;
conservation and management of environmental preservation and implementation of
social forestry projects.
The goals and objectives of Forest Survey of India are
given below:
(1) To
prepare a comprehensive State of the Forest Report (SFR) including
National Vegetation Map (NVM) once in
very two years. To prepare thematic maps through use
of remote sensing data with
minimum essential ground
truth verification on a ten year cycle.
(2) To
collect, store and retrieve necessary forestry and forestry related
data for national and state
level planning and to create a
computer based National Forest Inventory System (NBFIS).
(3) To design methodologies relating to
forest surveys and subsequent
updating. This would include methodologies for:
(a) Vegetation mapping including thematic
maps use of satellite imageries/aerial
photographs.
(b) Ground
truth verification
(c) Growing
stock and volume assessment.
(4) To
undertake work in regard to preparation
of forest inventory in selected States/UTs on agency
basis until establishment of their own resources survey units.
(5) To
impart training in modern forest survey
techniques to foresters at
various levels of responsibility in the State/UTs/GOI.
(6) To
advise the State/UTs on design and
development of regional NBFIS.
(7) To
support and oversee
techniques/inventory undertaken by State/UTs Forest Departments.
The physical targets and achievements of
FSI during the IXth Plan and the goals set for the Xth Plan are
as under:
(Rs. in Crores)
|
S.No. |
Programme |
9th Plan
outlay |
Expdt. |
Physical
Target |
Achievement |
Xth Plan
Outlay |
|
1. |
Application
of Remote Sensing Techniques in Survey of Forests |
21.00 |
15.56 |
Details given below |
|
35.00 |
|
|
Name
of Activities |
|
|
|
|
|
|
1A. |
Forest
Inventory |
|
|
4,30,000 |
6,92,039 |
|
|
1B. |
Data
Processing |
|
|
4,30,000 |
4,87,423 |
|
|
1C. |
Thematic
Mapping |
|
|
670 |
660 |
|
|
1D. |
Vegetation
Mapping |
|
|
907 |
911 |
|
|
1E. |
Training |
|
|
450 |
599 |
|
|
1F. |
Special
Studies |
|
|
10 |
14 |
|
Physical Target And
Achievements 2003 –2004
(Area in Km2 )
|
SI.No. |
Programme |
Physical
Target |
Achievements |
|
|
Application
of Remote Sensing Techniques in Survey of Forests |
|
|
|
1. |
(a)Procurement
of cloud Free
Satellite Data |
315
Satellite Scenes |
286 |
|
|
(b)
Rectification of Satellite Data Geo-reference on SOI Toposheet. |
315
Satellite Scenes |
286 |
|
|
(c)Interpretation
(classification ) of Satellite Data through Data Image processing (DIP) |
315
Satellite Scenes |
286 |
|
|
(d)Ground
Truthing / Ground Verification |
|
259 |
|
|
(e)Incorporation
of corrections, change detection and area calculation. |
200Toposheets
(on 1:250,000scale) |
|
|
2 |
(a)
Forest Inventory |
30Districts |
30 |
|
|
(b) TOF
(Rural) |
30Districts |
27
|
|
|
(C)
TOF Urban |
30Districts |
30 |
|
|
(d) Data Processing |
30Districts |
- |
|
|
(e) Training |
100 Officials |
154 |
Details of Physical Targets
and Achievements for Xth
plan
|
Sl. No. |
Programme |
2004-2005 |
2005-2006 |
|
|
|
Application of Remote Sensing Techniques in Survey
of Forests |
Physical
Target
|
Achievement |
Physical Target
|
|
1. |
Forest Cover
Assessment i) Data procurement ii) Data rectification iii) Data Classification iv) Ground verification v)Corrections, area calculation and map
generation. |
315*Scenes 100*Scenes 50*Scenes 134**Scenes Top
sheets |
Worked
of 9th cycle completed Worked
of 9th cycle completed Worked
of 9th cycle completed 134
toposheets (1:250,000 scale) |
0 215
Scenes 265
Scenes 200
Topo Sheets |
|
2. |
Forest Inventory i) Inventory Data Collection ii) Data checking & entry iii) Data processing & Output |
30*
+1^Districts 30
+1^Districts 30
+1^Districts |
5 34 30 |
30 Districts |
|
3. |
Inventory of
TOF (Urban) i) Inventory Data Collection ii) Data checking & entry iii) Data Processing & Output |
30*
+1^Districts 30
+1^Districts 30
+1^Districts |
5 34 30 |
30 Districts |
|
4. |
Inventory of
TOF (Rural) i) Procurement of PAN data ii) Image process. & Sample gen. iii) Inventory Data Collection iv) Data checking and entry v) Data processing & output |
30*
Districts 30
+1^Districts 30
+1^Districts 30
+1^Districts 30
+1^Districts |
40 21 8 34 30 |
30 Districts |
|
5. |
Resources
Consumption Study
|
30
District |
|
30 Districts |
|
6. |
Training |
100 Persons |
96 |
100 Persons |
* For the period covering 10th Cycle(New)
** For the period covering 9th
Cycle(Previous)
^ Work for the Forest Inventory, ToF (R) & (U)
Inventory of one district of last year (2003-04) is to be carried out in this
year.
15. FOREST PROTECTION AND
REGENERATION
During
IXth Plan a Central Sector Scheme ‘Modern Forest Fire Control Methods (MFFCM)’
was being implemented under which funds were being provided to 11 States. The
Scheme was reviewed and after EFC’s approval in Nov 2000, the Scheme was
extended to all the States and renamed as “Forest Fire Control &
Management”.
The
achievements in the IXth Plan and goals set for Xth Plan are given hereunder :
(Rs. in Crores)
|
Programme |
IXth Plan
Outlay |
Expdt |
Physical Target |
Physical Achievements |
X th Plan Outlay |
Goals set for X th Plan |
|
MFFCM FFCM |
40.00 |
7.68 23.01 |
To assist the
State Government for taking effective
measures for prevention & control
of Forest Fires -do- |
States were
assisted for taking effective steps
for prevention & control of forest fires |
|
|
|
Infrastructure Development |
45.77 |
45.77 |
To assist all NE
States & Sikkim for strengthening of infrastructure for forest protection |
Forest
Protection Infrastructure |
|
|
|
Integrated Forests Protection Scheme IFPS |
- |
- |
- |
- |
445.00 |
To assist all
States & UTs for fire protection, Infrastructure Development for forest
protection & preparation of Work
Plan & Survey & Demarcation of forest areas |
16. FOREST CONSERVATION
Under the Scheme
“Strengthening of Forestry Division”, six Regional Offices are implementing the
Forest Conservation Act and monitoring of environmental clearances accorded by
the Ministry under Environment Protection
Act.
The physical and financial
achievements during the IXth Plan and goals set for Xth Plan are as under:-
(Rs. in Crores)
(Physical in no.)
|
Programme |
IXth Plan outlay |
Expdt. |
Physical target |
Physical achievement |
Xth Plan Outlay Financial |
Goals set for Xth Plan |
|
|
Plan scheme of Forestry Division of
Monitoring six Regional Offices located at Bangalore, Bhubaneswar, Bhopal,
Lucknow, Shillong and Chandigarh |
Financial Revenue Capital |
15.00 5.00 |
19.70 6.75 |
|
|
22.00 12.00 |
|
|
1. Monitoring of project
approved under FCA 1980 for compliance of stipulated conditions. |
|
|
4750 |
4544 |
|
4750 |
|
|
2. Monitoring of projects
approved under EPA, 1980 for compliance of stipulated conditions. |
|
|
2000 |
3462 |
|
2000 |
|
17. WILDLIFE
Ministry of Environment and
Forests oversees implementation of Wildlife (Protection) Act, provides
assistance to State Governments for development and protection of National
Parks and Wildlife Sanctuaries and deals with matters relating to Wildlife
Institute of India (WII), Dehradun and Convention on International Trade in
Endangered Species (CITES).
18. STRENGTHENING
OF WILDLIFE DIVISION AND CONSULTANCIES FOR SPECIAL TASKS
The Scheme was started from 1986 with activities
like Strengthening of Wildlife Division and Regional Offices in Delhi, Mumbai,
Calcutta and Chennai with adequate manpower and development of infrastructure
for better enforcement of Wildlife (Protection) Act, CITES, etc. Three sub-regional offices at Guwahati,
Amritsar (shifted from Pathankot) and Cochin were started. The achievement of
the Scheme during the IXth Plan and Goals set for the Xth Plan are as under.
Four Regional Offices at the
main trade centres of the country i.e. Delhi, Calcutta, Chennai and Mumbai were
set up to control the illegal trade in wildlife during the IXth Plan. During the IX Plan the outlay was fixed at
Rs. 18 cores out of which 5.5748 crores have been utilised under the scheme.
(Rs. in Crores)
|
Programme |
9th Plan Outlay |
Exp. |
Physical Target |
Physical Achieve ment |
Xth Plan Outlay |
Goals set for Xth Plan |
Achievement Till
31.10.04 |
|
Strengthening of Wildlife
Division and Consultancies for special taks |
18.00 |
5.5748 |
No
physical target can be taken as Regional Offices salary, Office expenditure
and domestic travel expenditure are being paid under this scheme. Funds are
also provide for consultancies for special taks as and when there is a
proposal for the same. |
-- |
10.00 |
1. Strengthening of Central Unit. 2.
Regional and Sub Regional Offices. 3.
2. Consultancy for special task |
4.93 |
19. ASSISTANCE FOR
DEVELOPMENT OF NATIONAL PARKS AND SANCTUARIES
The objective of this scheme
is to provide financial assistance to the States and UTs to develop National Parks and Sanctuaries
and encourage them to extend the Protected Area Network. The scheme provides financial assistance for
habitat development for Wildlife and biodiversity conservation and to create
infrastructural facilities for better protection and management. Hundred percent assistance is provided under
this scheme for identified items of non-recurring expenditure in the case of
national parks. Fifty percent
assistance is also provided in respect of certain identified recurring items of
expenditure. For Protected Areas (National Parks and Wildlife Sanctuaries both)
in high altitude region, deserts or ocean eco system with identified endangered
species, both recurring and non recurring items of work are provided financial
support.
The total allocation under
this scheme during the IX Plan was 70 crores and the EFC was approved for Rs.
70.00 crores. Out of the existing 589
National Parks and Sanctuaries in the country, only about 220 protected
areas were funded under this scheme.
The achievement during the 9th
Plan and goals set for the
10th Plan are as under:
(Rs. in Crores)
|
Programme |
9th Plan
outlay |
Exp. |
Physical Target |
Physical Achievement |
Xth Plan
Outlay |
Goals set
for Xth Plan |
Achievement
till 19.11.2004 |
|
Assistance
for Development of National Parks/ Sanctuaries |
70.00 |
82.67 |
250 (National Parks & Sanctuaries |
220 protected areas |
350.00 |
350.00 |
27.81 |
20. WILDLIFE INSTITUTE OF INDIA
(WII)
WII was
established in 1982 under the erstwhile Ministry of Agriculture and
Co-operation and subsequently brought under the Ministry of Environment and
Forests. The main mandate of the Institute is to impart training to government
and non-government personnel to carry out research and advise on matters of
conservation and management of wildlife resources. In April 1986, autonomous
status was granted to this Institute for developing its professional role in bio-diversity conservation for South and
South East Asian Region.
The Institute
conducts three principal courses viz., the 3 months’ certificate, the 9th
months’ diploma and 2 years M.Sc. in Wildlife Sciences on a regular basis.
During 9th
Plan about 1646 students/Forest Officers/others were trained by WII in
different courses conducted by it. Its achievements during 9th Plan
and goals set for 10th Plan are given below.
(Rs. in Crores)
|
Programme |
IXth Plan
Outlay |
Expdt. |
Physical Target |
Physical achievement |
X Plan Outlay |
Goal set for X Plan |
Achievement upto date |
|
WII |
25
Cr. |
25
Cr. |
- |
- |
45
Cr. |
56 |
- |
|
M.Sc. Courses in Wildlife
Science |
- |
- |
30 |
30 |
- |
30 |
20 |
|
PG Diploma in Wildlife
Management |
- |
- |
150 |
150 |
- |
150 |
66 |
|
Certificate Course in Wildlife
Management |
- |
- |
150 |
116 |
- |
150 |
43 |
|
Research Projects |
- |
- |
40 |
40 |
- |
80 |
80 |
21. PROJECT TIGER (PT)
The Directorate
Project Tiger deals with the funding to State Governments having Tiger Reserves
Areas under the Centrally Sponsored Scheme viz. Project Tiger, which during the
Xth Plan is an
earlier CSSs viz. umbrella scheme incorporating components of the
‘Eco-Development around National Parks and Sanctuaries including Tiger
Reserves’ and ‘Beneficiary Oriented Tribal Development’. The World bank aided
India Eco-Development Project now being implemented in 6 PAs on pilot basis, is
also coordinated and monitored by the Project Tiger Division, including funding
to the concerned State Governments. Its achievements during 9th Plan
and goals set for 10th Plan are given below.
(Rs. in Crores)
|
Programme |
9th Plan Outlay |
Expenditure |
Physical
Targets |
Achievement |
10th Plan Outlay |
Expdt. |
Physical
Targets |
|
PROJECT TIGER |
Rs. 75.00 Crores |
Rs. 80.86 Crores (including Rs. 6.76 crores for NE states) |
The target was to continue to providie Central
Assistance to the Tiger Reserves as per the Scheme approved, subject to the
availability of budgetary provisions. During the 9th Plan period,
it was also proposed to increase the area to 40,000 sq.km by creating 6 more
Tiger Reserves. Additional activities, namely sanction of Project Allowance
to Project Tiger Staff in the field, continuous monitoring of tiger
population outside Tiger Reserves, deployment of Strike Force in
selected Tiger Reserves and emphasis
on relocation of tribal families. |
Central Assistance has been released for the
various approved items to the Tiger Reserves based on the Annual Plan of
Operations submitted by the State Governments containing the physical targets. The area under Project Tiger scheme amounts 37,761
sq. km., which includes 4 new Tiger Reserves created during the IXth Plan.
Project allowance has been sanctioned to the Project Tiger field staff in the
field. Central Assistance has also been sanctioned for deployment of strike
Force, and for continuous monitoring of tiger population outside Tiger
Reserves. |
Rs. 150.00 crores |
Rs. 67.35 Crores [including Rs. 6.11 crores for NE states (till 31.10.04) |
To assist Tiger Reserves for conservation and protection of tigers,
habitat improvement, forest protection, construction of staff quarters,
office building, wireless network, etc. |
2.
