CHAPTER II-C-1

 

 

REVIEW OF OVERALL PERFORMANCE DURING  2003-2004.

 

                 FORESTRY AND WILDLIFE

 

 

59           INDIAN COUNCIL OF FORESTRY RESEARCH AND EDUCATION (ICFRE), DEHRADUN

 

(Rs. in Crores)

Name of the Activity

B.E.

Actual Expdt.

Physical Target

Physical Achievem-ents

Reasons shortfall if any

 

Plan

Non-Plan

Plan

Non-Plan

 

General Component

32.49

10.28

32.56

10.28

                                              No

                       @                    Shortfall

Education & Training

2.50

1.1845

2.50

1.1845

 

Externally Aided Component

-

-

-

 

 

North-East

4.00

-

4.00

 

 

Total

38.99

11.4645

39.06

11.4645

 

 

 

 

@  Physical Targets & Achievements for Financial Year 2003-2004 :

 

 

Different institutes of ICFRE were running 249 Research Projects during the year under reference.  43 Projects were completed during the year and 45 New Projects were also initiated during this period.  Achievements made under these projects are reflected in the Annual Report for the year 2003-2004 .

 

 

ICFRE has developed and published training module for Committee Members and Forest Frontline Workers on Joint Forest Management (JFM), Forest Development Agency (FDA), Watershed, Micro Planning and Monitoring Issues as per the guidelines of the National Afforestation and Eco-Development Board (NAEB), Ministry of Environment and Forests, Govt. of India.

 

               

 Under the success stories of ICFRE, Environmental Management Plan consultancy extended to various Agencies viz. Studies on ecological studies for Bodhghat Hydro Electric Project, Distt. Dantewara, Chattisgarh.  Evaluated the compensatory afforestation raised by states / union territories, under NAEB and under IX plan of Integrated Afforestation and Eco-Development Project (IAEP), etc.  Successfully completed coastal shelter-belt plantation taken up during the year 2000-2002 under NAEB schemes, in 6 coastal districts of Orissa, evaluation of Loktak and Maklang watershed projects under IX plan of Integrated Afforestation and Eco-Development Project (IAEP) scheme.

 

 

 

ICFRE is a member of Climate Change Core Group of the Ministry of Environment and Forests, Government of India, regular updates on various issues pertaining to Land Use, Land Use change and Forestry (LULUCF) with a team of officers and scientists from ICFRE and its institutes.

 

 

 

 


60.          INDIAN PLYWOOD INDUSTRIES RESEARCH AND TRAINING INSTITUTE (IPIRTI),   BANGALORE

                                                                                                            (Rs. in Crores)  

Sl.

No.

Name of the Activity

BE

Actual

Expdt.

Physical

Target

Physical

Achievements

Reasons for shortfall, if any

1

Inputs to improve research capability in Labs. experimental plant at IPIRTI and

Research & Training in the field of Mechanical Wood Industries Technology.

3.90

1.51

Research and development work is being carried out on the projects as detailed under (A- On-Going Projects Sl. No. 1 to 14,

B – On-Going Sponsored Projects Sl. Nos. 1 – 9

C – New projects

Sl. No.1-6)

As detailed under E –  Projects Completed  during the year 2003-04 under (a-Institute's projects completed and report published), (b-Sponsored projects completed and reports submitted to the sponsors)

- NIL -

 

 

 

 

 

 

 

2

Establishment of Particle Board plant

1.085

-

 

Project proposal submitted to MOEF for financial assistance

 

 

TOTAL

 

 

4.985

 

1.51

 

 

 

A) Ongoing Institute's Research Projects for 2003-2004

 

1.                   Development of panel materials from woven coir mat / Non-woven coir felt  with Veneers and Bamboo Mats

2.                   Enhancement of  Utilization of Plantation Timbers through edge lamination

3.                   Study on preferential absorption  of chemicals in dip diffusion process of veneer treatment with fixed type of preservative – CCB

4.                   Development of Urea Formaldehyde resin with low formaldehyde emission for particle board

5.                   Design and Development of Mechanized Model of E-Tester

6.                   Effect of cyclic  tests on bending properties of composites from wood and other natural fibers including Bamboo (Phase –I :Plywood)

7.                   Effect of Age of Bamboo on strength properties of BMB and BMCS

8.                   Life cycle analysis of Bamboo Mat Corrugated Sheets (BMCS)

9.                   Development of improved powder PF resin for bamboo mat composites

10.                Establishment of National Information Centre on wood/non-wood  panel products and composites (NICWOOD)

11.                Development of  durable and dimensionally stable Block board using Plantation Timber:  An  IPIRTI – IWST collaborative project

12.                Development of Improved Cardanol Phenol Formaldehyde (CPF) Resin

13.                Development of PF resin adhesive incorporated with insecticide and fungicide for preservation of plywood

14.                Development of Ridges for BMCS Roofing System

 

B)       On-going Sponsored Projects (2003-04)

 

1.        Design and development of low cost houses using bamboo shelters in collaboration with TRADA Technology (DFID/KAR.7140)

2.        Field Demonstration & Development of bamboo based composites/panels or housing in NE region sponsored by MoEF (implemented in collaboration with BMTPC)

3.        Application of Finger Jointing techniques in Product Development using plantation species (BMTPC)

4.        Evaluation of suitability of plantation grown timbers form Tamilnadu for the manufacture of plywood (Sponsored by TN Forest corporation).

5.        Development of Transfer of Technology Model for Bamboo      Matchsticks sponsored by INBAR

6.        Evaluation of Bifenthrin against borers and termites for protection of wood and plywood

7.        Development of I-Beam using laminated veneer lumber made from plantation timbers and bamboo mat board – An exploratory study sponsored by BMTPC

8.        Up scaling of lab. Technology for making panels from banana sheath developed by Regional Research Laboratory, Trivandrum and approved by BMTPC

9.        IPIRTI-TIFAC joint study for preparation for techno commercial report on manufacture Bamboo Laminates

 

C)             Projects approved by PAC in the last held on 18-August 2003:

 

1.   Training cum Production centre for bamboo mats at Magadi, Bangalore-Rural, Karnataka.

2.    Development of techno-commercial proposal for alternate industrial uses of bamboo in Orissa.

3.    Study on the suitability of plantation grown timber received from Tamilnadu for the manufacture of general purpose plywood.

4.    Study of alternate test method for 72 hours boiling test prescribed for plywood and block-board in Indian standard specification.

5.    Development of modified flush door shutter to minimise the use of wood in flush door shutter manufacture and also for the efficient         use of flush door shutter as domestic and toilet door purposes.

6.   Investigation on the use of new environment friendly preservative chemical "Spinosad" for plywood protection.

 

D)        Projects approved for capacity building under 10th Five Year Plan, subject to availability of funds:

10.     Establishment of Research and Training Facilities for Manufacture of Particle Board.  Priority has to be given to take up this project as pilot plant building has already been constructed under IX Five Year Plan period.