C.S.
ECO-DEVELOPMENT SCHEME
(Around National Parks and
Sanctuaries including Tiger Reserves)
|
Programme |
9th Plan Outlay |
Expdt. |
Physical
Targets |
Achieve-ment |
10th Plan Outlay |
Expdt. |
Physical
Targets |
Achieve-ment |
|
WILDLIFE Eco-development
Around National Parks and Sanctuaries including Tiger Reserves -(General Component) |
Rs. 40.00 Crores |
Rs. 51.45 cores |
The target area of the Scheme includes all the 586
National Parks/WLS in the country. 100% Central Assistance is to be provided
based on the APOs containing physical targets furnished by the State
Governments. Target was to cover at least 80 National Parks/ WLS excluding
the seven location where IEP (externally aided project) is being implemented. |
On an average about 100 National Park/ WLS have
been provided with Central Assistance for approved items of the scheme. |
Merged with Project Tiger Scheme during X Five
Year Plan |
|||
3. C.S. BENEFICIARY ORIENTED SCHEME FOR TRIBAL DEVELOPMENT
|
Programme |
9th Plan Outlay |
Expdt. |
Physical
Targets |
Achieve-ment |
10th Plan Outlay |
Expdt. |
Physical
Targets |
Achievement |
|
Forest Conservation Dev. & Regeneration
(iv) Beneficiary Oriented Scheme For Tribal Development |
Rs. 19.00 Crores |
Rs. 14.39
crore |
To release Central Assistance as per
the approved norms on the basis of proposals received from the States. The scheme is implemented
by the various State Governments concerned. |
2157 families has been relocated from
7 Protected Areas / 4 States. |
Merged with Project Tiger Scheme during X Five Year Plan |
|||
22.
INDIA ECO-DEVELOPMENT
PROJECT
|
Programme |
9th Plan Outlay |
Expdt. |
Physical Target & Achievement |
10th Plan Outlay |
Expdt. |
Physical Target & Achievement |
|
India Eco-development
Project |
156.92 Crores |
156.92 Crores |
i) Project preparation facilities fund(1995-96)for
which a loan of US $ 2 millions was provided by I.D.A. |
73.00 Crores . |
61.14 Crores |
i) Project preparation facilities fund(1995-96)for
which a loan of US $ 2 millions was provided by I.D.A. |
|
ii) The Project Agreements were signed on 30.09.96
and Project became effective from 27.12.96.CCEA approved the Project on
14-10-97. Total project cost is Rs. 288.80 crores which has been revised to
Rs. 229.00 crores (MTR) and Rs. 249.29 crores after MTR. |
ii) The Project Agreements
were signed on 30.09.96 and Project became effective from 27.12.96.CCEA
approved the Project on 14-10-97. Total project cost is Rs. 288.80 crores
which has been revised to Rs. 229.00 crores (MTR) and Rs. 249.29 crores after
MTR. |
|||||
|
iii)The
Project was being implemented by seven
States, (currently by six states) with a view to achieve the following
targets:- |
iii)The
Project was being implemented by seven
States, (currently by six states) with a view to achieve the following
targets:- |
|||||
|
a.
Improved P.A. Management |
a.
Improved P.A. Management |
|||||
|
b.
Village Eco-development |
b.
Village Eco-development |
|||||
|
c. Environmental Education and Awareness Campaigns. |
c. Environmental Education and Awareness Campaigns. |
|||||
|
d.
Improved impact Monitoring and Research |
d.
Improved impact Monitoring and Research |
|||||
|
e.
Preparation of future bio- diversity |
e.
Preparation of future bio- diversity |
23. PROJECT ELEPHANT
Project Elephant was launched in February 1992 to assist States having free ranging populations of wild elephants to ensure long term survival of identified viable populations of elephants as their natural habitats. States are being given financial as well as technical and scientific assistance in achieving the objectives of the Project. The Project is being implemented in 12 States, namely Andhra Pradesh, Arunachal Pradesh, Assam, Jharkhand, Karnataka, Kerala, Meghalaya, Nagaland, Orissa, Tamil Nadu, Uttaranchal and West Bengal. These are being provided with 100% assistance under the centrally Sponsored Scheme ‘Project Elephant’.
The achievement during the
IXth Plan and goals set for the X Plan
are as under:-
(Rs. in crores)
|
Programme |
9th Plan outlay |
Expdt. |
Physical target |
Physical achievements |
Xth Plan Outlay |
Goals set for Xth Plan |
Achieve-ment (till 15.11.04) |
|
Project Elephant |
35.00 |
30.50 |
As proposed by States in A.P.O |
Funds released to 13 States. |
60.00 |
60.00 |
31.32 |
24. CENTRAL ZOO AUTHORITY (CZA)
The Central Zoo
Authority was constituted by the Central Government in 1992
under the provisions of Section-38A of
the Wildlife (Protection) Act, 1972 as
a statutory body to exercise the powers conferred on, and to perform the
functions assigned to it under the
Act.
( Rs. in crores)
|
Programme |
IXth Plan Outlay |
Expdt. |
Physical
Target |
Physical Achieve-ments |
X Plan
Outlay |
Goals set
for X Plan |
|
Central Zoo Authority |
43.01 |
43.46 |
.* |
** |
75.00 |
*** |
*Physical Targets for IX Plan:-
To
fulfill the objectives assigned to the Authority as spelt out in Section 38(c) of the Wildlife (Protection) Act which
includes among others, laying down standards for housing, upkeep and veterinary
care of the animals kept in Zoos and to provide the technical and other support
to the zoos to help them to attain these standards with the objective of improving
the quality of life of Zoo animals and complement the on going national
effort of conservation of Wildlife.
**Physical
Achievement for IX Plan
1.
During
the IX Plan period, 293 zoos were evaluated for grant of recognition. 178
zoos were granted recognition and 115
zoos were refused recognition.
2.
42
zoos have been provided financial assistance to the tune of Rs.27.90
crores during the IX Plan period.
3.
Five
rescue facilities for housing 300 circus animals were created in five designated zoos
at the cost of Rs.7.84
crores. Grant of Rs. 1.20 crores were also provided towards feed and upkeep of
circus animals kept in these rescue centres.
4.
Various
training courses and workshops were organized for capacity building of the zoo personnel and zoo management. During the Plan Period total 731 Zoo
personnel have been trained including
11 officials sent for training abroad.
5.
Project
of Establishment of Laboratory for
Endanger Species ( LaCONES) under CCMB
were taken up. During the IX Plan period total grant of Rs. 1.20 crores
provided to CCMB for this project.
6.
Five
veterinary institutes were selected
region-wise for upgradation of their clinical and diagnostic facilities for better animal health care. Funds Rs. 33.65
lakhs have been released to two Institutes during the plan
period.
*** GOALS SET FOR THE XTH
PLAN
1. To
achieve the standards and norms
set-forth under the Recognition of Zoo
Rules, 1992.
2. Provide the
Grants to Zoos for improvement of animal housing, upkeep and veterinary
care facility on upgraded funding
pattern on 100% basis. The remaining activities to be funded on
50:50 basis.
3. Creation of scientific cell within the
Central Zoo Authority with a view to provide technical assistance in various
aspects of zoo management to the zoos in the country
4.
Capacity building
of the zoos
personnel to be continued by organizing various training
programmes, workshops and seminars.
5.
Research
Activities in critical areas particularly for preservation of germ- plasm of endangered species and
provide financial assistance for establishment
of a laboratory for conservation of wild animals in CCMB, Hyderabad
will be continued.
6.
Create further Rescue Facility in
the off display area of the to rehabilitate
lions and tigers expected to be
surrendered from circuses and from the zoos
refused recognition by the
Central Zoo Authority.
7.
To continue meeting
the cost of feed and upkeep of rescued
animals kept in Rescue Centres
25. NATIONAL ZOOLOGICAL PARK, NEW
DELHI
On the
recommendation of the Indian Board of Wildlife, the Government of India set up
the National Zoological Park in New Delhi in October, 1955, to conserve and
breed rare and endangered animals, to conduct research on their behaviour,
reproduction and nutrition and to educate the people about preservation of
wildlife. It also provides assistance and guidance to the other zoos in the
country.
(Rs. in crores)
|
S.No. |
Programme |
Ixth Plan
Outlay |
Expdt. |
Physical
Achievements |
|
1. |
Development
Activity at National Zoological Park. |
3.20 |
2.19 |
During IX Plan Construction of Chimpanzee , African Elephant Enclosure, Improvement of existing enclosures as per Master Plan, Construction & Extension of White Tiger Enclosure, Extension of Royal Bengal Tiger encl. besides major renovation ad modifications to suit the requirements of certain other animals have been taken up. Animal exchange with Indian and foreign zoos were
made. Mate for White Peacock, Lady
Pheasant, Cassowary were procured.
Many competitions were organized for school children, Physically
handicapped children, painting Competition
during the Wildlife Week Celebration.
Van Mahaotsava was also organized with great enthusiasm, Planting of
sapling were carried out, Leopard cat, jungle fowl, partridge, chinkara, wolf
were received in exchange. |
II-B
(Rs. in crores)
|
S.N |
Name of the
Activity |
Xth Plan
Outlay |
Goal Set for
the X Plan |
Physical
Achievements |
|
1. |
Development
Activity at National Zoological Park. |
7.0 crore |
i)
Various Educational Programmes
on wildlife conservation i.e celebration of wildlife week & van mahoutsav ii) Conduction of various
seminars & Teacher Oriented
Programme iii) Publication of Guide Map, Annual
Report, Stickers etc. iv ) Preparation of Signage. v)
Maintaining the Health & Hygienic Environment for Zoo Animals. vi) Exchange of various animals with
India & Foreign Zoo for Plan Breeding
Project. vii)Upkeep of animals and their enclosure. viii) Providing facilities to the
visiting public. **For the Capital construction
work executed through CCU / CPWD, the
funds will be provided by Central Zoo Authority. However request is made to
PC Division , MOEF , to provide the fund , under PLAN CAPITAL on the same
line as done in case of PLAN REVENUE |
Target set will be achieved in due
course of time |
26. PROTECTION OF WILDLIFE OUTSIDE
PROTECTED AREAS
The
new scheme of Protection of Wildlife Outside Protected Areas has been proposed
under X Plan. The most important part of this scheme is protection of wildlife
outside protected areas. Protected areas cover about only 4.5% of the total
geographical area of the country. Considering about 23% total geographical area
under forest about 19.5% forest area is outside protected area system. In
addition there is considerable extent of non-forest wildlife habitat also which
is not forming a part of protected area systems or forests. These areas are the
abode of a large number of wildlife, both flora and fauna. Unfortunately no
appropriate mechanism for wildlife conservation and protection is in force at
present in such areas. There is hardly any infrastructure, special staff or budget available under the
control of territorial forest staff for wildlife conservation. Consequently
conservation of wildlife in such areas continues to be neglected.
This
scheme will be introduced in the selected areas in the beginning which are in
the high diversity or high risk categories. It also envisages to establish 80
mobile patrolling units in these areas . The total outlay recommended for the
Tenth Plan is Rs 60.00 crores.
( Rs. in crores)
|
Programme |
9th Plan outlay |
Expdt. |
Physical target |
Physical achievements |
Xth Plan Outlay |
Goals set for IXth Plan |
Achievement till 31.10.2002 |
|
Protection of wildlife outside protected areas |
NIL |
NIL |
NIL |
NIL |
60.00 |
60.00 |
NIL |
27. ANIMAL WELFARE DIVISION
The mandate of Animal
Welfare Division is to prevent the infliction of unnecessary pain or
suffering on animals. The Schemes being implemented by the Animal Welfare Division are
as under:-
-
Scheme
for Shelter Houses for Looking After the Animals.
-
Scheme
for Animal Birth Control and Immunization of Stray Dogs.
-
Scheme
for Provision of Ambulance Services to Animals in Distress.
-
Scheme
for Relief to Animals during Natural Calamities and Unforeseen Circumstances.
-
Scheme
for Scholarships to Students for Studies Abroad in Animal Welfare Courses.
-
National
Institute of Animal Welfare (NIAW) – Statutory Body under Section 4 of the PCA
Act.
-
Animal
Welfare Board of India (AWBI).
-
Committee
for Purpose of Control & Supervision of Experiments on Animals (CPCSEA).
The achievements made under
various Schemes during the IXth Plan and goals set for the X th Plan are as
under:
(Rs. in Crores)
|
Programme |
IXth Plan Outlay |
Expdt. |
Physical Target |
Physical Achieve-ments |
Xth Plan Outlay |
Goals set for Xth Plan |
Achievements (During 2003-04) |
|
Ambulances |
8.33 |
5.87 |
145 |
178 |
7.57 |
168 |
13
Proposals have been considered |
|
Shelter |
15.00 |
19.02 |
104 |
193 |
77.36 |
216** 60*** 9**** 340***** 50****** |
36
Proposals have been considered |
|
ABC |
2.55 |
4.13 |
91* |
114* |
21.16 |
5,000 (Monkeys) 4,23,000 (Dogs) |
37,977(Dogs)
covered under the schemes |
|
Natural Calamity |
2.25 |
1.04 |
- |
- |
5.28 |
As per requirement |
3
States have been given grant |
|
AWBI |
21.25(P) 1.96(NP) |
18.81(P) 1.96(NP) |
- |
- |
31.30(P) 6.50(NP) |
- |
Grant
to 842 organizations |
|
Scholarships |
1.20 |
0.09 |
- |
- |
3.10 |
- |
- |
|
CPCSEA |
1.09 |
0.65 |
- |
- |
2.80 |
- |
Zonal
Workshops – Nominee
Workshops – Inspection
of Animal Houses – |
|
NIAW |
8.22 |
2.74 |
- |
- |
12.43 |
- |
The
construction work is more or less complete. |
* Number
of Organizations
** Shelter
Houses
*** Number
of Animal Houses
**** Number
of Rescue Centres
***** Activation
of SAWBs/SPCAs
****** Workshops
28. NATIONAL AFFORESTATION & ECO‑DEVELOPMENT
BOARD
The National Afforestation & Eco‑Development Board (NAEB) was set up in August 1992 for promoting afforestation, tree planting, ecological restoration and eco development activities in the country. Special attention is being given to the regeneration of degraded forest areas and lands adjoining forest areas, national parks, sanctuaries and other protected areas as well as the ecologically fragile areas like the Western Himalayas, Aravallis, Western Ghats, etc. The detailed role & functions of the NAEB are given as follows:
(a) Evolve mechanisms for ecological restoration of degraded forest areas and adjoining lands through systematic planning and implementation, in a cost effective manner;
(b) Restore through natural regeneration or appropriate intervention the forest cover in the country for ecological security and to meet the fuelwood, fodder and other needs of the rural communities;
(c) Restore fuelwood, fodder, timber and other forest produce on the degraded forest and adjoining lands in order to meet the demands for these items;
(d) Sponsor research and extension of research findings to disseminate new and proper technologies for the regeneration and development of degraded forest areas and adjoining lands;
(e) Create general awareness and help foster a people's movement for promoting afforestation and eco development with the assistance of voluntary agencies, non‑government organisations, Panchayati Raj institutions and others and promote participatory and sustainable management of degraded forest areas and adjoining lands;
(f) Coordinate and monitor the Action Plans for tree planting, ecological restoration and eco development; and
(g) Undertake all other measures necessary for promoting afforestation, tree planting, ecological restoration and eco development activities in the country.
20 ‑
POINT PROGRAMME
NAEB is the Nodal
Agency for fixing targets and monitoring achievements of afforestation
activities under the 20‑ Point Programme. Targets are fixed separately in terms of seedling distribution
for planting on private lands and plantation on public lands including forest
lands.
The targets and achievements under point No.16 of the 20 Point Programme
are as follows:‑
(Area in Lakh Ha.)
(Seedlings
in Crores)
|
|
9th
Plan |
2002-03 |
2003-04 |
2004-05 |
||||
|
|
Targets |
Achv |
Targets |
Achv |
Targets |
Achv |
Target |
Achv |
|
Seedling
distribution (for planting in private
lands) |
588.75 |
503.63 |
92.50 |
82.00 |
86.22 |
76.11 |
129.83 |
59.84* |
|
Area
(Public lands including forest lands |
62.59 |
55.58 |
10.72 |
7.25 |
10.71 |
8.43 |
14.18 |
7.86* |
(*Upto September, 2004)
Scheme wise Progress
The
NAEB was responsible for implementing 5 Central Sector/Centrally Sponsored
Schemes during the IX Plan period. The progress of these Schemes during the 9th
Plan has been as follows:
|
Sl. No. |
Scheme/Activity
|
IX Plan Outlay |
Expenditure |
Physical Targets (in ha.) |
Achievements (in ha.) |
|
1. |
Integrated
Afforestation and Eco-Development Projects Scheme. |
247.00 |
212.48 |
225752 |
179067 |
|
2. |
Area
Oriented Fuelwood & Fodder Projects Scheme |
135.00 |
132.08 |
330458 |
277500 |
|
3. |
Non-Timber Forests
Produce (including Medicinal Plants) Scheme |
80.50 |
74.41 |
91921 |
73378 |
|
4. |
Seed
Development Scheme |
6.00 |
6.20 |
N.A |
25
states |
|
5. |
Grants-in-Aid
Scheme (for Voluntary Agencies) |
9.50 |
13.10 |
240 |
200 |
Note:- The achievements were low because of slow
release of funds to the implementing agencies by the State Governments.
II.B. Outlay
for the Xth Plan
|
Programme |
Xth
Plan Outlay In
Rs. Crore* |
Physical
targets for Xth Plan (ha.) |
Cumulative
Achievement in the X Plan 2002-05 upto 30.11.04 |
|
1 |
2 |
3 |
4 |
|
1.
National Afforestation & Eco-development Board (NAEB) |
80.00 |
|
|
|
(a). Grants-in-Aid to voluntary Agencies/
Greening India |
262 projects, 13,125ha |
297projects 14,744 ha.** |
|
|
(b).
Monitoring & Evaluation |
250 FDAs to be Monitored |
154 FDAs evaluated |
|
|
(c).
Communication |
IPVM awards |
IPVM
Awards for 2001 given, and for 2002& 2003 are under processed. |
|
|
(d). Support to Reg. Centres |
7 Regional Centres |
7 Regional Centres |
|
|
(e). Professional & Special Services |
10 Special Studies |
6 Special Studies |
|
|
(f). Board Secretariat |
- |
- |
|
|
2. National Afforestation
Programme |
1115.00 |
5,00,000 ha. |
8,12,537ha** |
|
3. National Action Programme to Combat Desertification |
30.00 |
- |
- |
|
4. Eco-Development Forces |
75.00 |
Support to 4 Eco-Task Force battalions |
Continuing Scheme |
|
Grand Total |
1300.00 |
|
|
*
Proposed revision
** Area
of land for treatment under projects sanctioned up to 30.11.2004.
29. NATIONAL RIVER
CONSERVATION DIRECTORATE
The main objective of the
river action plans is to improve the water quality of the rivers to acceptable
standards by preventing pollution load reaching the river by undertaking works
like (i) interception & diversion
works to capture the raw sewage flowing into the river through open drains and
divert them for treatment, (ii) sewage treatment plant for treating the
diverted sewage, (iii) low cost sanitation works to prevent open defecation on
river banks, (iv) electric and improved wood based crematoria to conserve the
use of wood and help in ensuring proper cremation of bodies brought to the
burning ghat, (v) river front development works such as improvement of bathing
ghats and (vi) other minor
miscellaneous works such as
afforestation.
The achievement during the
IXth Plan and goals set for the X Plan
are as under:-
(Rs. in crores)
|
No. |
Programme |
IX Plan Outlay |
Expdt. |
Physical target (scheme) |
Physical Achievement |
X Plan Outlay |
Goals set for X Plan |
Achievements |
|
1. 2. 3. 4. |
GAP-I GAP-II NRCP NLCP |
8.28 264.89 505.12 18.25 |
5.79 473.38
292.89 11.40 |
11 347 226 7 |
8 schemes completed 210 schemes completed 75 schemes completed -
Work
Initiated |
- - 1858 265 |
The goal of the NRCP is to reduce pollution in the major rivers by executing pollution abatement measures such as interception, diversion and treatment of domestic sewage undertaking river front, Low Cost Sanitation works etc. The goal of NLCP is conservation of identified lakes. |
The following no. of schemes have been completed
under the X Plan so far: GAP-I
1 NRCP
170 NLCP 3 |
|
TOTAL
: |
796.54 |
783.47 |
591 |
|
2123 |
|
|
|
ACHIEVEMENTS IN THE
IX PLAN
q Ganga Action Plan Phase-I
It was the first river
Action Plan taken-up in 1985 for the pollution abatement for river Ganga only.
Out of 11 remaining ongoing schemes, 8 schemes were completed by the end of the
9th plan . A sewage treatment capacity of 282 mld was created under the programme . An amount of about Rs.
5.79 crore was spent on the programme in the IX Plan.
q
National
River Conservation Plan
q
Ganga
Action Plan Phase-II
Phase-II of the Ganga Action
Plan was launched and approved in stages between 1993 & 1996 for
implementation. Gap-II was merged with NRCP in December 1996. The total project
cost of GAP Phase-II is Rs. 1498.86 crore which includes the following
components;
Ř Yamuna Action Plan: Out of the project outlay of Rs.732.05 crore and amount of Rs.384.12 crore had been released by the end
of the 9th plan. 187 schemes were sanctioned and 144 were completed
this includes YAP-extended phase which was approved during the IX Plan..
Ř Gomati Action Plan:- Out of the project outlay
of Rs.61.10 crore an amount of Rs.14.57 crore had been released. 26 schemes
were sanctioned and 15 were completed.
Ř Damodar Action Plan:- Out of the project outlay
of Rs.23.58 crore an amount of Rs.0.09
crore had been released and 10 schemes were sanctioned
Ř
Ganga Action Plan Phase-II (Main Stem and Supreme Court towns) :- Out of the project outlay
of Rs.682.11 crore an amount of Rs.77.82 crore had been released. 133 schemes
were sanctioned and 13 were completed.
ECOLOGY &
ENVIRONMENT
30. BOTANICAL
SURVEY OF INDIA (BSI)
Botanical Survey
of India was established in 1890 with the basic objectives of carrying out
floristic surveys. It was revived and
re-organized in 1954. During successive
Plan periods its functions have been gradually expanded. The objectives and perspectives of BSI were
thoroughly reviewed in 2002 by the Sub-committee constituted by Programme
Advisory Programme Committee of BSI and ZSI.
The achievement
during the IXth Plan and goals set for
the X Plan are as under:-
(Rs. in Crores)
|
Programme |
IXth Plan Outlay |
Expdt. |
Physical Target |
Physical Achievement |
Xth Plan Outlay |
Goal Set for Xth Plan |
|
BOTANICAL
SURVEY OF INDIA (Survey, Inventorisation &
Conservation of floristic diversity) |
32.0000 |
18.4192 |
|
|
33.4600 |
|
|
1.
Survey of Plant resources. No. of Exploration |
|
|
650 |
360 |
|
|
|
2.
Collection of species |
|
|
80,000 Field nos. |
ca. 60,000 Field
nos. |
|
|
|
3.
Preservation of Specimens |
|
|
60,000 specimens |
ca. 50,000 specimens |
|
|
|
4.
Coverage of specimens under threat in publication of Red
data book |
|
|
ca. 750 |
Vol. IV & V in manuscript form.
200 sheets |
|
|
|
5.
Publication |
|
|
250 (Books/ Journals-50; Papers and Articles-200) |
265 (Books/ Journals-64; Papers and Articles-201) |
|
|
|
1.
Field Exploration Tours |
|
|
|
|
|
400 |
|
2.
Herbarium Consultation/ Library Consultation/ Study Tour |
|
|
|
|
|
100 |
|
3.
Documentation of Phytodiversity |
|
|
|
|
|
|
|
i.
Vascular Plants a.
National Flora (Flora of India) b. State Flora c.
District Flora |
|
|
|
|
|
7,500 species |
|
d. Biosphere
Reserve |
|
|
|
|
|
03 nos. |
|
e.
National Park |
|
|
|
|
|
03 nos. |
|
f.
Wild Life Sanctuary |
|
|
|
|
|
05 nos. |
|
g. Fragile
Ecosystem (including wetland) |
|
|
|
|
|
10 nos. |
|
ii.
Lower Group Plants (Algae, Fungi, Lichen, Bryophytes) |
|
|
|
|
|
500 species |
|
iii.
Collection of Specimens |
|
|
|
|
|
ca. 60,000 |
|
iv.
Preservation of specimens |
|
|
|
|
|
ca. 40,000 |
|
v.
Specimens identified |
|
|
|
|
|
ca. 15,000 |
|
4.
Ex-situ conservation
of endangered, endemic, economic & ornamental plants |
|
|
|
|
|
ca. 600 |
|
5.
Documentation of Traditional knowledge of plants |
|
|
|
|
|
ca. 500 |
|
6.
Publications
a. Books
b. Journals c. Research Papers/ Articles |
|
|
|
|
|
50 15 200 |
31. ZOOLOGICAL
SURVEY OF INDIA (ZSI)
Zoological Survey of India was
established primarily to explore and inventories the faunal diversity of the
country and to collect and document baseline data in respect of taxonomy,
geographical distribution, bio-ecology of various animal groups. The primary
objectives are 1. Exploration and
survey of Fauna resources, 2. Taxonomic
studies, 3. Statues survey of Endangered species, 4. Status survey of
conservation areas, 5. Publication of results through departmental books and
journals 6. Publication of Fauna of India series, 7. Maintenance and
development of National zoological collections. The achievements of ZSI during the 9th Plan and the
goals set for the 10th Plans are as follows:
(Rs. in Crores)
|
Programme |
IX Plan Outlay |
Expenditure |
|
|
Survey
( ZSI ) |
32.00** |
34.76** |
|
|
Physical Target |
Physical Achievement
|
||
|
Exploration
and survey of State Fauna (District-wise) |
Ongoing programme of the department. 90 surveys were undertaken and about 40 districts were covered. Documentation of faunal inventory of these states
is in progress and will be completed during Tenth five-year Plan period. |
||
|
Studies on some selected eco-systems of Indian
region |
Selected ecosystems have been taken up to explore
the bio-diversity, as given below :
All are Ongoing programme of the department. |
||
|
Himalayan
Eco-system |
36 surveys have been conducted in the states of
Himachal Pradesh, Sikkim, Arunachal Pradesh, Jammu & Kashmir (Ladakh) The faunal bio-diversity of the state of Sikkim
has been completed and is under print. The survey of other state will
continue |
||
|
Desert
Ecosystem |
14 Surveys in the desert areas of the states of
Rajasthan and Gujarat. The study on the fauna of Gujarat desert has been
partly completed, published and the study of Rajasthan is in progress. |
||
|
Tropical
Rain Forest Eco-system |
22 Surveys in Tropical rain forest ecosystems of
the states of Arunachal Pradesh, Tripura, Manipur, Nagaland, Mizoram, Kerala
and Goa have been take up. Studies on Tripura have been completed and the
document is under print. Studies on
other states are in progress, and will be completed during X plan period. |
||
|
Estuarine
Eco-system |
16 Surveys in Two Estuarine Ecosystems viz.,
Godavari, Krishna, Nagavali estuaries and Sundarban mangroves were
extensively explored. The document on Godavari estuary has been published,
Krishna is in press |
||
Freshwater Eco-system
|
48 surveys have been undertaken. The studies on
Kolleru, Sukhna, Loktak, Ujni have been completed and are under print. Survey and exploration of other freshwater
bodies will continue during Tenth five-year plan period. |
||
Marine Eco-system
|
36 surveys have been undertaken in Andaman &
Nicobar Is., East Coast, Palk Bay, Gulf Katchh and Digha coasts. Exploration
will continue during the Tenth five-year plan period and results will be published |
||
|
Survey of Protected Areas |
43 surveys of various important conservation areas
have been undertaken. The studies on
Renuka sanctuary, Eraviculum N.P., Melghat Tiger Reserve, Valmiki Tiger
Reserve have been completed and published.