11.     Up scaling of Technology for Bamboo Laminates for furniture and structural uses

12.     Strengthening of facilities for testing of composites from wood and other natural fibres including bamboo

13.     Establishment of Mobile Saw Doctoring Unit for Training and Demonstration.

 

E)       Projects completed during the year 2003-04

 

a.           Institute's Research projects and reports completed for year 2003-04

 

Sl.

No.

Research

Report No.

Title of the Report

1.

124

Computerized Bibliographical data on wood adhesives – World literature (1980-1999) (SORIT-03/1992)

2.

125

Development of glued laminated timber using plantation grown species for structural and non-structural uses  (PASD-22/96)

3.

126

Development of E-Tester for large size wood based panel material  (WC/Testing/04/2000)

4.

127

Laminated veneer lumber for plantation timber for rails and stiles frames for furniture/joinery (LP/LVL/03/2000)

 

b.          Sponsored  Research projects and reports  submitted to the sponsors for year 2003-04

 

1.                Evaluation of Lindane 20EC as glueline additive for protection of plywood

2.                Evaluation of Dursban 50 WT as a glue line additive (Project Code No.  SP-21/1999)

3.                 Development of technology for making products from Chir pine needles project sponsored by Himachal Pradesh State Forest Corpn.(Project Code No. SP-29/NWC/2001)

4.                Exploratory investigation to develop moulded articles from coir non-woven   felt SponsoredbyCoir Board, India (Project Code No. SP- 32/NWC/2001)

5.         Development of Marine shuttering and film faced plywood from Silver Oak (Gravillea Robusta) sponsored by M/s.Tata Coffee Ltd. (Project Code No. SP-33/WC/2001)

6.             “Transfer of Technology Model (TOTEM) for Bamboo Match sticks” sent to INBAR   (Project 

                code No. SP-34/2001)

7.             Development of window/door frames from small size Sal poles using finger jointed    and

                lamination techniques sponsored by West         Bengal Forest Development Corporation (Project

                Code No. SP-36/LP/2002)

 

61.          INDIAN INSTITUTE OF FOREST MANAGEMENT (IIFM), BHOPAL

 

(Rs. in crores)

Name of the activity

BE

Actual Expdt.

Physical

Target

Physical achievement

Reasons for short

fall if any

MDP/Courses & Seminars

 

4.00 (Plan)

0.83 (Non-Plan)

 

 

 

 

 

 

 

 

 

4.00 (Plan) 0.82 (Non-Plan)

 

 

 

 

 

 

 

 

 

 

 

22MDP

11,Workshop& seminar

 

        Nil

PGDFM/MRM

 

37,students in PGP and 20,students in MRM

 

        Nil

Ph.D/Research studies/Consultancy

Ongoing Research Projects will be completed and some new projects have been started.,5 student registered for PHD.

Manpower(Salary and wages) and other Expenditure

 

 

 

 

762, Books and 200 Journals have been subscribed.

Funds for Construction

Library

 

 

 

62.          STATE FOREST SERVICE AND RANGERS TRAINING COLLEGES

(Rs. in Crores)

Name of the Activity

BE

Actual Expdt.

Physical Targets

Physical Achievements

Reason for shortfall, if any,

State Forest Service and Rangers Training colleges

#1.00+

0.50*

0.92

+

0.50*

-

-

-

a) Training of SFS officers in SFS Colleges, Dehradun.

 

-

1 Course

1 Course

No shortfall.

2002-2004 batch passed out on 31st March, 2004 while 2003-2005 batch is under training w.e.f. 1-4-2003 in 1st year.

b) Training of Forest Rangers at SFS College, Coimbatore, Burnihat &  EFRC, Kurseong.

 

-

3 Courses

3 Courses

No shortfall.

(i) 2 batches of 2001-03 passed out and 2 batches of 2002-04 are in the 2nd year of training and will passed out in Nov., 2004.

(ii) 3 batches 2003-05 for the newly recruited RFO started from November, 2003.

c) Refresher Courses for in-service SFS officers with 30-35 participants each

 

-

7 Courses

6 Courses

One course could not be conducted because states did not utilize their allotted seats.

d) Courses on Computer Application in Forestry for in-service SFS officers with 25-30 participants each.

 

-

7 Courses

7 Courses

No shortfall.  Target fully achieved.

e) Advance Courses on Computer Application in Forestry for in-service forest officers with 30-35 participants each.

 

-

4 Courses

4 Courses

No shortfall.  Target fully achieves.

f) Theme based courses in forestry for In-service SFS Officers with 25-30 participants each.

 

-

7 Courses

5 Courses

2 courses could not be conducted because states did not utilize their allotted seats.

g) Two weeks “Trainers Training Course” with 20 participants for each course

 

-

2 Courses

2 Courses

No shortfall.  Target fully achieved.

h) Two weeks “Refresher Course” for Range Officers (30 participants each).

 

-

2 Courses

2 Courses

No shortfall.  Target fully achieved.

i) Two weeks “Refresher Course” for in-service Deputy Rangers, Foresters and Forest Guards with 30-35 participants in each course.

 

-

3 Courses

3 Courses

No shortfall.  Target fully achieved.  These courses were allotted by the Ministry for the first time during 2003-04 in addition to target fixed for 2003-04.

j) Forestry Courses for sister & other organization on request.

 

-

2 Courses

1 Course

Demand for only one course was received.

l) Seminars/Workshop on Forestry related issues.

 

-

3

-

 

# Out of Rs. 1Crore, Rs.5 Lakh allotted to this Directorate under budget head 04.00.01-Salaries (Plan), was surrendered to the Controller of Accounts, MOEF, New Delhi vide this office letter No.3-53/Acct./DFT/2003/2577-79 dated 19-12-2003.

* Fund is at the disposal of Civil Construction Unit.

Note: A proposal for conducting six week promotion linked course for ACF/RFOs was sent to the Ministry for approval.  As and when approval is received, courses will be conducted.

 

 

63.          IN-SERVICE TRAINING FOR IFS OFFICERS

 

                 (Rs. in Crores)

Name of the Activity

BE

Actual Expdt.

Physical Target

Physical Achievements

Reasons for shortfall, if any

One/two-week Compulsory Training course for IFS officers

1.00

1.00

100%

100%

NA

 

 

64.          INDIRA GANDHI NATIONAL FOREST ACADEMY (IGNFA)                                

                                                                                                                                               

(Rs. in Crores)

Name of activity

BE

Actual Expdt.

Physical targets

Physical Achievement

Reason for shortfall if any

IGNFA

2.74 (Plan)

2.81 (Non-Plan)

2.64 (Plan)

 

2.37 (Non-Plan)

Training of IFS Officers of 10, 17 and 21 years of seniority.

 

Training of IFS Probationers of 2001-2004, 2002-2005 and 2003-2006.