The survey of the remaining areas will continue during Tenth five-year
plan period, as they are ongoing programmes of the department. |
||
|
Taxonomic studies of
Faunal Components |
On Going Programme and hence continued. Final
document on Simlipal, Palamau and Manas Tiger Reserves and Ujni wetland have
been completed. Taxonomic studies on
the faunal component of Tripura, Sikkim, Manipur and Mizoram are in the final
stages of publication. |
||
|
Status survey of
Endangered species |
4 Species undertaken and 2 document on Chinkara & Desert Cat in Rajasthan has been published. During the Xth Five Year Plan period the Status survey of more endangered
species will be taken up. |
||
|
Red Data Book |
Red Data Book on invertebrate fauna w.s.r. to
Butterflies is being processed. A
revised version of the Red Data Book based on the new IUCN guidelines is
under way and will be completed in Tenth Five Year Plan. |
||
|
Fauna of India |
7
Fauna Volumes Published & 3 in Printing |
||
|
Computerisation |
1,50,000 data on registered general collection
have been computerized. On going
programme, continued in the X th Plan also. |
||
|
Documentation and
Publication |
22 Books on Faunal Diversity & Departmental
Books published & 8 books are under Printing. |
||
|
Training and
Extension programmes |
12 No. of
Training Courses and extension programmes in different fields of
Zoology conducted. |
||
|
X Plan Outlay |
Goals set for X Plan |
||
|
Rs. 45.00** |
|
||
|
Exploration
and survey of State Fauna (District-wise) |
Selected district survey in the
following states will be taken up during the X Plan period viz., Arunachal Pradesh, Andhra
Pradesh, Bihar, Madhya Pradesh, Rajasthan, Karnataka, Haryana, U P.,
Uttaranchal, Punjab, Kerala, Manipur, Nagaland, Tamilnadu |
||
|
Studies on some selected eco-systems of Indian
region |
As given below : |
||
|
Himalayan
Eco-system |
Ladakh, Arunachal Pradesh, Uttar
Pradesh & Uttaranchal |
||
|
Desert
Ecosystem |
Rajasthan & Gujarat will be
completed |
||
|
Tropical
Rain Forest Eco-system |
Kerala, Arunachal Pradesh & Goa will be completed |
||
|
Estuarine
Eco-system |
Estuaries of Orissa,
Andhra Pradesh, Tamilnadu & Kerala |
||
Freshwater Eco-system
|
Selected Wetlands in the states
of Himachal Pradesh, Uttaranchal,
Rajasthan, Tamilnadu, West Bengal, Andhra Pradesh, Maharashtra and Madhya
Pradesh will be taken up |
||
Marine Eco-system
|
Coral reef ecosystem in Gulf of
Mannar, Andaman & Nicobar Islands, Gulf of Katchch. |
||
|
Survey of Protected Areas |
Another 10 % of the Protected areas, in addition to 20 % already under
investigation will be covered during the Tenth five-year Plan period. |
||
|
Taxonomic studies of
Faunal Components |
Taxonomic studies of the faunal
component from the State Survey, Ecosystem Survey will be taken up as action
Plan of the department |
||
|
Status survey of
Endangered species |
5 Species of Endangered Animals will be completed during the X
plan period |
||
|
Red Data Book |
Invertebrates and Revised edition of
Vertebrates as per IUCN Guideline will be completeed |
||
|
Fauna of India |
All the volumes submitted by the
scientists will be published |
||
|
Computerisation |
Computerisation of Head Quareters
& Regional Stations will be completed and linked to the Network |
||
|
Documentation and
Publication |
30 Books on Faunal Diversity & Departmental
Books will published |
||
|
Training and
Extension programmes |
10 No. of
Training Courses and extension programmes in different fields of
Zoology |
||
32. NATIONAL MUSEUM
OF NATURAL HISTORY (NMNH)
The museum owes its genesis to the Late Prime
Minister Smt. Indira Gandhi, who while considering the new projects to be
initiated in 1972 -- the 25th anniversary of India's Independence - decided
that the country needs a museum of Natural History to depict its flora, fauna
and mineral wealth to provide an out of school facility for education of
children and to promote environmental awareness among the masses. The museum
opened its doors to the public in the FICCI building on Barakhamba Road on 5th
June 1978 , with a gallery on Natural History, coinciding symbolically with the
World Environment Day to further emphasize its role safeguarding the
environment.
Within the last 23 years, it added three
galleries, a Discovery and Activity Room for pre-school kids, and conducted a
variety of educational programmes and brought out popular literature. In
addition the museum started its two regional centers at Mysore and Bhopal with
a third one shortly coming up at Bhubneshwer.
The
achievement during the IXth Plan and
goals set for the X Plan are as under:-
(Rs. in Crores)
|
Programme |
9th Plan Outlay |
Expdt. |
Physical Targets/ Achievements |
Xth Plan Outlay |
Goals/Achievements during Tenth Plan |
|
National Museum of Natural
History, New Delhi. |
19.00 |
17.96 |
* |
40.00 |
** |
* A large number of educational activities including
summer programmes, national environment awareness campaign, teacher orientation
workshops, publication of popular literature on environment, special programmes
for physically disabled and mentally-retarded etc. were undertaken by the NMNH
and its regional centers. Development of plan and initiation of exhibit
development for the 2nd Phase galleries in the Regional Museum of
Natural History, Mysore were taken up. Updating and renovation of premises and
exhibit galleries were undertaken at the NMNH. Phase I construction at the
Regional Museum of Natural History at Bhubaneswar was completed by the CCU.
Phase-II construction activities both at the RMNH, Bhopal and RMNH, Bhubaneswar
were undertaken. Plans for 2nd Phase Galleries, exhibit development
and Discovery Center at RMNH, Bhopal were undertaken. Renovation and
reconstruction of Mobile Museum was undertaken. Development of plans for
Galleries and other features like Discovery Room, Bio-Science computer Room
etc., of phase I of RMNH, Bhubaneswar were initiated.
**Acquisition of land and construction of building
of NMNH. Renovation and updating of existing NMNH Galleries. Completion of 2nd
Phase of Galleries of RMNH, Mysore, Bhopal and Ist Phase at Bhubaneswar. Land
is yet to be allotted by the Ministry of Urban Development. Works were
initiated for completion of 2nd Phase of Galleries and other
infrastructures at RMNH, Mysore and Bhopal and Ist Phase of Galleries at
Bhubaneswar were undertaken and completed during the year 2004-2005.
33. ENVIRONMENTAL EDUCATION,
AWARENESS & TRAINING
The achievement during the
IXth Plan and goals set for the X Plan
are as under:-
(Rs. in Crores)
|
S.No. |
Name
of the Activity |
9th
Plan Outlay |
Expenditure |
Physical
Targets/Achievements |
|
1. |
Env.
Education & Training |
23.00 |
24.12 |
No Quantitative targets were set for the schemes
as such. However, the targets set for
various programmes under the scheme have been successfully achieved. ____________________ * No Quantitative targets were set for the schemes
as such. However, the targets set for
various programmes under the scheme have been successfully achieved. |
|
2. |
Seminars/Symposia/
Workshops |
1.50 |
1.53 |
|
|
3. |
Grants in aid
to professional societies & institutions and Publication of resource
material. |
0.50 |
0.50 |
*Grants in aid to
professional societies and institutions for developing activities and projects
in the field of environment were provided. Guidelines and performa for
submission of projects were finalised.
(Rs. in crores)
|
Name
of the Activity |
10th
Plan Outlay |
Goal
set for 10th Plan |
|
Env. Education , Training and Awareness |
125.00 |
It is not possible to set any
quantitative targets for these schemes.
However, the existing programmes will be continued. |
34.
ENVIRONMENTAL INFORMATION SYSTEM (ENVIS)
Under the Environmental
Information System (ENVIS) Scheme centres known as ENVIS Centres are set up on
different subjects. 25 ENVIS Centres
have been established so far. Under the
Scheme, a quarterly news letter ‘Enviro News’ and Paryavaran abstract an
abstracting Journal are also published.
The achievement
during the IXth Plan and goals set for
the X Plan are as under:-
(Rs. in crores)
|
Programme |
9th Plan outlay |
Expdt. |
Physical Target & Achievement |
10th plan outlay |
Goal set up for 10th Plan and achievement |
|
ENVIS |
7.5 |
7.5 |
* |
14 |
** |
*Physical Target & Achievement
During the 9th Plan 1
new ENVIS Centre on Eco-Tourism was set –up and all the 25 ENVIS Centres were
monitored. The ENVIS network was
gradually developed with the development of the website of each partner network
in order to disseminate information to the users electronically.
Paryavaran Abstract a quarterly journal reporting
Research in the field of Environment in the Indian context was published during
the period.
Annual Report of the Ministry was published by
ENVIS every year during
the plan period.
Enviro News a quarterly
newsletter was also
brought out regularly during the plan period.
** Goal
set up for 10th Plan and achievement
1.
All the 25 ENVIS Centres will be networked under a new ENVIS Home page
2.
96 ENVIS Nodes being setup under the EMCBTAP will also be networked and
linked to the ENVIS homepage.
3.
Paryavaran Abstract, ‘ENVIRONEWS’ Newsletter will be brought out
regularly.
4.
Annual Report of the ministry in every financial year will be
coordinated and published.
5. The website of the Ministry at url: http://www.envfor.nic.in will be
continuously updated and monitored.
35. CENTRES OF EXCELLENCE
Under the Centres of
Excellence Scheme, nine Centres have
been set up by the Ministry so far.
These Centres have been set up in the fields of Environment Education,
Ecology of Western Ghats, Mining Environment, Ornithology and Natural History,
Environmental Management of Degraded Eco System, Conservation and Sustainable
Utilisation of Tropical Plant Diversity and Animals and Environment, and
Environmental Economics. These ten
Centres are:-
(a) Centre for Environment
Education, Ahmedabad.
(b) Centre for Ecological
Sciences, Bangalore.
(c) Centre of Mining
Environment, Dhanbad.
(d) C.P. Ramaswamy Aiyar
Centre for Environment Education, Madras.
(e) Salim Ali Centre of
Ornithology and Natural History, Coimbatore.
(f) Centre for Environmental Management of Degraded
Eco-system, Delhi University.
(g) Tropical Botanical
Garden and Research Institute, Thiruvananthapuram.
(h) Madras School of
Economics, Chennai.
(i) Foundation for Revitalisation of Local Health
Traditions, Bangalore.
The achievement during the
IXth Plan and goals set for the X Plan
are as under:-
(Rs. in Crores)
|
Name of the Scheme |
IXth Plan Outlay |
Expdt. |
Xth Plan Outlay |
Goals set for Xth Plan |
|
CENTRES OF EXCELLENCE |
22.20 |
23.59 |
45.00 |
To strengthen awareness,
research & training in the priority areas of environmental science
through existing ten centres of excellence and to augment infrastructural and
other facilities in these Centres. |
36. NATIONAL NATURAL
RESOURCES OF MANAGEMENT SYSTEMS (NNRMS)
The main objective of the National
Natural Resource Management System (NNRMS) Scheme is to utilise remote sensing
technology with conventional methods of monitoring of natural resources such as
land, water, forests, minerals, oceans for attaining sustainable
development.
The achievement during the
IXth Plan and goals set for the X Plan
are as under:-
(Rs. in crores)
|
Programme |
9th Plan outlay |
Expdt. |
Physical Target & Achievement |
10th plan outlay |
Goal set up for 10th Plan and achievement |
|
NNRMS |
4 |
4 |
* |
5 |
** |
*Physical Target & Achievement
Projects in 23 identified areas
were supported.
** Goal
set up for 10th Plan and achievement
The meeting of the Bio-Resources
Committee (SC-B) set up by the Planning Commission will be periodically
convened to identify the thrust areas and to support the projects under these
areas. The Projects identified under
the NNRMS scheme will be reviewed and monitored.
Supported projects identified under
this scheme will be reviewed and monitored.
The information generated by this project will be disseminated to all
concerned users of the Ministry, Universities and other institutions.
37. ENVIRONMENT IMPACT ASSESSMENT
Environmental
Impact Assessment is one of the well recognized management tools for
incorporating environmental mitigation measures in planning, design and
operation of developmental projects.
Environmental clearance has been made mandatory since January, 1994 in
respect of 30 developmental activities including Industry, Thermal Power,
Mining, River Valley and Infrastructure projects etc. Environmental clearance to developmental projects is accorded as
per the procedure laid down in the Impact Assessment Notification which
inter-alia includes public hearing. The
projects are apprised by Multi-disciplinary Expert Committees and necessary
safeguard measures are stipulated for
minimizing the environmental impacts of development projects. In addition to appraisal of projects,
various studies are undertaken for evolving norms for disposal of effluents,
emissions and health aspects etc. For
evolving integrated coastal zone management approach, a number of studies and
surveys have been planned for demarcation of sensitive areas in coastal
stretches, areas suitable for activities such as tourism and economic zone etc.
Digitization of Coastal Zone Management Plans is also proposed for various
coastal stretches.
The achievement during the
IXth Plan and goals set for the X Plan
are as under:-
(Rs.in Crores)
|
Prog ramme |
9th
Plan Outlay |
Expdt |
Physical Target |
Achieve-ment |
Xth Plan Outlay |
Goals
set for Xth Plan |
Achievement
till 31.3.2004 |
|
Environment
Impact Assess-ment |
7.00 |
8.50 * |
Appraisal of all projects received for
environmental clearance within the mandated period Pending application- Total Application Received -929 Pending -143 Total
-1072 |
Total
No. clearances granted -601 Total No.
applications rejected/closed/ exempted
-395 Grand total
-996 |
13.00 |
1. Continuation of appraisal and grant of environmental clearance of projects . Total pending application
-143 Total application received
till 31.3.2004–698 Likely to be received during 2004-05 & 2005-06
- 1000 G. Total
1841 2. Reengineering of environmental Clearances
process |
1.
Total clearances granted till 31.3.2004 -452 2.
Total rejected/ closed/exempted -141 G.Total - 593 2. Consultants’ report
examined and consultative process started
on the reengineering process |
·
Excess
expenditure incurred by CT Division
38. CLEAN TECHNOLOGY
Integration of environmental
considerations into developmental process with optimal utilization of resources
has been recognized as a key to sustainable development. It has become progressively more clear that
‘end of pipe’ strategies alone cannot resolve complex environmental
problems. They do not eliminate
pollution, but often transfer it from one media to another, require expensive
pollution treatment equipment, discourage technological innovation towards achieving
environmental benefits beyond compliance.
Cleaner productions and cleaner technologies can ensure that there are
no conflicts between growth and environment.
Cleaner production brings economic benefits via increased resource
efficiency, innovation and reduction of pollution control cost.
The
programme on development and promotion of cleaner technologies was initiated in 1994 with the following
objectives:-
(i)
Formulation
of sustainable Development Strategies.
(ii)
Development
& promotion of Cleaner Technologies.
(iii)
Development
of tools and techniques for pollution prevention.
All the above listed
activities ultimately aim at achieving the concept of sustainable development
by optimal use of natural resources and waste minimization. Various programmes and activities have been
initiated over these years for the protection of environment.