*

Nil

 

* Physical Achievements      

 

  1. During this period 27 IFS probationers of 2002-2005 course underwent professional phase of training.
  2. 25 IFS probationers of 2003-2006 course are undergoing Foundation Course at LBSNAA at Mussoorie.
  3. The on-the-job training of 22 IFS probationers of 2001-2004 course underwent On-the-job training in different States and UTs.
  4. The library facilities were improved to meet the needs of training.
  5. The infra-structural facilities at the academy like communication network and computers etc. were upgraded.
  6. Amenities in the probationers hostels improved to some extent.
  7. Class rooms facilities upgraded by adding modern training aids.

 

65.                FOREST SURVEY OF INDIA (FSI), DEHRADUN

 

(Rs. in crores)     

Name of the activity

BE

 

Actual Expdt.

 

Physical Target

Physical Achievements

Survey and Utilization of Forest Resources

9.95

9.61 

 

 

Activity

 

 

 

 

(a)Procurement of cloud

Free Satellite Data

 

 

315 Satellite Scenes

       

        286

 

(b) Rectification of Satellite Data Geo-reference on SOI Toposheet.

 

 

 

315 Satellite Scenes

         286

 

(c)Interpretation (classification ) of Satellite Data through Data Image processing (DIP) 

 

 

 

315 Satellite Scenes

         286

(d)Ground Truthing / Ground Verification

 

 

 

         

        259

(e)Incorporation of corrections, change detection and area calculation.

 

 

200Toposheets (on 1:250,000scale)

 

(a) Forest Inventory

 

 

   30Districts

         30

(b)  TOF  (Rural)

 

 

   30Districts

         27 

(C) TOF Urban 

 

 

   30Districts

         30

(d)  Data Processing

 

 

   30Districts

          -

(e)   Training

 

 

  100 Officials

        154

 

 

66.                FOREST PROTECTION AND REGENERATION

 

(Rs. in Crores)

Name of the

Activity

BE

Actual

Expdt.

Physical

Target

Physical

Achievement

Reasons for

shortfall, if any

Integrated Forest Protection Scheme (IFPS)

66.00

25.40

To assist all States & UTs for fire protection, Infrastructure Development for forest protection  & preparation of Work Plan & Survey & Demarcation of forest areas

All states were assisted for taking effective steps for prevention & control of Forest fires, development of infrastructure for forest protection and preparation of working Plan and Survey Demarcation of forest areas.

Funding pattern of the Scheme was changed from  100% Centrally Sponsored to 75%:25% cost sharing between Centre and the states during financial year 2003-04.

 

 

67.                FOREST CONSERVATION

 

(Rs. in Crores)

Name of Activity

BE

Actual

Expenditure

Physical

Target

Achievement

Reasons for shortfall it any

Financial

 

Revenue

 

Capital

 

 

5.00

 

2.00

 

 

4.765

 

2.00

 

 

 

1. Monitoring of projects approved under FCA 1980 for compliance of stipulated conditions

 

 

950

750

Posts are laying vacant

2. Monitoring of projects approved under FPA, 1980 for compliance of stipulated conditions.

 

 

400

2900

 

3. Disposal of proposals for diversion of Forest land up to 40 ha land under FC 1980

All cases received from the user agencies through State Govts. for diversion of forest land within six weeks.

4. Site inspection of projects in all State/Uts.

All cases referred by the Ministry within 30 days.

5. Participation in the other meeting at State/Uts

All working plans referred by the State Govt. to Regional Offices to be finalized within 2 months as per the Ministry’s Guidelines.

6. Assisting Paryavaran Vahin in the capacity of observer and technical advisors.

All work.

 

 

          WILDLIFE

 

 

 

68.                STRENGTHENING OF WILDLIFE DIVISION AND CONSULTANCIES FOR SPECIAL TASKS

 

 

(Rs in. Crores)

Name of the activity

BE

Actual Exp.

Physical Target

Physical

Achievement

Reasons for short fall , if any

Strengthening of Wildlife Division and Consultancies for Special Tasks

2.00

2.00

No physical target can be taken as Regional Offices salary, Office expenditure and domestic travel expenditure are being paid under this scheme. Funds are also provide for consultancies for special taks as and when there is a proposal for the same.

--

--

    

                               

 

 

 

69.                ASSISTANCE FOR  DEVELOPMENT OF NATIONAL PARKS AND SANCTUARIES

 

 

 

(Rs. in Crores)

Name of the activity               

BE

Actual Exp.

Physical

Target

 

Physical

Achievement

 

Reasons for short fall, if any

Assistance for Development of National Parks/ Sanctuaries

37.00

43.187

280 PAs

269 PAs

Limited availability of budget.

 

 

 

 


70.              WILDLIFE INSTITUTE OF INDIA (WII)

(Rs. in Crores)

Name of the Activity

BE

 

Actual

Expenditure

 

Physical Target

Physical Achievement

Reasons for Short falls if any

WII

11.57

11.57

 

 

 

M.Sc. Course in Wildlife Science

 

 

12

8

No response from self sponsored person

PG Diploma in Wildlife Management

 

 

30

18

Due to poor response from State Govt.

Certificate Course in Wildlife Management

 

 

30

20

Due to poor response from State Govt.

Research Projects

 

 

24

24

 

 

 

 

 

71.    PROJECT TIGER

 

(Rs. in Crores)

Name of the Activity

BE          

Actual Expenditure

Physical target

Achievements

 

 

Project Tiger

Rs. 25.50 crores +

Rs. 3.00 crores for NE Region

Rs. 28.55 crores  including Rs. 3.67 crores to NE Region.               

To continue to provide Central Assistance to the 27 Tiger Reserves under the Project Tiger Scheme.

Based on the Annual Plan of Operations containing physical targets submitted by the State Governments Central Assistance was released and implementation was monitored.

 

 

 

 

2.                C.S.ECO- DEVELOPMENT SCHEME General Component

(Around National Parks and Sanctuaries including Tiger Reserves)

 

 

Merged with Project Tiger Scheme during Xth Five Year Plan

 

 

 

 

 

3.      C.S.BENEFICIARY ORIENTED SCHEME FOR TRIBAL DEVELOPMENT

 

Merged with Project Tiger Scheme during Xth Five Year Plan

 

 

 

 

 

 

72.          INDIA ECO-DEVELOPMENT PROJECT

 

(Rs. in Crores)

Name of the Activity

BE

 

Actual expdt.

 

Physical Target and Achievements

Reasons for shortfall,  if any

India Eco development Project 

28.00

13.34

Assistance was provided to seven Project States. The expenditure was incurred on the activities  namely, Eco-system Management, Habitat Protection And Management

(i)                               Survey and Demarcation

(ii)                              Baseline Mapping

(iii)  Microplanning for Villages

(iv)                            Management training and Study Tours

(v)                             Implementation support and Supervision

(vi)                             Environmental Education & Awareness activities

(vii)                           Impact Monitoring And Research Activities which include Support Facilities

(viii) Civil Works, Vehicles, Transport and Procurement of Equipment.

 Most of the activities under village eco-development Programme to be implemented by the Eco development committees for each village in and around PAs (numbering 572 villages in all the PAs) are at various stages of implementation.  It is being continuously and intensively monitored by the Review Missions of the World Bank, Director/Addl. Director (PT) and by an independent   body i.e. JPS Associates from time to time.

Less demand by States.

 

 

 

73.    PROJECT ELEPHANT

(Rs. in crores)

Name of the activity

BE

Actual Expdt.

Physical Target

Physical Achievements

  Project Elephant

Plan

 

12.00

Plan

 

13.11

As proposed by  States in A.P.O

Funds released to 12 States where 24 Elephant Reserves have been declared.

 

 

74.    CENTRAL ZOO AUTHORITY (CZA)

(Rs. in crores)

Name of the Activity

    B.E.

Actual Exp.

Physical Target

Physical Achievements

Reasons for shortfall if any

  Central Zoo Authority

 

   15.49

 

 

     15.49

As indicated below

As indicated below

As indicated below

 

@Physical Target for 2003-2004

 

To evaluate zoo with reference to norms and standards specified under the Recognition of Zoo Rules,1992 and to recognize / de-recognise zoos under the provisions of Wildlife (Protection) Act.

To provide technical and financial assistance to the zoos having potential, to achieve the desired standards as provided in the rules. To provide proper housing as well as feed and upkeep facilities to the animals received from circuses /from the zoos refused recognition and also. .

To conduct training and workshops for the Zoo personnel to exchange their views and upgrade their skill.

 

 Physical Achievements for 2003-2004

 

1.                    Entire  allocation of Rs. 1549.00 lakhs have been fully utilised for the    furtherance of the objectives assigned  to CZA.

2.                    An amount of Rs.3.02 lakhs was spent on monitoring and evaluation of zoos in the country. Zoos were evaluated with reference to the standards and norms and  granted  recognition with suggestion for further improvement. Renewal of recognition of other  Zoos were withheld pending compliance of conditions of recognition.

3.                    Financial assistance of Rs.864.33 lakhs was provided to 25 zoos for improvement of housing, upkeep and veterinary care of animals etc.

4.                    Financial assistance of Rs.238.61 lakhs were provided  towards feed and upkeep of rescued circus animals kept in Rescue Centres.

5.                    Financial assistance  of Rs.70.30 lakhs were provided to Veterinary Colleges at Anand Gujarat and Guwhati for upgradation of their clinical and diagnostic facilities. 

6.                    Training courses & workshops were organized for upgrading skills of the zoo personnel.  Rs.40.28 lakhs was spent for this purpose. 113 Zoo Personnel were trained. One zoo director and one veterinarian were also sent to UK for specialized training in zoo management. An international workshop was organized on “ Health Care Management Of Wild Animals In Zoos”. 

7.                    The administrative/ operational cost of the Central Zoo Authority for carrying out all these activities was Rs.48.62  lakhs, which comes to less than 5% of the total outlay.

 

 

 Reasons for Shortfall if any:

 

 

 CZA utilised the entire  budget allocation for the purpose for which it was sanctioned. There

was no shortfall in the performance of CZA.

           

 

 

 

 

 

 

75.        NATIONAL ZOOLOGICAL PARK (NZP)

 

(Rs in Crores)

Name of the Activity

BE –Plan

Actual

& Plan

Physical Target

Physical Achievement

Reason for shortfall  if any

Development

Activity in National Zoological Park.

2.15

2.15

i) Revival of channel No.15

ii) Celebration of Wildlife Week & Van Mahaotsava

iii) Conduction of various seminars  & Teacher Oriented Programme

iv) Publication of Guide Map, Annual Report, Stickers etc.

v ) Preparation of Signage.

vi)  Maintaining the Health & Hygienic Environment for Zoo Animals.

vii) Exchange of various animals with India & Foreign Zoo for Plan Breeding  Project.

viii)Upkeep of animals and their enclosure.

ix) Providing facilities to the visiting public.

**For the Capital construction work  executed through CCU / CPWD, the funds will be provided by Central Zoo Authority .

Except revival of Channel No.15 all other targets achieved in full

Rs 142.80 lakhs for revival of Channel No.15, e was placed at the disposal of MCD.  However due to lack of coordination between different agencies involvement , the work could not be started up. 

 

 

76.     PROTECTION OF WILDLIFE OUTSIDE PROTECTED AREAS

 

(Rs. in Crores)

Name of the activity

BE

Actual Expenditure

PhysicalTarget*

Physical Achievements*

Reasons for shortfall, if any

Protection of wildlife outside protected areas

5.00

Scheme not approved by Planning Commission

NIL

NIL

-

 

* As the Scheme was not approved by the Planning Commission, funds could not be released to                       States. Physical target & Achievements may therefore be treated as Nil.

 

77.    ANIMAL WELFARE DIVISION

(Rs. in Crores)

Name of the Activity

BE

Actual Expdt.

Physical Target

Physical Achievements

Reasons for shortfall, if any

AWBI

4.50(P)

0.53(NP)

4.95 (P)

0.68(NP)

-

Grant to 842 organizations

More amount was provided at RE stage both in Plan and Non-Plan

Shelter

6.50

2.87

26

36 Proposals have been approved (Generally  for one shelter house the organization is given grant in two installments)

Receipt of in complete proposals and non receipt of inspection reports

Ambulance

.45

0.49

12

13 Proposals have been approved

More amount was provided at RE stage

ABC

2.50

1.69

56,179(Dogs)

37,977 (Dogs)

Receipt of in complete proposals and non receipt of inspection reports

NIAW

3.00

1.30

Construction of Main Infrastructure

Most of the Building Work Competed

The construction work was to be implemented through CCU. CCU expressed its inability to utilize full amount.

CPCSEA

0.45

0.45

-

Zonal Workshops –

Nominee Workshops –

Inspection of Animal Houses -

 

Natural Calamity

0.30

0.30

-

3 states were given grant

 

Scholarship

0.45

0

-

-

 

 

 

78.                NATIONAL AFFORESTATION & ECO-DEVELOPMENT

 

(Rs. in Crores)

S.No

Name of Activity

B.E.

 

Actual

Exp.

 

Phy. Target (Ha.)

Phy. Ach.(Ha.)

Reasons for shortfall if any

1

2

3

4

5

6

7

1

National Afforestation Programme (NAP)

196.00

225.53

1,25,000

2,83,642**

 

2

National Afforestation Programme to Combat Desertification

2.00

Nil

N.A

N.A

 

3

Greening India

1.00

Nil

N.A.

N.A

Scheme not approved.

4

National Afforestation & Eco-development Board (NAEB)

 

 

 

 

 

 

a. Grants-in-Aid to voluntary Agencies

7.14

8.49

-

 

177 projects

8,744 ha.**

 

 

b. Monitoring & Evaluation

 

 

0.75

1.75

 

Evaluation of 50 FDA projects, IX Plan Scheme Projects

Evaluation of 50 FDA projects, IX Plan Scheme Projects

 

 

c. Communication

0.66

 

0.86

IPVM Award 2001 & 2002.

IPVM Award 2001 & 2002 to be processed

 

 

d. Support to Reg. Centres.