The achievement during the
IXth Plan and goals set for the X Plan
are as under:-
(Rs. in crores)
|
Programme |
IXth
Plan Outlay |
Expdt. |
Physical
Target |
Physical
Achievements |
Xth
Plan Outlay |
Goals
set for Xthe Plan |
|
Development and promotion of clean
technology |
20.00 |
8.16 |
* |
** |
25.00 |
*** |
*Physical targets:
It
was proposed to initiate studies on life cycle assessment, natural resource
accounting and to take up demonstration project on clean technologies.
**Physical achievements:
Carrying
Capacity Studies were initiated for five regions namely; Doon Valley, National
Capital Region, Damodar River Basin, Tapi Estuary and Kochi Region. Out of these, four studies were completed
during IXth Plan and fifth one on Greater Kochi Region has been completed
during the year 2002-2003. Findings of these studies have been discussed with
all the stakeholders.
Life Cycle Assessment Studies
were initiated for three sectors namely; (i) steel, (ii) coal and lignite based
thermal power sector and (iii) pulp and paper.
Out of these, the studies at sl. No. (i) and (ii) have been completed
while the 3rd is progressing well.
A study on natural Resource
Accounting for Upper Yamuna Basin has
been completed. In addition other
initiatives have also been undertaken to use and apply market based instrument for regional environment
management in Hazira, industrial ecology opportunities and implementation of
demonstration projects.
***Goals set for Xth Plan:
Life Cycle Assessment Studies
have been identified as priority area during the Xth Plan for taking up studies in specified sectors. Other demonstration projects for implementation
and promotion of cleaner technologies will be taken up during the Xth Plan.
39. INDUSTRIAL
POLLUTION ABATEMENT THROUGH PREVENTIVE STRATEGIES
The Scheme is an amalgamation of the on-going three
Schemes viz. Environmental Audit, Adoption of Clean Technologies in Small Scale
Industries and Environmental Statistics and Mapping, which have been continuing
since 8th Five Year Plan and to continue during the Xth Five Year
Plan. The Policy statement of abatement
of pollution lays emphasis on preventive aspect of pollution abatement and
promotion of technological inputs to reduce industrial pollution. It also states that authoritative
statistical data on the environment is vital for developmental decision
making. The preventive strategies for
abatement of industrial pollution include environmental audit, waste
minimization/cleaner production and environmental management systems.
The achievement during the
IXth Plan and goals set for the X Plan
are as under:-
(Rs. in Crores)
|
Programme |
IX
plan outlay |
Expdt |
Physical
targets |
Physical
Achieve-ments |
X
plan outlay |
Goals
set for X plan |
Achievements |
|
Environmental
Audit, Adoption of Clean Technology in Small Scale Industries, Environmental
Statistics & Mapping and Waste Minimisation/Cleaner production |
1.70 |
1.70 |
Promotion through sector wise training
programmes for environmental audit, preparation of district wise Zoning atlas for siting of industries
demonstration projects in Waste minimisation. |
|
5.00 |
Continuation of programme of IX plan through
Central and StatePollution Control Boards, institutions etc. |
Modular Environ mental
Audit Manuals Prepared, environ Mental Quality mapping in industrial locations,
training etc. |
40. ASSISTANCE FOR ABATEMENT OF POLLUTION AND ENVIRONMENT POLICY & LAW
The Scheme meets the need to strengthen the various State Pollution Control Boards (SPCBs) and State Environment Departments for enforcing the statutory provisions for taking up pollution abatement measures. The Central Government has been funding the State Pollution Control Boards and State Environment Departments and other national research institutes. The purpose of funding is to strengthen the State Departments of Environment through additional technical manpower and State Pollution Control Boards through scientific analytic equipment that are expensive and hence cannot be procured on State Government’s own funds. Funds to the State Boards are released for equipment and specific studies and projects which would need to be completed within a specific time frame to meet the objective of Policy Statement for abatement of Pollution.
The achievement during the
IXth Plan and goals set for the X Plan
are as under:-
(Rs. in Crores)
|
Programme |
IXth
Plan Outlay |
Expdt. |
Physical
Targets |
Physical
Achievement |
Xth
Plan Outlay |
Goals
set for Xth Plan |
Physical
Achievement |
|
Assistance for Abatement
of Pollution, Environment Policy & Law
|
|||||||
|
Environment
Policy & Law |
1.25 |
0.82 |
|
|
1.40 |
|
|
|
Environment
Policy & Legislation |
|
|
Enactment
of Acts |
Enacted:- (i)National Environment Tribunal Act (ii)National Environment Appellate
Authority Act |
|
1. Revision
/ amendment of the Water (Prevention and
Control of Pollution) Cess Act, 1977 as amended in 1991, to keep pace with
increase in costs and the overall commitment in involving heavy financial
liabilities. 2. Review of EPA 1986 |
1. The Water (Prevention and Control of Pollution)
Cess Act, 1977 amended in March 2003
was enforced by way of issue of a notification in May 2003. The amendments carried out in the Act are still to be finalised. 2.
A notification for enforcement of the same has been issued in May, 2003. Review of EP Act is under consideration. |
|
Ecomark |
|
|
Publication
of notification under Pollution Acts |
10 notifications published |
|
Promotion
of eco-mark scheme with special thrust
on education and creation of awareness building amongst the
consumers. |
A Study on ‘Green Rating
of Indian Industry’ has been got done through CSE. Another Study has been got conducted through TERI on ‘Urban
Services Environment Rating Systems’ (USERS). |
|
|
|
|
Launch
of publicity campaign |
10 projects were awarded |
|
|
|
|
|
|
|
Development
of criteria |
19 notifications published |
|
|
|
|
ISO
- 14000 Certification |
|
|
|
|
|
Some
policy oriented studies on the feasibility of ISO 14000 certification would
be given to research institutions based on the sectors of industry. The data generated from the above studies
will be discussed in workshops, seminars and symposia. A training package would be developed and
imparted to target groups. For the purpose
of dissemination of information, assistance would be given for publication
and other media campaign |
Certification
of Paryavaran Bhavan under ISO-14000: An
Environment Management Plan for Paryavaran Bhavan has been taken up. A Core Group has been formed for the
purpose. This Core Group meets every
fortnight to sort out the problems / issues concerned |
|
Market
Based Instruments |
|
|
|
|
|
The
matter regarding introduction of Market Based Instruments for industrial
pollution abatement is under consideration.
Studies
on the subject have been conducted.
To deal with the range of pollution problems, a mix of regulatory
and economic measures will be adopted |
With a view to integrate Economic Instruments to internalise the cost of pollution and
conserve resources, particularly, water, a Study was assigned on
"Estimation of Pollution Load and Abatement Cost in Select
Industries" for the purpose of Water Cess to National Institute
of Public Finance & Policy (NIPFP) which was completed during the
year. |
|
Trade
& Env. |
|
|
|
|
|
1.
Institutional capacity building For the
10th Five Year Plan, the scheme has been structured in the following
ways for effective delivery mechanism
with a view the sharpening the focus of the scheme and for effective
monitoring: Policy oriented studies: A few studies (on multilateral agreements, WTO agreements,
environmental certifications, national environmental standards and their
implications on trade and vice versa etc.) including country specific cess
studies will be undertaken with the help of concerned ministries and
institutions. 2. After
the completion of the scheme, it is expected that the target groups will be
better equipped and well informed to have discussions/negotiations in various
agreements on environment as well as on trade. The interface between trade and environment would be better
understood and would help in taking informed decisions faster implementation
of policies and programmes. Moreover,
the trade and environment issued would be better institutionalized then they
are today. |
This
Ministry has started contributing on this subject by way of providing inputs
as and when required, to M/o Commerce which is the nodal Ministry for this
subject. MoEF is contributing in the area of Trade & Environment by way
of providing inputs to the nodal Ministry i.e. Ministry of Commerce on policy matters with respect
to environment vis-ŕ-vis trade.
Workshops / seminars and symposia were also organised with the
financial assistance provided by the Ministry The
representative of the Ministry also participated in the 5th WTO
Ministerial Conference held in Cancun(Mexico). MoEF continued to contribute in the area of Trade
& Environment by way of providing inputs to the nodal Ministry on various
policy matters with reference to environment and trade. An amount of Rs. 9.40 lakhs was released
to IIPA under the 3 years consultancy project assigned to them in 2003-04,
for providing inputs on the policy issues relating to trade &
environment. An inter-ministerial Consultation Group has been
constituted under the co-chairmanship of Secy. (E&F) and Secy. (M/o
Commerce). The Group has identified
4 generic issues for policy oriented studies relating to Trade & Environment. Expert Groups on each
of these issues are being set up. |
|
Assistance
for Abatement of Pollution |
10.00 |
13.52 |
Financial assistance to states for purchase
of equipment, studies, projects,
salary support for NE and Sikkim State SPCBs
to meet the objectives of the Policy Statement for Abatement of
Pollution. |
Various SPCBs were assisted for strengthening
their technical capabilities. |
18.42* |
Financial
assistance to states for purchase of
equipment, studies, projects, salary support for UT PCCs and NE &
Sikkim State SPCBs to meet the
objectives of the Policy Statement for Abatement of Pollution including
Environmental Health. |
During 2003-04 assistance was provided to 12 States and UT PCCs for
strengthening of labs and salary support for technical staff and also
Environmental Health. |
*
Excluding Rs.1.25 crores of PL Division
41. CIVIL CONSTRUCTION
UNIT
Civil Construction Unit
(CCU), headed by Chief Engineer (Civil), was set up in the Ministry of
Environment & Forest in august 1987 for taking up important works of the
Ministry on priority basis, in pursuance of the Government decision that major scientific departments with a
substantial annual civil works budget, should have a Civil Construction Unit.
The technical posts are manned by officers drawn from CPWD.
The achievement during the
IXth Plan and goals set for the X Plan
are as under:-
(Rs. in Crores)
|
S. No |
Programme |
IXth Plan Outlay |
Expr. |
Physical Target(no. of
works) |
Physical Achievement |
Xth Plan outlay |
Goals set for Xth
(Plan)no.of works |
Achieve ment (04/2002 to 10/2004) |
|
1 |
Forestry & Wild life |
16.20 |
18.40 |
98 |
54 |
24.50 |
114 |
35 |
|
2 |
Ecology & Environment |
37.00 |
43.68 |
98 |
128 |
83.54* |
70 |
49 |
|
3 |
EAP(DFID aided Major
Head’4406’) |
- |
0.50 |
- |
- |
5.90 |
1 |
- |
|
4 |
North Eastern Areas) |
- |
- |
- |
- |
1.00 |
- |
- |
|
|
Total |
53.20 |
62.58 |
198 |
182 |
114.94 |
185 |
84 |
42. CENTRAL
POLLUTION CONTROL BOARD
Central
Pollution Control Board(CPCB) is an autonomous body under the aegis of the
Ministry of Environment & Forest set up in September, 1974, under the
provisions of the Water (Prevention & Control of Pollution) Act, 1974. CPCB which serves as a technical wing of
MoEF and provide technical assistance to the State Pollution Control Boards
(SPCBs) / Pollution Control Committees (PCCs) for implementation of the
provisions of various pollution control Acts.
The CPCB also provides technical services to the MoEF for implementing
the provisions of the Environment (Protection) Act, 1986.
The achievement
during the IXth Plan and goals set for
the X Plan are as under:-
(Rs. in Crores)
|
Program |
BE |
Actual Expdt. |
Physical Target |
Physical Achievements |
|
Prevention
& Control of Pollution: Central Pollution Control Board |
32.00 |
36.96 |
To undertake survey and monitoring for assessment
of water and air quality, under take the analysis of pollutants, organized
training programs, develop standards & guidelines, compliance of
industries to the prescribed standards, Inventorisation of hazardous waste
generating industries and organize mass awareness programs. |
Monitored water quality of rivers, lakes and
coastal water through SPCBs at 507 locations. Ambient Air Quality has been
taken-up at 290 locations in 92 cities/towns. Monitoring of significant
parameters like Benzene & Poly-Aromatic -Hydrocarbons (PAHs) have been
taken-up. Sanitation Status reports relating to class-I cities and class-II
towns prepared. To strengthen the capabilities of SPCBs, regular Analytical Quality
Control tests have been conducted. Standards have been notified for important
categories of industries such as coalmines, textile, coke-ovens, integrated
iron & steel, noise standards for D.G. Sets, primary water quality
criteria for bathing waters & standards for firecrackers & battery
manufacturing units. Various training programs were organized/ sponsored for
officials of CPCB/ SPCBs/ PCCs. Regular follow-up were taken-up with respect
to 17 categories of highly polluting industries and follow up actions were
maintained with SPCBs in respect of implementation of action points in
critically polluted areas for restoration of environmental quality.
Preparation of Environmental Atlas for siting of industries in India has been
completed. The performance of treatment technologies for cleaner production,
Sewage treatment plants, risk assessment in chemical industries, control of
noise level from diesel generator sets, root zone treatment technology for
industrial and domestic effluents have been taken-up. CPCB participated in
various exhibitions organized by different agencies. Several technical
reports were brought out. Inventorisation of hazardous waste generating
industries was completed. Standards for leachate from hazardous waste
dumpsite have been developed. Assessment of hazardous waste disposal
facilities in industries and follow-ups of Committees constituted for
hazardous wastes/chemicals were taken-up. |
IIB. OUTLAY FOR XTH PLAN:
(Rs. in Crores)
|
Program |
Xth Plan Outlay |
Goals for Xth plan |
Anticipated Achievements |
|
Central
Pollution Control Board |
100.00 |
Strengthening of National Ambient Air Quality
Program (NAMP). Preparation of State wise Environmental Status Reports &
action points for prevention of pollution in metro-cities. Strengthening of
monitoring capabilities in CPCB as well as SPCBs/ PCCs. Ensuring installation
pollution control devices in large & medium polluting units. Ensuring
installation of pollution control devices in small-scale industries (SSIs)
located in industrial estates are covered under CETPs. State specific programmes relating to
prevention & control of pollution. Environmental Impact Studies on human
health. Implementation of MSW rules, BMW rules PWM Rules, Batteries Rules,
Hazrdous Mangment Ruels etc. Treatment & disposal facilities will be also
be ensured in this period. |
Efforts will be made to implement the set goals. |
43. ASSISTANCE
TO BOTANIC GARDENS
The
scheme was initiated during 1991-92 to promote ex-situ conservation and
propagation of rare and endemic plant genetic resources in different regions of
the country through a network of botanic gardens. Under this scheme, one time non-recurring financial assistance is
provided to existing botanic gardens for strengthening their infrastructural facilities to
facilities conservation and propagation of rare and endemic plant species of
the region.