1.60

 

1.80

7 Reg. Centres

7 Reg. Centres

 

 

e. Professional & Special Services

 

0.07

0.06

Compilation of IX plan Eval. Studies

Compilation of IX plan Eval. Studies

 

 

f. Board Secretariat

 

2.78

2.55

 

-

-

 

5

Eco-Dev Forces (EDF)

8.00

9.94

4ETF battalions

1358 ha.

4 ETF battalions

1478 ha.

 

TOTAL

220.00

250.54

 

 

 

 

** This is the total area of the projects approved during the year 2003-04.

 

 

79.                    NATIONAL RIVER CONSERVATION DIRECTORATE

 

                                                                                                                                                                (Rs. in crores)

 

Name of the

Activity

BE

 

Actual

Expdt.

 

 

Physical Target

(no. of schemes)

Physical

Achievements

(no. of schemes completed)

1.NRCD(Estt.)

6.00

6.56

 

 

 

1.                   2. NRCP

 

244.00

   

219.18

 

No specific target was fixed.

 

Total no of Sanctioned projects from the beginning till 31.03.2003 were 770 and completed 386 In addition 49 new projects sanctioned  during the year

86      Projects have been completed between 1.4.03 and 31.03.2004

 

3. NLCP

45.00

20.00

5

3

Total

295.00

245.74

 

 

 

ACHIEVEMENTS (2003-2004):

 

A capacity to treat 228.89 mld of sewage was created during this year under NRCP

 

New Proposals approved during 2003-04:

Pamba town in Kerala costing Rs. 18.44 crore was taken up for pollution abatement programme

Hyderabad town in Andhra Pradesh costing Rs. 344.08 crore was taken up for pollution abatement programme

Yamuna Action Plan Phase-II costing Rs.624.00 crore was taken up for pollution abatement programme

Gomti Action Plan Phase-II costing Rs.263.26 crore was taken up for pollution abatement programme

 

 

 

                 ECOLOGY AND ENVIRONMENT

 

 

80.                BOTANICAL SURVEY OF INDIA (BSI), CALCUTTA

 

(Rs. in Crores)

Name of the activity

Budget Estimate

Actual Expenditure

Physical Target

Physical Achievements

Reasons for

Short

fall, if any

 

Plan

Non Plan

Plan

Non Plan

 

 

 

BOTANICAL SURVEY OF  INDIA (Survey, Inventorisation & Conservation of floristic diversity of India)

6.5

12.62

5.96

10.56

-

-

-

1.  Collection of Specimens

NA

NA

NA

NA

Target cannot be fixed

Collected ca 9,500 field nos. including lower groups of plants viz. Algae, Fungi, Lichens, Bryophytes and Pteridophytes.

NA

2.  Preservation of specimens

NA

NA

NA

NA

-do-

Preserved ca 5,600  specimens

NA

3.  Specimens identified

NA

NA

NA

NA

-do-

Identified ca 3,900 specimens

NA

4. Documentation of Phytodiversity

(National Flora

Regional Flora

State Flora  &District Flora)

NA

NA

NA

NA

436 species belonging to 14 families for National Flora and 3235 species of 9 State Flora.

Work on 400 species of 14 families for National Flora and 2895 species of 9 State Flora completed.

Shortfall due to shortage of manpower

5. Documentation of Phytodiversity

(National Flora

Regional Flora

State Flora  & District Flora)

NA

NA

NA

NA

436 species belonging to 14 families for National Flora and 3235 species of 9 State Flora.

Work on 400 species of 14 families for National Flora and 2895 species of 9 State Flora completed.

Shortfall due to shortage of manpower

6. Documentation of Traditional knowledge of plants (Ethno-botanical Studies)

NA

NA

NA

NA

Documentation of traditional knowledge of plants form Sambalpur district of Orissa, Darjeeling and Jalpaiguri districts of West Bengal and Jharkhand state

Documented traditional knowledge of 108 plants collected from Sambalpur, Darjeeling and Jalpaiguri districts.

Work on Jharkhand State could not be started as the scientist concerned met with an accident and is bed ridden.

7. Ex-situ conservation of endangered, endemic, economic & ornamental plants

NA

NA

NA

NA

Target cannot be fixed

Germplasm of 25 rare, endangered and wild relatives of ornamentals & medicinally important plant species conserved, multiplied & maintained. 15 rare/ threatened, 65 medicinal/economic important and 65 ornamental plant species introduced for ex-situ conservation.

NIL

8. Publications

(Books & Journals)

0.11

0.01

0.16

NIL

9 books and 2 journals

9 books (including 3 books in press) and 3 journals (including one Journal published in Hindi)

Printing of three books is delayed by press due to technical problems

 

 

 

81.                ZOOLOGICAL SURVEY OF INDIA (ZSI), CALCUTTA

 

(Rs. in Crores)

Name of Activity

B E

Actual Expndt

Physical Targets

Physical Achievements

Reasons for shortfall

ZSI

5.90

5.86

Exploration & Survey of State Fauna, Ecosystem – 80 surveys

80 Surveys completed

 

 

Nil

 

 

 

Status Survey of Endangered Species –  14 surveys

13 surveys

1

Due to non receipt of  permission from Forest Authorities to visit Protected Area

 

 

 

Taxonomic studies

Manuscript of two ecosystems and two states is in printing stage and one study is in progress

Nil

 

 

 

Publication – 30 books

42 books published :

Two vol. of  Fauna of India published

Records of ZSI Vol. 102(part3-4)publsihed

State Fauna – 6 vol. Published of two states

Ecosystem – 3 books published

Fauna of Conservation Area - 3 books Published

Handbook & Field guides  – six Published

Occasional Papers – 14 books published (No. 211-225)

Others – 3 books published

Delay in printing by the Govt. Press caused delay in time target

 

 

 

Training Programme

2 conducted

Nil

 

 

 

Sale of  Publication

Rs. 7.00 Lakhs

Nil

 

 

 

E I A Studies

Two completed

Nil

 

 

 

Computerisation

50,000 data entries

Nil

 

 

 

ENVIS

One News letter publishe

Nil

 

 

82.   NATIONAL MUSEUM OF NATURAL HISTORY (NMNH)

(Rs. in Crores)

Name of the activity

B.E.

Actual Expdt.

Physical target

Physical achievements

Reasons for short-fall, if any

National Museum of Natural History,

New Delhi

7.00

(include-ing Rs. 2.50 crores for capital section)

6.70

Acquisition of land and construction of building for NMNH.

 

 

 

Creation of infrastructure and updating the exhibits

 

 

 

 

 

Continuation of Educational & Extension services.

Not achieved.  The matter is being pursued by the Ministry of Environment & Forests.

 

In order to develop the galleries, the School of Planning & Architecture has been appointed as Consultant. The report has been received and is under scrutiny.

 

Achieved.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 


Regional Museum of Natural History,

Mysore

 

 

Planning, designing & preparation of Exhibits for 2nd Phase Gallery development.

Work in progress.

 

 

 

 

Educational activities and extension services for School children and various Educational Institutions.

Published Museum Literature on various topics in Kannada.

Achieved

 

 

 

 

 

 

Achieved

 

 

 

 

 

 

 

 

 

 

 

Regional Museum of Natural History, Bhubaneswar

 

 

Establishment of Office, Technical block, Reserve Collection Room and Library.

 

Preparation of theme based exhibits for Ist Phase Gallery, Discovery Center.

 

Simultaneously planning for North-East, Evolution and conservation Galleries in 2nd phase.

 

 

 

 

Taking up of Popular publications for Environment Educational Activities.

 

 

Collection, acquisition and documentation of display materials along with initial planning of digital Photo-Lab.

 

 

 

 

Furnishing of conference hall with public address system.

Achieved.

 

 

 

 

 

Achieved.

 

 

 

 

 

Theme pertaining to Gallery develop-ment is already under way. Collection and modelling of display material for Conservation Gallery in progress.

 

A Museum Brochure both in English and Oriya, has been published.  Photographs of Campus diversity already displayed in the Museum.

 

Collection, acquisition of display mat-erial has been achieved. Few specimens are received from RMNH, Mysore and Nandan Karan from local collection.  Photo documentation in progress.

 

Furnishing completed. Public address system needs to be procured and installed.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Priority was targed for inauguration.  In respect of Public address System may be taken up in next Financial year.

 

 


 

Regional Museum of Natural History,

Bhopal.

 

 

Discovery Center

 

 

Renovation of 1st  Phase

Gallery.

 

Setting up of Bioscience Computer facility.

 

Development of Central Courtyard Exhibits.

 

Educational & extension programmes.

 

Planning for 2nd Phase

Gallery.

 

Achieved.

 

 

Partly achieved.

 

 

 

Achieved

 

 

 

Work in progress.

 

 

 

Achieved.

 

 

 

Not achieved

 

 

 

 

Due to Air-conditioning  work in Galleries

 

 

 

 

 

 

 

 

 

 

 

 

Due to air-conditioning works by CCU.

 

83.                ENVIRONMENTAL EDUCATION, AWARENESS & TRAINING

 

( Rs. in  crores)

S.No.

Name of the activity

BE

Actual exp

Physical Target (upto Nov. 04)

Physical

Reasons for shortfall, in any

1.

Env. Edu. & Trg.

 

 

i) National Environment Awareness Campaign@ (NEAC)

 

 

 

ii) Eco-clubs@

 

(iii) Seminars/Symposia/Workshops@

 

 

(iv) Grant in aid to Professional Societies & Institutions and publication of resource material.

17.0

18.99

 

 

 

4.38

 

 

 

 

Different activities under the campaign

The campaign is in advance stage and would be completed in time

NIL

 

-

7.70

-

 

 

 

-

 

 

-

0.325

 

 

0.024

 

 

-

 

 

New proposals will be considered.

Projects funded earlier will be monitored and remaining grant released.

108

NIL

@ No separate allocation has been made for these programmes.

 

 

 

84.   ENVIRONMENTAL INFORMATION SYSTEM (ENVIS)

 

(Rs. in crores)

Name of the Activity

BE

 

Actual Expenditure

Physical Targets/ Achievements

ENVIS

2.712

2.5

*

 

* Physical Targets/ Achievements

 

-                      25 ENVIS-Centres have been set up so far on subject-areas related to environment were funded during the year.  All the ENVIS Centres have developed their web site and information can be accessed through internet directly. All the 25 centres also publish Envis news letter regularly.

 

-                      The home-page of the Ministry at URL : http./envfor.delhi.nic.in is updated by ENVIS periodically . Query–response service is also being provided.

 

-                      ENVIS continues to publish a quarterly newsletter namely ‘Enviro News’ reporting various programmes, achievements, laws rules, clearances etc.  Four issues of the Newsletter were published during 2003-2004.

 

-                      Two volumes of Paryavaran Abstract were also published.

 

-                      ENVIS successfully implemented the Sustainable Development Networking Programme (SDNP) supported by UNDP and IDRC, Canada.  A web site at URL: http.//sdnp.delhi.nic.in   has been developed and is regularly updated.

 

-                      The Environmental Management Capacity Building Project (EMCB) for strengthening ENVIS under World Bank assistance is being implemented with effect from 1.1.2002.  85 ENVIS Nodes have been set up so far in Institutions and NGO’s specialised in various subject areas related to environment.5 New Nodes are to be set up. The project had also been extended till 30-6-2004.

 

-                      The SFC Memo of the existing ENVIS Scheme has been modified and approval of Secretary(E&F) has been obtained.

 

-                      Annual Report of the Ministry (2003-2004) was published by ENVIS.

 

-                      A new website www.envis.nic.in was designed, developed and launched on 5th June 2003 by the Hon’ble Vice President of India. The site connects 59 of the 85 Nodes which also publish ENVIS -Newsletter.

-                      A compendium on the ENVIS-Centre activities has been compiled and is being published.

-                      For monitoring the activities of the Nodes, 7 Technical Committees have been constituted. Out of 55 subject specific nodes 42 have been visited so far.

 

-                      3 training courses and 2 performance evaluation workshops were held for the established Nodes.

 

85.    CENTRES OF EXCELLENCE

                                                                                               (Rs. in Crores)

Name of the scheme

BE

Actual Expdt.

Physical Target and Achievements

 

CENTRES OF EXCELLENCE

8.00(P)

1.35 (NP)

7.60 (P)

1.48 (NP)

There are nine Centres of Excellence under the Scheme, in different thrust areas of environment.  All the Centers continued their ongoing activities in respective fields, as approved by respective Governing Councils/Board of Governors.

 

 

86.                NATIONAL NATURAL RESOURCES OF MANAGEMENT SYSTEMS (NNRMS)

 

(Rs. in Crores)

Name of the Activity

BE

 

Actual Expenditure

Physical Targets/ Achievements

NNRMS

1.50

1.5

**

 

 

** Physical Targets/ Achievements

 

-                      On-going projects and six new projects under the areas have been supported under the schemes. 

 

-                 Monitoring of the on-going projects has been taken up so far.

 

87.                ENVIRONMENTAL IMPACT ASSESSMENT.

 

(Rs. in Crores)

Name of the Activity

BE

Actual

Expdt.

Physical

Target

Physical

Achievement

Environment Impact

Assessment

2.80

2.78

 The target set   for EIA  is that the  proposals received for environmental clearance in the  identified sectors have  to be considered and decision taken within a period of 120 days after submission of  complete information by the project  authority. This target is generally adhered to.

Project cleared – 266

 

Project

Pending- 164

Total    -400

 

 

 

88.          CLEAN TECHONOLOGY

 

(Rs. in crores)

Name of the Activity

BE

Actual Expdt.

Physical Target

Physical Achievements

Reasons for short-fall in any

Development and promotion of clean technology

3.50

.8544

To take follow-up action on the out come of various studies undertaken under this Programme.

 

* The results of various studies were circulated amongst all the stakeholders for follow-up action.