The achievement during the
IXth Plan and goals set for the X Plan
are as under:-
(Rs. in Crores)
|
Programme |
IXth Plan
Outlay |
ActualExpdt. |
Physical
Targets |
Physical Achievements |
Xth Plan
Outlay |
Goals set
for X Plan |
Achievements |
|
Assistance
for Regional Botanical Gardens |
5.00 |
5.45 |
To provide one time financial assistance to about
50 botanical gardens. |
93 Botanical Gardens were provided financial
support |
15.00 |
To provide one-time financial assistance to
existing as well as new botanical gardens for improving their infrastructural
facilities ex-situ conservation of rare and endangered plants species. |
40 Botanical Gardens were provided financial
assistance. |
44. RESEARCH AND
ECOLOGICAL REGENERATION (R&D)
Ministry of Environment & Forests has been
funding research in multi-disciplinary aspects of environmental and ecosystems
protection, conservation and management at various universities, institutions
of higher learning, national research institutes and non-governmental
organisations. The primary objectives
are to develop strategies, technologies and methodologies for better environment
management and also create infrastructure and a pool of trained manpower to
shoulder the responsibility of environment management in the country. Environmental research particularly aims at
attempting solutions to the practical problems of resource management and
provides necessary inputs for the twin objectives of conservation of natural
resources and restoration of environmental quality.
The achievement during the
IXth Plan and goals set for the X Plan
are as under:-
(Rs. in crores)
|
Programme |
9th Plan outlay |
Exp. |
Physical Target |
Physical Achiev. |
10th Plan outlay |
Goals set for 10th plan |
Achiev. |
|
Research And Development |
17.00 |
17.54 |
1. During the 9th plan, 30-review meetings to review the progress of on-going projects were proposed. 2. During the 9th plan, 30-meetings of Advisory Committee for considerat-ion of new projects were proposed. |
1. During the 9th plan, 30-review meetings to review the progress of on-going projects were organized. 2. During the 9th plan, 30-meetings of Advisory Committee for considerat-ion of new projects were organized |
24.00 |
During the 10th plan, 30-review meetings to review the progress of on-going projects have been proposed 2. During the 10th plan, 30-meetings of Advisory Committee for consideration of new projects have been proposed. |
Up to Oct’04 11-review meetings have been organized. 2. Up to Oct’04 10-meetings of the Advisory
Committee for consideration of new proposals have been organized. |
45. G.B. PANT INSTITUTE OF HIMALAYAN
ENVIRONMENT & DEVELOPMENT
G.B. Pant
Institute of Himalayan Environment & Development, Kosi‑Katarmal,
Almora was established during Pt. Pant's birth centenary year in August 1988,
as an autonomous Institute of the Ministry of Environment & Forests. The
Institute is identified as a focal agency to advance scientific knowledge, to
evolve integrated management strategies, to show their efficacy for
conservation of natural resources, and to ensure environmentally sound‑sustainable
development in the entire Indian Himalayan region. The Institute has also
established linkages with National and International
organizations committed to environment
and development linked issues in the Mountain Regions.
(Rs. in Crores)
|
Programme |
9th Plan* Out lay |
Exp. |
Physical Target |
Physical Achievements |
10th Plan Out lay Proposed |
Goals set for Xth
Plan |
Achieve-ment |
|
G.B. Pant Institute of
Himalayan Environment & Development |
28.15 (24.59) |
24.25 |
1. Initiation of focused R&D programmes in
identified priority areas. 2. Construction of building complex at Katarmal
(HQs) and initiation of construction at Kullu (HP) and Panthang (Sikkim). |
1. Seven core programme were fully operational. A number of R&D programes were initiated through these 7 Cores of the Institute and some of these were completed. 2.
Building complex at the HQs were
completed. Works at Kullu & Panthang were also completed and
campus at Kullu is made fully functional. |
31.57 |
* |
** |
|
Integrated Eco-development
Research Programme (IERP) for
Himalayan Region. |
2.78 (2.10) |
2.15 |
To support location specific activities throughout
the Indian Himalayan Region. |
59 (R&D) projects were sanctioned to the
various organizations in 10 Himalayan states of the country. Nine R&D
projects were completed in all the respects during the 9th plan
period. |
3.43 |
|
|
Value
shown in parenthesis is actual amount release.
G.B. Pant Institute of
Himalayan Environment & Development
*Physical Targets
1. Strengthening of 7 R&D Core Programmes initiated in
the preceding plan period at the HQs and through 4 units. Facilities and activities, which need to be
initiated, include dcumentation/ publication cell / Hindi Rajbhasa cell,
planning & coordination cell.
2. Documentation of traditional practices, research in
medicinal plant, glacier studies and traditional water management in the
Himalayan Region need to be strengthened.
3. Completion of Pangthang campus and strengthening of
infrastructure facilities in existing campuses of the institute at Kullu &
Gangtok & H.Q. at Katarmal, Almora.
**Physical Achievements
1. R & D activities under 7 core
programmes as per approved annual plan by the Science Advisory Committee (SAC)
and Governing Body of Institute are successfully continued.
2. Pangthang campus made functional and
other work initiated.
3. Targets will be achieved
within the plan period.
Integrated Eco-development
Research Programme (IERP) for Himalayan
Region.
*Physical Targets
Continuation of support to ongoing R&D projects and initiation of new location specific projects
throughout Indian Himalayan Region.
**Physical
Achievements
All
ongoing projects would be completed during the Plan period and several new
projects for location specific activities would be initiated. Dissemination of findings will also be
augmented.
46. HAZARDOUS SUBSTANCES MANAGEMENT
Hazardous Substances Management Scheme deals with management of chemical emergencies and hazardous substances in the country. The activities are carried out under three thrust areas i.e. Chemical Safety, Sound Management of Hazardous Wastes and Municipal Solid Wastes. The following Rules have been notified so far to ensure environmentally sound management of hazardous substances and wastes in the country;
§ Manufacture, Use, Import, Export and Storage of Hazardous Micro-organisms and Genetically Engineered Organisms or Cells Rules 1989
§ Manufacture, Storage and Import of Hazardous Chemicals Rules 1989/2000
§ Hazardous Waste (Management & Handling) Rules 1989/2000/2003;
§ The Public Liability Insurance Act, 1995
§ The Chemical Accidents (Emergency Planning, Preparedness & Response) Rules 1996
§ Biomedical Wastes (Management & Handling ) Rules 1998/2000/2003;
§ Utilization of Flyash Notification 1999/2003
§ Recycled Plastic (Manufacture & Usage) Rules1999/2003
§ Municipal Solid Waste (Management & Handling) Rules 2000;
§ Batteries (Management & Handling) Rules 2001
These Rules are being modified/amended from time to time.
The three International Conventions namely the Basel Convention on the Control of Trans-boundary Movement of Hazardous Wastes and their Disposal, the Rotterdam Convention on the Prior Informed Consent (PIC) Procedure for Certain Hazardous Chemicals and Pesticides in International Trade and the Stockholm Convention on Persistent Organic Pollutants (POPs) are also dealt with under the Scheme.
The achievement during the
IXth Plan and goals set for the X Plan
are as under:-
(Rs. in crores)
|
Programme |
IXth Plan Outlay |
Expendt |
Physical target |
Physical Achievements |
Xth Plan outlay |
Goals set for Xth Plan |
Achievements |
|
Hazardous Substances Management |
22.00 |
13.94 |
** |
*** |
70.00 (revised to 35.00 after mid term appraisal) |
**** |
## |
** Physical Targets for IXth Plan
· Strengthening of HSM structure in the States
· Accident, Prevention and Emergency preparedness
· Crisis Management during chemical accidents
· Notification of new regulations & amendment of existing ones as and when necessary
· Implementation of the various notified Rules.
· Identification of site, site remediation and establishment of disposal facilities for hazardous wastes including biomedical wastes
· Management of Municipal Solid Wastes
· Capacity building, strengthening of infrastructure and training of personnel in SPCBs/PCC
· Creation of awareness among all stakeholders about the various Rules and Regulations relating to hazardous substances management
***
Achievements of IXth Plan
· HSM Structures created in all the States and are being strengthened regularly.
· Off-site emergency plans prepared in 12 districts
· Central Crisis Group and Coordination Committee constituted and meetings held regularly
· New Rules/Amendment Rules brought out for management & handling of specific wastes such as biomedical wastes, lead acid batteries, flyash, recycled plastics, municipal solid waste etc.
· Sites for setting up common facilities for treatment, storage and disposal of hazardous wastes (TSDF) have been identified in several States.
· Financial assistance provided for establishment of 2 TSDFs – one in Trans-Thane Creek (TTC), Maharashtra and the other in Hyderabad, Andhra Pradesh.
· A new Registration Scheme initiated for recycling/reprocessing used/waste oil, used lead acid batteries and other non-ferrous metal wastes in an environmentally sound manner.
· Registration granted to 119 units recycling/reprocessing hazardous wastes.
· Financial assistance provided to SPCBs/PCCs for better implementation of the various Rules relating to hazardous substances management.
**** Goals for Xth Plan
· Continuation of District Hazard Analysis and preparation of off-site Emergency Plans.
· Setting up of Emergency Response Centres.
· Providing support to Poison Control Centres.
·
Preparation
of National & State Inventories on hazardous wastes generation as per HW
Rules 2003.
·
Setting
up of common Treatment , Storage and Disposal Facilities (TSDF) for industrial hazardous wastes.
·
Inventorization
of illegal hazardous wastes dump sites & preparation of remediation plans for the same
·
Harmonization
of hazardous wastes with the EXIM Policy to regulate the export/import of these
wastes.
·
Banning
the import & export of hazardous wastes listed in Annexe 8 of the Basel
Convention, in phases.
· Setting up of Demonstration Plants for Management of Municipal Solid Wastes including Plastic Wastes.
· Guidelines/projects on Fly-ash utilization.
· Strengthening of SPCBs/PCCs for better implementation of various Rules relating to HSM.
· Continuation of on-going projects and studies on the 3 identified thrust areas as well as initiation of new need based studies.
· Organization of training programmes and workshops to build capacity and to disseminate information about various Rules and Amendments to concerned stake-holders.
· Fulfilling of national obligations under the 3 international conventions handled by the Division.
· Strict and effective implementation of the various Rules on hazardous substances management notified and amended from time to time.
· Preparation of guidelines/guidance documents on identified thrust areas
· Implementation of the directions of the Supreme Court on hazardous waste management.
## Achievements
of X Plan (April 2002 to 13.12.2004)
· Preparation of Off-site plans for new industrial pockets undertaken.
· Final report on remediation /reclamation of contaminated areas in Bichhri, Rajasthan received.
· Training programmes /workshops supported under chemical safety & emergency planning and management of hazardous wastes, biomedical wastes & municipal solid wastes.
· Grants provided to 4 TSDFs- one at Andhra Pradesh, one in Maharashtra & 2 in Gujarat.
· TSDF proposals from Karnataka, T.N, Haryana, W.B. & Punjab under examination.
· Final report on harmonization of hazardous wastes with the EXIM Policy of the country received and being examined.
· Registration Scheme transferred to CPCB under Hazardous Wastes (Management & Handling) Amendment Rules 2003.
· Hazardous Wastes (Management & Handling) Amendment Rules 2003 notified on 20th May 2003.
· Hazardous Wastes (Management & Handling) Amendment Rules 2004 notified on 19th July 2004.
·
Recycled
Plastics (Manufacture & Usage) Amendment
Rules notified on 17th June,2003.
·
The
Fly ash Amendment Notification issued on 27th August,2003.
· The Bio Medical Wastes (Management & Handling) Amendment Rules, notified on 17th September, 2003.
· One time Registration granted to 47 importers of new lead acid batteries, under the Batteries Rules, 2001
· Studies on measurement of dioxins from incinerators of bio-medical waste management facility and plastic waste management being initiated.
· Proposals for setting up of demonstration plants in different cities of the country for management of municipal solid waste being examined.
· Under the study “ A Preliminary Enabling Activity Project to prepare National Implementation Plan (NIP) for POPs” assigned earlier to ITRC, Luncknow with UNIDO as the executing agency under GEF assistance, ITRC has submitted a draft final report to the Ministry.
· Regular participation in the various Technical Meetings of the Basel, POP & PIC Conventions & follow-up action continued.
· A Monitoring Committee constituted to oversee that the orders of the Supreme Court in WP657/95 are implemented in time.
· Seven meetings of the SCMC held and 4 quarterly reports submitted to the Supreme Court.
47. BIODIVERSITY
CONSERVATION
The matters concerning Conservation of Biological Diversity, its
sustainable use and fair and equitable sharing of benefits arising out of the
use of biological resources and knowledge are dealt under the Biological
Diversity Conservation Scheme. Under the scheme, a comprehensive project for
preparation of National Biodiversity Strategy and Action Plan(NBSAP) was
launched aimed at producing a series of planning documents relating to
ecological security and livelihood of people most dependent on natural
resources. In addition, Matters
relating to Convention on Biological Diversity, Bio-safety and Legislation are
also dealt under the scheme.
A technical policy core
group set up under NBSAP project has prepared the draft of the National
Plan. The Biological Diversity Act,
2002 was passed by the Parliament and got accent of the President. The Act provides for establishment of
National Biodiversity Authority, State Biodiversity Boards and Local level
Biodiversity Management Committees. The National
Biodiversity Authority has already been established at Chennai. The
notification bringing selected sections of the Act into force has been issued on 1st Oct,2003.
The achievement during the
IXth Plan and goals set for the X Plan
are as under:-
(Rs. in Crores)
|
Programme |
IXth Plan outlay |
Expdt. |
Physical target |
Physical Achievements |
Xth Plan outlay |
Goals set for Xth Plan |
Achievements. |
|
Bio-diversity Conservation
|
6.00 |
2.88 |
*
|
** |
12.00 |
*** |
**** |
* Physical Targets
-
To
facilitate implementation of National Action Plan on biodiversity.
-
Formulation
and implementation of legislation on biodiversity.
-
Implementation
of Cartagena Biosafety Protocol and
-
Genetic
Engineering Approval Committee.
** Physical Achievements.
Adopting
a consultative process with the stakeholders, a National Policy and Action
Strategy on Biological Diversity has been drawn up as a macro-level statement
of strategies, gaps and further actions needed for conservation, sustainable
use and strategies and realization of actual and potential value of biological
diversity.
The NBSAP project undertook assessment and stocktaking of biodiversity
related information at state level including distribution of endemic and
endangered species and site specific threats and pressures. These detailed
State level action plans have been consolidated and a national level action
plan has been developed.
The legislation passed by
Parliament, primarily addresses the
issues concerning access to genetic resources and associated knowledge by
foreign individuals, institutions or companies, and equitable sharing of
Biodiversity.