 

 

Due to non receipt of utilisation certificates and receipt of incomplete proposals  funds could not be released as targeted

 

89.  INDUSTRIAL POLLUTION ABATEMENT THROUGH PREVENTIVE STRATEGIES

 

(Rs. in Crores)

Name of the Activity

B.E.

Actual Expenditure

Physical Targets

Physical Achievements

Reasons for short fall, if any

Industrial Pollution Abatement through Preventive Strategies

100.00

30.23

Preparation for

environmental audit update sectoral guidelines

All the projects on environmental audit, mapping, baseline information in Kaveri Basin, Waste Minimisation project etc.

 

 

90.                    ASSISTANCE FOR ABATEMENT OF POLLUTION AND ENVIRONMENT POLICY & LAW

 

(Rs. in Crores)

Name of Activity

BE

Actual Expdt

Physical Targets

Physical Achievements

Reasons for shortfall, if any

I.  Assistance for Abatement of Pollution, Environment Policy & Law 

Environment Policy & Law

0.25

0.4492  (The outlay was subsequently increased to 35.00 lakhs.  The amount utilised over and above the outlay was met from the Major Head Assistance for  Abatement of Pollution, environment Policy & Law)

Environment Policy & Legislation

 

 

Formulation of Draft National Environment Policy

The Ministry initiated the process of formulation of a "National Environment Policy (NEP) . The task of preparing a base paper on the draft NEP was assigned to The Energy Research Institute (TERI).

 

 

 

 

Amendment of Environment (Protection) Act, 1986

A draft Bill prepared for amendment of Environment  (Protection) Act, 1986

 

Under process

 

 

 

Integration of Economic Instruments to internalise the cost of pollution and conserve resources, particularly, water

With a view to integrate  Economic Instruments to internalise the cost of pollution and conserve resources, particularly, water, a Study was assigned on "Estimation of Pollution Load and Abatement Cost in Select Industries" for the purpose of Water Cess  to  National Institute of Public Finance & Policy (NIPFP) which  was completed during the year.

 

 

 

 

Amendment of Water (Prevention & Control of Pollution) Cess  Act, 1977

The Water (Prevention and Control of Pollution) Cess Act, 1977  amended in March 2003 was enforced by way of issue of a notification in May 2003.

 

Eco Mark Scheme

 

 

Publicity to Eco-mark Scheme

The activities for building awareness as regards the ‘ECO-MARK’ Scheme were continued.  MPPCB had held workshops in this regard.

 

 

 

 

Assistance to Comparative Testing Programme

A Project for Comparative Testing of five products viz., Copier Papers, Dry Cell Batteries, Tubular Fluorescent Lamps (36W), Exhaust Fans –(Domestic Ventilating Fan), and Edible oil (soyabean oil)

 

Trade & Environment

 

i) Policy-oriented studies: A few studies (on Multilateral Agreements, WTO Agreements, environmental certifications, National environmental standards and their implications on trade and vice versa etc.) including country-specific case studies will be undertaken with the help of concerned ministries and institutions.

ii)Workshops, seminars and training: Policy-oriented

iii)Dissemination of information:

MoEF is contributing in the area of Trade & Environment by way of  providing inputs  to the nodal Ministry i.e. Ministry  of Commerce on policy matters with respect to environment vis-ŕ-vis trade.  Workshops / seminars and symposia were also organised with the financial assistance provided by the Ministry

 

The representative of the Ministry also participated in the 5th WTO Ministerial Conference held in Cancun(Mexico).

 

Assistance for Abatement of Pollution

4.00

4.32

 

Financial assistance to states for purchase of  equipment, studies, projects, salary support for UT PCCs etc. to meet the objectives of the Policy Statement for Abatement of Pollution.

During this year assistance was provided to States for strengthening of labs and salary support for technical staff.  Sanction for providing salary support to UT PCCs were  issued.

 

 

91.           CIVIL CONSTRUCTION UNIT

 

(Rs. in Crores)

S.No

Name of  the Activity

B E

Actual Expenditure

 Physical Target (no. of works)

 Physical Achievement (no. of works)

Reason for short fall, if any

A             Major Head ‘4406’ Forestry & Wild Life                                                                       

1

SFSC

0.99

0.99

1

2

 

2

IGNFA

0.45

0.45

2

1

 

3

IGNFA(DFID)

3.10

3.09

1

1

 

4

FSI

0.77

0.76

3

3

 

5

R.O

1.19

1.19

4

5

 

 

Total

6.50

6.48

11

12

 

B           Major Head ‘5425’ Ecology & Environment                                                                        

1

BSI

4.10

3.91

8

3

 

2

ZSI

4.73

3.58

7

11

 

3

NMNH

2.50

2.50

10

9

 

 

Total

11.33

9.99

25

23

 

 

Grand Total (A+B)

17.83

16.47

36

35

 

 

92.      CENTRAL POLLUTION CONTROL BOARD

(Rs. in Crores)

Name of Activity

B.E.

Actual Expenditure

Physical Targets

Physical Achievements

CPCB

 

22.00

21.55

*

 

**

                               

* Physical Targets

 

Air Pollution Assessment/Monitoring and Control

Industrial Pollution Control

Corporate Responsibi-lities of Envi-ronmental Pollution (CREP)

Water Pollution Assessment

Water Pollution Control

Projects Studies

Vehicular Pollution Prevention & Control

Zoning Atlas

Plastics Waste Management

Municipal Solid Waste Management

Eco-cities

 

** Physical Achievements

·                                 Strengthened the air quality monitoring network (295 stations) by introducing RSPM/PM10, monitoring;

·                                 Initiated monitoring of Benzene, Toluene, Xylene (BTX), Poly-Aromatic Hydrocarbons (PAH), Heavy metals, etc. in critically polluted areas/ cities;

·                                 Quality assurance programme for air quality measurements conducted for SPCB personnel using ring test facility;

·                                 Given major thrust to control air pollution from 17 categories of highly polluting industries.  Air Pollution has been reduced from Cement Plants, Iron & Steel Plants, Aluminum industry, Thermal Power Plants, Oil Refineries etc.;

·                                 Pollution prevention and control technologies for small-scale industries developed and demonstrated.

·  Effluent & Emission Standards have been reviewed/developed in respect of different categories of   

     industry sources; oil refineries, fertilizers & sulphuric acid, Brick kiln, stack height regulation,

     COINDS on hot-mix plant, refractory industry, clean technology & environmental standards for iron

     & ore mining, stone crushing and toxicity based standards under MINAS.

*  As a follow up of CREP programme, Task Forces have been set up for Thermal Power Plants,

    Cement Plants, Iron & Steel Industries, Non-Ferrous Metallurgical Industries (Cu, Pb, Al), Oil

    Refineries and Petrochemical to implement the CREP recommendations.

·                                 New water quality criteria for water quality management have been prepared;

·                                 Total number of water quality monitoring stations have been increased from 507 to 784.

·                                 86 polluted river stretches have been identified for preparation of  action plan with SPCBs to control the water pollution in these stretches.

·                                 CETP performance evaluation study in Gujarat, Maharashtra, Tamil Nadu and Uttar Pradesh have been conducted.