The Cartagena Protocol on
Biosafety, the first international regulatory framework for safe transfer,
handling and use of living Modified Organisms ( LMOs) was negotiated under the
aetgis of the Convention on the Convention on Biological Diversity. The Protocol seeks to protect biological diversity
from the potential risks posed by living modified organisms resulting from
modern biotechnology. The protocol was
adopted on 29th January, 2000.
The protocol has been signed by 103 countries ( except USA). India has acceded to the Biosafety Protocol
on 17th January, 2003. The
Protocol has come into force on the 11th September, 2003. The mandate of the Genetic Engineering
Approval Committee ( GEAC) constituted under Rules for the Manufacture, Use,
Import, Export and Storage of Hazardous Microorganisms Genetically Engineered
Organisms or Cells 1989 issued by the Ministry of Environment and Forests under
the Environment ( Protection) Act, 1986, is to approve large scale trials and
release of recombinant products. In
recent past, research on recombinant products in India has increased manifold.
*** Goals set for X plan.
§
Enactment
and implementation of the biodiversity legislation, including preparation of
People’s Biodiversity Registers.
§
Preparation
of NBSAP final project document.
§
Implementation
of action plan on biodiversity and internalization of biodiversity concerns in
sectoral and cross-sectoral programmes.
§
Implementation
of obligations under Cartagena Biosafety Protocol.
§
Implementation
of a biosafety regulatory framework in the country, including matters related
to GEAC.
§
Conservation
of medicinal plants.
§
Conservation
and management of sacred groves.
§
Conservation
of coastal and marine biodiversity, including mangroves and coral reefs.
*** Achievements of Xth Plan.
§
Both
the Houses of Parliament passed the Biological Diversity Bill, 2002 and Hon’ble
President accented the Bill. The
Biological Diversity Rules , 2004 has also been notified.
§
Under
the NBSAP project, action plans at
state/Union territory level, sub-state level eco-regional level &, thematic level have been
prepared.
§
Cabinet
approval for India’s ratification of the Cartagena Protocol on Biosafety.
§
Conditional
approval for release of India’s first transgenic crop – Bt Cotton, into
environment. Implementation of these
schemes is underway.
48. CONSERVATION
AND MANAGEMENT OF WETLANDS, MANGROVES AND CORAL REEFS
The Scheme on Conservation
and Management of Mangroves and Coral Reefs was initiated in 1986 with the
objectives of conservation and
protection of the Mangrove Eco-system from further degradation; afforestation
of degraded Mangroves areas; Maintenance of genetic diversity especially of the
threatened and endemic species and creation of awareness among the people on
importance of
Mangrove Ecosystem and the
need for conservation.
The achievement of the
scheme during the 9th Plan and goals set for 10th Plan
are given below:
(Rs.
in Crores)
|
Scheme |
9th Plan Outlay |
Exp. |
Physical targets |
Physical achievements |
Xth Plan outlay |
Goals set for Xth Plan |
Achievements |
Conservation
& management of Wetlands
|
Rs.14.00 crores
(RE) |
Rs.
13.00 crores |
Implementation
of Management Action Plan of 20 identified wetlands |
Implemented Management Action Plans (MAPs) on 18
wetlands except Kabar (Bihar) and Ujni (Maharashtra). |
30.00 |
Physical:
27 wetlands + 38 newly identified wetlands and R&D activities Financial:
30.00* |
Physical:
MAPs of 27 identified wetlands+ 38 newly identified wetlands and
research projects Financial:
15.60 |
Conservation
& management of mangroves & corals
|
Rs.14.00 crores
(RE) |
Rs.
13.18 Crores |
Implementation
of management action plan (MAP) of
identified mangroves & coral reef areas |
Implemented MAPs of 24 mangrove areas & 4
coral reef areas. |
Rs. 24.00 crore |
Implementation of MAPs for identified mangroves
and coral reefs sanctioning of research projects |
Implemented Management Action Plans (MAPs) on 20
mangrove areas & 3 coral reefs areas. |
* The additional requirement
will be Rs 4.00 corers in view of the Col No 2 .
Achievements :
Wetlands :
i)
A
Directory of Wetlands has been prepared indicating 2107 natural wetlands and
65253 man made wetlands, occupying an area of 4.1 million hectares.
ii)
A
country wide survey and mapping of wetlands has been carried out using Remote
Sensing Technology.
iii)
Information
on the status of 183 wetlands has been compiled which are considered as
Wetlands of national/International importance.
iv)
The
guidelines for the preparation of management action plans have been formulated
which include components such as protection, catchment area treatment,
sustainable fisheries development, wildlife conservation, pollution control,
weed control, siltation control and generating awareness about values and
functions of wetlands.
v)
Management
Action Plans have been prepared for 25 out of 27 identified wetlands which are
at the various stages of implementation.
vi)
Catchment
area, which controls the ecological functioning of water bodies, has been
identified as a key component.
vii)
Research
projects have been supported to provide technical and scientific inputs to
address the problem of wetland conservation.
viii)
State
level Steering Committees have been constituted for the formulation and implementation of Management Action Plans
for identified wetlands. At the apex,
the National Committee advises the Government on policy, planning and
implementation of the programme.
ix)
Wetland
Authorities have been set up in some States, viz., Loktak Development Authority
in Manipur, the Chilka Development Authority in Orissa and the Lakes and
Waterways Authority in Jammu and Kashmir.
(x) 13 new sites from India were declared as
Ramsar sites of international importance in addition to existing six sites.
. Six sites are in the process of
being designated as Ramsar sites and 6 more sites are being processed. This is as per our commitment made in CoP7
meeting held in Costa Rica in May, 1999 on intervention of Wetland
International where India committed to declare 25 more sites during the
triennium.
(xi) Ramsar Conservation Award has been given
to Chilka Development Authority in India for ecological intervention of Chilka
lake. This is for the first time that
any Asian country has been given such award.
(xii) India actively participated in CEPA
programme of Ramsar Bureau and sponsored the Draft Resolution with other four
countries. This resolution was adopted in CoP 8 meeting held in Valencia in
November, 2002 without any amendment.
(xiii)
Five regional workshops on wetland conservation have been organized for Western, Southern,
Eastern, North Eastern and Central regions at Ahmedabad, Cochin, Bhubaneswar,
Imphal and Bhopal respectively. Recommendations emerging out of these workshops
are being compiled and will be sent to user agencies.
Mangroves
& Corals
Achievements :
·
The
Ministry provides grants to the State Government/UT on an annual basis both for
plantation of mangroves and rehabilitation of degraded mangrove areas.
·
During
the 10th Five Year Plan, an outlay of Rs. 24 crores has been made
for conservation and management of mangroves and coral reefs in the country.
·
35
mangrove and 4 coral reefs areas in the country have been identified for
intensive conservation and management.
·
Protection
measures for mangroves have been intensified.
·
During
COP-8, the Department of Posts in collaboration with MOEF brought out four
commemorative stamps and a first day cover displaying the beauty and grandeur
of mangroves.
·
Status
of Mangroves in the country have been reviewed and publication is underway.
·
The
mangroves in India comprise 69 species under 42 genera and 28 families. India
is home to some of the best mangroves in the world.
·
The
Ministry has established a National Mangrove Genetic Resources Centre in
Orissa.
·
Two
mangrove species are endemic to India. One species is Rhizophora
annamalayana, occurring in Pichavaram, Tamil Nadu. Another species is Heritiera kanikensis
that exists only in Bhitarkanika of Orissa.
·
Sunderbans
(West Bengal) have been included in the World List of Biosphere Reserves by
UNESCO. They represent the largest stretch of mangroves in the country.
49. BIOSPHERE RESERVE
The scheme on Biosphere
Reserve was initiated in 1986 for in-situ conservation of representative
ecosystem of major bio-geographic zone of global importance. Sustainable development, protection
research, monitoring, education, training and information exchange are major
components of the scheme. The 13
Biosphere Reserves designated so far in the State of Kerala, Karnataka, Tamil
Nadu, Uttar Pradesh, Meghalaya, Andaman & Nicobar, Assam, West Bengal,
Orissa, Arunachal Pradesh, Madhya Pradesh and Sikkim. Central assistance is provided under central sector scheme to the
State Governments for implementation of approval items of activities. Research
projects are supported to understand ecosystem functions and structure.
The achievement of the
scheme during the 9th Plan and goals set for 10th Plan
are given below:
(Rs. in Crores)
|
Programme |
IXth Plan Outlay |
Exp. |
Physical targets |
Physical Achievements |
Xth Plan Outlay |
Goals set for X Plan |
Achievements |
|
Biosphere Reserve |
20.00 |
21.41 |
Funding
for management and research for existing Biosphere Reserves. |
Funds were provided for management of existing BRs
and research. |
35.00 |
To
designate 3 new sites as Biosphere Reserve and bring existing as well as new
BRs on world network of BRs |
One
new BR has been designated and one existing BR has been recognized on world
network. |
50. INTERNATIONAL
COOPERATION
Ministry of Environment & Forests is the nodal agency in the Government of India for United Nations Environment Program (UNEP), South Asia Cooperative Environment Program (SACEP) and International Centre for Integrated Mountain Development (ICIMOD), Annual Membership Contributions are made to these organizations by the Ministry. The Ministry also functions as the nodal agency for participation in international agreements such as the Convention on Wetlands, Basel Convention on Transboundary Movement of Hazardous Substances, Convention on Biological Diversity, Framework Convention on Climate Change, Montreal Protocol on Substances that deplete the Ozone Layer and the Convention to Combat Desertification, etc.
Within the Ministry,
IC&SD Division is the functional window for all the international issues,
such as the above and others such as Bilateral Programs, trainings abroad,
National Environment Council (NEC), matters relating to international regional
bodies like SAARC, SACEP, EU, World Bank, ESCAP etc. and projects under Global
Environment Facility (GEF) and sustainable development issues such as State of
Environment Reporting at State/UT level, development of sustainable development
strategies, sustainable development indicator etc.
The achievement of the scheme during the 9th
Plan and goals set for 10th Plan are given below:
(Rs.
in crores)
|
Programme |
IXth Plan Outlay |
Expdt. |
Physical Targets |
Physical Achievements |
Xth Plan Outlay |
Goals set for X Plan |
Achievements |
|
International Cooperation |
31.00 |
29.40 |
Existing activities
including contributions to international organisations and participation
various international meetings to continue.
Implementation of externally aided projects funded by ICEF, UNDP/
Government of India CCF Programme. |
All the activities were
implemented as per schedule. |
57.00 |
Existing activities and
contributions to international organisations to continue. Implementation of continuing and new
externally aided projects. |
All the activities have so
far been implemented as per schedule. |
51. ADAPTATION & CAPACITY BUILDING PROJECT ON CLIMATE CHANGE
This scheme was initiated
during the year 2002-03. India hosted
the Eight Conference of Parties to the United Nations Framework Convention on
Climate Change from 23rd October to 1st November, 2002 at
Vigyan Bhawan, New Delhi. Over 4300
delegates from all over the world attended
the Conference, making it one of the biggest
international event of its kind ever held in the country.
(Rs. in crores)
|
Name of the Scheme |
Xth Plan Outlay |
Goals set for the Xth Plan |
Achievements |
|
Adaptation
& Capacity Building Project on Climate Change |
30.00 |
|
|
|
|
Organisation
of important events on Climate Change issues. |
COP-8
organised during 23rd October – 1st November 2002, was
a big success. More than 4000
delegates from all over the world attended the Conference. A
Climate Change Technology Bazaar and related workshops were organised from
10-13 November 2003 in New Delhi. 22nd
Plenary of IPCC was successfully organised in New Delhi from 8 – 11 November,
2004 |
|
|
|
|
Activities
relating to adaptation to climate change |
Participated
in Seminars/ Workshops, etc. |
|
|
|
Capacity
building at appropriate levels for taking climate change considerations in
social, economic and development planning |
Participated
in Seminars/ Workshops, etc. |
|
|
|
Impact
assessment including impacts on food and water resources, eco-system and
bio-diversity, human settlements and human health |
Analysed
the impacts in India’s Initial Communication to UNFCCC. |
|
|
|
Promotion
of scientific and technological research and systematic observation with the
view to furthering understanding of climate change |
Publications
on Climate Change and in India’s Initial Communication to UNFCCC were brought
out.. |
|
|
|
Education,
training and public awareness |
A
Website on ‘Climate Change’ was launched.
Climate Change Film prepared /
shown |
|
|
|
Enhancement
of international co-operation in pursuance of the objectives of the United
Nations Framework Convention on Climate Change |
India’s
position on ‘Climate Change’ was strengthened in Conference of Parties to the
UNFCCC and various international meetings. |
Note: As this Scheme was initiated during Xth Plan,
information for Ixth Plan is Nil.
52. ESTABLISHMENT OF ENVIRONMENT
AUTHORITIES, COMMISSIONS AND
TRIBUNALS
(Rs. in crores)
|
Programme |
IX Plan Outlay |
Expdt. |
Physical Target |
Physical Achieve-ment |
Xth Plan Outlay |
Goals set for Xth Plan |
Achievements |
|
National
Envn. Appellate Authority Loss
of Ecology (Prevention and Payments of Compensation) Authority for Tamil Nadu Environment
Pollution (Prevention & Control) & other Authorities |
13.00 |
12.76 |
* |
** |
15.00
for all the Envn. Authorites. |
Nil,
as the Authorities have to take action as per their terms of reference. |
All
the Authorities have completed the work as mentioned in the terms of
reference |
* Physical Target:
National Envn. Appellate Authority has been set up under NEAA Act 1997
to hear appeals. Other two Authorities
have been set as per the directions of Hon’ble Supreme Court.
** Physical Achievement:
All the Envn. Authorities are required to take action as per their terms
of reference.
The NEAA is a statutory judicial Authority and the
other two Authorities have also been set up as per the directions of Hon’ble
Supreme Court and therefore, do not operate any programme nor implement any
Schemes. Hence the information on the
review of IX Plan may be treated as Nil.
An outlay of Rs. 15.00 crores has been made for Xth Plan for
establishment of Environment Authorities and Commissions and Tribunals.
53. INDUSTRIAL POLLUTION
CONTROL PROJECTS:
(EXTERNALLY AIDED
SCHEMES)
WORLD BANK
AIDED INDUSTRIAL POLLUTION PREVENTION PROJECT
The main objectives of the
scheme are to promote cost-effective pollution abatement from industrial
sources. The Project focused on the
most pollution industrial sectors as defined by GOI ( 17 industrial sub-sectors)
and comprised of three components, viz. (i) industrial (ii) Investment (iii)
Technical Assistance. Under this
scheme, funds released by GOI were reimbursed by the World Bank. The participating States under this Scheme
were – Andhra Pradesh, Gujarat, Karnataka, Rajasthan and Madhya Pradesh (including
Chattishgarh). This Scheme started in
1995 and closed on 30th November, 2002. The residual activities of the Scheme have been included in the
World Bank aided EMCBTA Project.
The targets/achievements for 9th Plan and
goals set for 10th Plan are given below:
(Rs.
in crores)
|
Programme |
IXth
Plan Outlay |
Expdt. |
Physical
Targets |
Physical
Achievement |
Xth
Plan Outlay |
Goals
set for Xth Plan |
Physical
Achievement |
|
World
Bank Aided Pollution Control Project |
100.76 |
100.76 |
|
|
10.00 |
|
|
|
a. Industrial Pollution Control Project
(Phase-I) |
|
|
Procurement
of equipment for the four SPCBs viz., UP. TN, Gujarat and Maharashtra |
Equipments have been procured under IFB 1A
and B |
|
|
|
|
|
|
|
Construction
of laboratories for the four project SPCBs |
Laboratories have been constructed at UP, TN
and Maharashtra SPCBs |
|
|
|
|
|
|
|
Training
of SPCB personnel |
Training was imparted to PCB personnel in the
various subjects of Environment Management |
|
|
|
|
|
|
|
Construction
of CETPs |
83 CETPs were constructed |
|
|
|
|
|
|
|
Award
of Demonstration Projects |
12 Demonstration projects were completed |
|
|
|
|
|
|
|
Award
of projects under TA Component |
|
|
|
|
|
b. Industrial Pollution Prevention Project
(Phase-II) |
|
|
Procurement
of equipment for 5 Project SPCBs, viz., Andhra Pradesh, Karnataka, M.P.,
Rajasthan and Chhattisgarh |
Equipment
worth Rs. 18.98 crores were procured and installed at the SPCBs |
|
Procurement of laboratory & monitoring
equipment by Project SPCBs through local shopping |
Equipment
has been procured through local shopping. |
|
|
|
|
Provision
of facilities for the laboratories in the SPCBs of the five States mentioned
above |
Work
completed |
|
Procurement of Field Sampling Vans for the Project
SPCBs |
7
Sampling Vans each were procured for APPCB, KSPCB, MPPCB and 2 for
Chhattisgarh ECB |
|
|
|
|
Imparting
of training to the personnel of PCBs |
The
domestic component of the training programme has been successfully
implemented and 439 officers of SPCBs, MoEF & CPCB have undergone
training in a total of 18 modules.
Modules for foreign training have been identified. These are proposed to be implemented under
the World Bank aided EMCBTA Project. |
|
Procurement of laboratory & monitoring
equipment by project SPCBs through local shopping |
Training
modules for overseas training were identified. However, the same could not be implemented for want of time as
IPPP closed on 30.11.2002. The
modules are proposed to be implemented under the World Bank aided
‘Environment Management Capacity Building Technical Assistance Project’. |
|
|
|
|
Provision
of funds to industries for waste water
recycling projects |
This
work has been completed |
|
Procurement of Field Sampling Vans for the Project
SPCBs |
This
was carried out satisfactorily |
|
|
|
|
Provision
of funds to Gujarat for software procurement
and training under the GIS and
CIMS Project |
The
work has already been completed. |
|
Completion of overseas training programme &
equipment specific training for SPCB officials |
The
Study was conducted satisfactorily |
|
|
|
|
Identification of waste minimisation circle
for large and small industries. Identification and training of Consultants |
More
than 100 Waste Minimisation Circles were established in various industrial sectors |
|
Finalisation
of the Laboratory Guidance Manual in
consultation with US (EPA) for adoption by SPCBs |
Senior
Scientists of this Ministry, CPCB/SPCBs were sent on a Study Tour to US (EPA)
laboratories and to attend a workshop on ‘Laboratory Quality Systems’ in USA
to know about the functioning of labs there |
|
|
|
|
|
|
|
Gap Analysis Study at the Project SPCBs to
identify the gaps in the existing system and for implementation of the
Laboratory Guidance Manual at the Project SPCBs |
Road
Shows were organised by KSPCB to enable exchange of information for other
SPCBs |
|
|
|
|
|
|
|
Organization of US-EPA Study Tour for improving the understanding of Sr.
Scientific Officers regarding Laboratory Quality Systems |
The
Study was initiated in September, 2002.
However, due to shortage of time, the Study could not be
completed. It is proposed to complete
the study under the on-going World Bank aided EMCBTA Project. |
|
|
|
|
|
|
|
Organisation of Road Shows |
*These
activities which were to be taken up only if the ‘Industrial Pollution
Prevention Project’ got an extension for a year beyond 30.11.2002, could be
initiated as IPPP closed on 30.11.2002.
|
|
|
|
|
|
|
|
Resource Optimization Study at Project SPCBs to
develop a monitoring and enforcement strategy and associated plans at the
Project SPCBs for optimal planning and utilization of resources |
|
|
|
|
|
|
|
|
*Additional
training and procurement of hardware under the GIS/MIS activity |
|
|
|
|
|
|
|
|
*Geo-referencing of industries using GIS and
locating them on maps |
|
|
|
|
|
|
|
|
*Additional / ancillary activities pertaining to
strengthening of laboratories, Environmental awareness etc. |
|
|
|
|
|
|
|
|
*Implementation of Laboratory Guidance Manual |
|
|
|
|
|
|
|
|
*Strengthening of Field Laboratories and provision
of Field Equipment in r/o of APPCB, MPPCB and RSPCB |
|
|
|
|
|
|
|
|
*Industry-Community Partnership |
|
|
|
|
|
|
|
|
*Installation of Smart Card System at APPCB,
MPPCB, RSPCB and CECB |
|
|
|
|
|
|
|
|
*Creation of Hazardous Waste Cell at APPCB |
|
54.
COMMON EFFLUENT TREATMENT PLANTS
(CETPs)
This programme has been
spread over to all the States in India.
The financing pattern for the CETPs consists of 20% promoter’s
contribution and a grant from the remaining could be availed as a loan from the
any financial institutions.
The
CETPs are managed by a CETP Company, formed by the small-scale industrial units
intending to construct a CETP. This
company has various office bearers to supervise the operation and maintenance
of CETP. The State Pollution Control
Board makes periodical monitoring of the operation, maintenance as well as
statutory requirement of the individual CETP so as to control pollution from
the small scale industrial units.
The targets/achievements for 9th Plan and
goals set for 10th Plan are given below:
(Rs. in Crores)
|
Programme |
IXth Plan Outlay |
Expdt. |
Physical Target |
Physical Achievements |
Xth Plan Outlay |
Goals set for Xth Plan |
Achievements |
|
Common
Effluent Treatment Plants |
4.50 |
1.50 |
Construction of CETPs in the Small Scale
Industrial clusters |
Since
the World Bank Projects has been over and that the CETP component has to be
funded out of GOI Budget, a new SFC has been prepared and approved during
2001-02. Therefore, Rs. 1.50 crores
only has been utilised. |
25.00 |
Construction
of CETPs in the Small Scale Industrial clusters |
Projects are being funded for construction of
CETPs and controlling the pollution load. |
55. REIMBURSEMENT OF WATER CESS
As per the provisions of the
Scheme, various SPCBs/PCCs in the country deposit the water cess in the
Consolidated Fund of India. As per the
revised formula effective from 1.4.1998 of water cess reimbursement to SPCBs/UT
PCCs, upto 80% of the cess amount collected by SPCBs/PCCs will be reimbursed to
them in accordance with Section 8 of the Water Cess Act, 1977 for meeting their
approved expenditure requirements. Of
the Cess amount collected, upto 20% will remain with the Central Government for
undertaking specific projects in any part of the country through the Central
Pollution Control Board (CPCB) subject to approval by the Central Government.
(Rs. in Crores)
|
Programme |
IXth Plan Outlay |
Expdt. |
Physical Target |
Physical Achievements |
Xth Plan Outlay |
Goals set for Xth Plan |
|
Reimbursement
of Water Cess |
Nil as it falls under Non-Plan. |
Nil |
Nil |
Nil |
Nil as it falls under Non-Plan. |
Since the expenditure is being met from the
Non-Plan budget and is made on the basis of the collection and deposit of
water cess in the Consolidated Fund of India, no outlay has been proposed for
X Plan. |
56. TAJ PROTECTION MISSION
In compliance with the Supreme Court orders dated
4.9.1996 in the Writ Petition No. 13381/84, the Planning commission estimated
(in consultation with the state Government) an amount of Rs. 600 crores on a
50:50 percent (Centre-State) matching basis to implement various schemes
relating to protection of the Taj Mahal.
The Ministry of Environment and Forests has vide
Notification S.O. No. 350(E) dated 17.5.1999 constituted an Authority known as
the Taj Trapezium Zone Pollution (Prevention and Control) Authority for
monitoring the implementation of various projects undertaken under Taj
Protection Mission Scheme. A Mission Management Board under the Chairmanship of
the Chief Secretary, Government of UP has also been constituted for overseeing
the implementation, monitoring and reviewing of the various programmes/schemes
formulated for the protection of the Taj Mahal. Schemes were submitted relating to uninterrupted power supply,
augmentation of water supply, improvement of drainage and sanitation etc. in
the context of environmental protection of the Taj Mahal.
Under the scheme Taj Protection Mission, 10 schemes
for Rs. 222.21 crores were approved by EFC in its meeting held on 26.10.1998
and CCEA approved on 23.2.1999. In the
second phase, six proposals were approved in the EFC meeting held on 13.2.2001
for a total cost of Rs. 220.1003 Crores.
However CCEA approval was not taken as the Ministry reviewed the
projects. In the third phase, seven
projects were submitted by the Govt of UP.
The draft EFC was prepared and circulated but the EFC could not be held
as one of the projects went into
litigation in the Hon’ble Supreme Court.
The targets/achievements for 9th Plan and
goals set for 10th Plan are given below:
(Rs.
in crores)
|
Programme |
IXth Plan
outlay |
Expdt. |
Physical
targets |
Physical
Achievement |
Xth Plan outlay |
Goals set
for Xth Plan |
|
Taj
Protection Mission |
200.00 |
124.50 |
Ten schemes had been stared under the
Mission. |
Schemes
under the Taj Protection Mission are identified/ prepared by the
Govt. of UP. |
170.00 |
To complete the on-going projects and to consider
new projects as and when submitted by the Govt. of U.P. |
57. ALL INDIA COORDINATED PROJECT ON
TAXONOMY (AICOPTAX)
A sound taxonomic knowledge
base is a prerequisite for environmental assessment, ecological research,
effective conservation, management and sustainable use of biological
resources, and bio-prospecting. It is the tool by which components of
biological diversity are identified and enumerated, and it therefore provides
the basic knowledge underpinning efforts to conserve biological diversity,
optimize the use of biological resources in a sustainable way, and thereby
enhance the quality of life.
At
this crucial juncture, when the need for a taxonomic stocktaking of the earth’s
biodiversity is becoming increasingly important and urgent, the taxonomic
expertise is aging and declining in number, both nationally and globally. This decline of taxonomic expertise is a
critical problem that needs to be addressed urgently.
Against
the above backdrop, the Ministry of Environment & Forests developed an All
India Coordinated Project for Capacity Building in Taxonomy during the Ninth
Plan.
The project comprised
establishment of Centres for Research in identified priority gap areas (e.g.
Virus, Bacteria, Microlepidoptera etc.) in the field of taxonomy, education and
training (fellowships, scholarships, Chairs, Career Awards etc.) and
strengthening of BSI and ZSI as the Coordinating Units.
The aim of the project was
to encourage excellence in the field of taxonomy and motivate the experts to
undertake work in hitherto neglected groups of organisms such as microbes,
lower groups of plants, animals etc.
Nine Centres for Research and two Centres for training and coordination
were identified during the first phase.
Simultaneously, steps were taken to strengthen Botanical Survey of India
and Zoological Survey of India so that these organizations could actively
participate in the taxonomic work.
The targets/achievements for
9th Plan and goals set for 10th Plan are given below:
(Rs.in crores)
|
Scheme |
9th Plan Outlay |
Exp. |
Physical targets |
Physical achieve-ments |
Xth Plan outlay |
Goals set for Xth Plan |
Achievements (from
1.4.2002 till 31.11.04) |
AICOPTAX
|
7.5 (RE) |
4.32 |
Establishment
of coordinating and collaborating units in ten subjects |
All the ten subjects were covered |
10.00 |
Continuation of the existing coordinating units
and collaborating units. Addition of
four subjects. |
The ongoing projects have been serviced. |
58. ENVIRONMENTAL
MANAGEMENT CAPACITY BUILDING TECHNICAL ASSISTANCE PROJECT (WORLD BANK AIDED)
The targets/achievements for 9th Plan and
goals set for 10th Plan are given below:
(Rs. in Crores)
|
Name of the Activity |
IXth Plan Outlay |
Expdt. |
Physical Target |
Physical Achievement |
Xth Plan Outlay |
Goals for Xth Plan |
Achievement |
|
ENVIRONMENTAL MANAGEMENT
CAPACITY BUILDING TECHNICAL ASSISTANCE
PROJEC |
100.00 |
73.00 |
* |
** |
48.98 |
*** |
**** |
*
Physical Target
**
Physical achievements
*** Goals for Xth Plan
**** Achievements
The tenure of the project has expired on 30-6-2004. The
objectives as envisaged have been achieved through local and foreign training
programmes, equipment purchased and installed and reports prepared,
monographs/books on environmental economics published, Infusion of
environmental concepts in school curriculum for 16 States completed, State-of
–art reports in research thrust areas progressed, activities under Integrated
Coastal and Marine Area Management completed, work on creation of website for
environmental economics completed, six recommendations after review of existing
policies for mining sector implemented and 19 institutions strengthened, 23
case studies on law prepared and 3598 persons from various institutions given
trained in environmental law, reports on projects in Gujarat for cleaner
production & sound environmental plans prepared, environmental awareness
among journalists under media training completed, the environmental clearance
process and compliance therewith has been improved by revising existing
procedures and practices of environmental clearance in India including
development of a National Guidance Manual of EIA practice with six support
manuals on select development projects, reports on industrial emission
standards for pesticides, oil refineries and petrochemical plants prepared,
Website have been setup on various aspects of environmental information,
capacity built in environmental planning and management and Environmental Atlas
of India published of environmental
information, 85 Nodes setup under Environmental Information System