·                                 6086  Km. Of riverine length where BOD is more than 6 mg/l  have been identified to take further action to implement the action plan.

·                                 Major thrust have been given to control water pollution from 17 categories of highly polluting industries, specially in Distilleries, Paper and Pulp, Pesticides, Chlor Alkali Plant, Tanneries etc. 

·                                 851 industries those discharging effluents directly to rivers/lakes have been identified and to take specific action through concerned SPCBs

·                                 In order to obtain regular and reliable data, CPCB has started       regular and organised Analytical Quality control (AQC) exercise for about 110 laboratories of SPCBs/PCCs and other recognised laboratories. 

· Ground water quality on flood prone area of river Yamuna has been carried out at 50 locations.

   CPCB’s water lab has completed necessary documen-tation related to implementation of laboratory

   accreditation system as per ISO 17025. The laboratory of CPCB has been accreditated in the field of

   chemical and biological testing. 

Ambient air quality in Delhi with respect to Lead, Sulphur Dioxide and Respirable Particulate Matter has shown significant improve-ment during 2003 as compared to the levels in 1996.  Important steps

    taken to reduce the vehicular emissions and other steps are as follows:

Ř                                           Improvement of fuel quality (low sulpur diesel etc.);

Ř                                           Lead free petrol;

Ř                                           Adoption of stringent vehicular norms (Bharat Stage II/III);

Ř                                           Use of Beneficiated Coal in Power Plants;

Ř                                           DG sets emission control;

Ř                                           Shifting of polluting industries; and

Improvement of I/M programme for vehicles

 

 

-  Zoning Atlas for siting of industries have been finalized for 86 districts. The studies have been

   completed in 34 districts for which draft reports have been prepared.

   Industrial Estate planning studies have been taken up at micro level to identify environmental acceptability.  Studies  for  12 sites have Been completed, the draft report are ready for 3 sites and the work is in progress for 7 sites.

- Environmental Management Plans (EMPs) for Chennai, Indore and Bhubaneshwar hve been

   completed. EMPs are mining areas of Korba coal mines and Satna limestone belt have been

   completed.

 

·                           The State Pollution Control Boards (SPCBs)/Pollution Control Committees have taken initiatives for Implementing the provisions of the Recycled Plastics Manufacture & Usage Amended Rule, 2003, which include restriction on manufacture, sale, distribution, and use of plastic carry bags and containers less than 8 ´ 12 inches (20 ´ 30 cms) in size and having minimum thickness of 20 micron. SPCBs/PCCs have further initiated the activities which includes; Inventorisation of Plastics Recycling Units; Preparation of time-bound  action plan on Plastic Waste management; and Organising mass-awareness programmes.

A Pilot project on plastic recycling process has been completed. A new machine has been designed to process different types of plastics waste for preparing improved recycled granules and to improve the recycling process. The newly designed machine also takes care of limiting fugitive emissions in comparison with the existing recycling processes. The experiments on this machine are nearing completion.

 

·                     Annual report indicating status of implementation of solid waste management rules has been prepared and forwarded to MoEF.

Local bodies of Chandigarh, Dum Dum and New Barrackpore in West Bengal and Kozhikode (Kerala) have taken steps to set up demo-facilities for implementation of municipal solid waste rules with the assistance of CPCB and MoEF.

 

The Ecocity Programme was initiated to bring in visible environmental improvement in the identified small and medium towns.  In the first phase, the Programme has been initiated in the towns of Ujjain (Madhya Pradesh), Puri (Orissa), Tirupati (Andhra Pradesh), Kottayam (Kerala) and Vrindavan (Uttar Pradesh). The project in  Kottayam is aimed at rejuvenating Munder River and Kacherikadavu Boar Jetty and Canal that have severe siltation and pollution problems.  The project in Ujjain is aimed at area-wide improvement around Mahakal Temple and cleaning of Rudra Sagar Lake, which is highly silted and polluted with sewage. The project in Vrindavan is aimed at improvement of the historic core of the town located around Rangnath Temple.  The project in Tirupati is aimed at improvement of the core of the town near Govindrajaswamy Temple.  The project in Puri is aimed at improvement around Jagannath Temple, renovation of three of the religious ponds, shifting of garages and automobile workshop and improvement of existing solid waste disposal facility.

 

93.       ASSISTANCE TO BOTANIC GARDENS

(Rs. in Crores)

Name of Activity

BE

Actual Expenditure

Physical Targets

Physical Achievements

Reasons for shortfall, if, any

Assistance to Botanical Gardens

1.5

1.5

Inviting proposals from Botanical Garden for improvement of infrastructural facilities.

21 Botanical Gardens were provided financial support

Not applicable

 

94.       RESEARCH AND ECOLOGICAL REGENERATION (R&D)

(Rs. in Crores)

Name of the activity

BE

Actual Exp

Physical Target

Physical Achievement

RESEARCH AND DEVELOPMENT

4.5

4.16

Initiation of new projects-35

Servicing of on-going projects-160

Review of on-going projects-160

Dissemination of result of completed projects.

Initiation of new projects45-

Servicing of on-going projects-160

Review of on-going projects-160

15 executive summaries prepared of completed projects.

 

95.        G.B. PANT INSTITUTE OF HIMALAYAN ENVIRONMENT AND DEVELOPMENT

 

(Rs. in Crores)

Name of the activity

BE

Actual Expdt.

Physical Targets

Physical  Achievements

Reason for shortfall if any

G.B. Pant Institute of Himalayan Environment & Development

 

·         R&D and other expenditure

 

·         Construction

 

 

 

 

 

6.35

 

 

 

 

 

5.86

 

 

 

 

 

 

- Strengthening of on-going R&D programmes under 7 Core programmes

 

- Functioning of Institute unit  at Panthang (Sikkim) after completion of  construction works.

 

 

 

 

 

- All Identified 38 R&D programmes continued at the HQs and through four regional units under direction of SAC and Governing Body.

- The construction work at Panthang has been completed.

 

 

 

 

 

Some of the R & D activities were delayed due to shortage of manpower.

Due to pending water supply proposal shifting to new campus delayed.

Integrated Action Oriented Ecodevelopment Research Programme (IERP) for  the Himalayan Region

0.95

 

0.97

Continuation of on-going projects and sanction of new projects mainly in NE region under the activity of IERP of the institute.

16 new project sanctioned in NE region. Some ongoing projects were completed; a few new  programmes were also initiated.

-----

 

 

 96.      HAZARDOUS SUBSTANCE MANAGEMENT  

 

(Rs.   in  Crores)

Name of the Activity

BE

Actual Expdt.

Physical Target

Physical Achievements

Reasons for shortfall, if any

Hazardous Substance Management

9.00 (5.00 at RE stage)

5.00 (as per HSMDs record)

*

**

In view of non receipt of complete TSDF proposals from Karnataka & T.N. , the budget  of HSMD was revised to Rs. 5.00 crores at RE Stage which was fully utilised.

 

 

* Physical Targets for 2003-2004

 

·         Finalisation of the comprehensive National Chemical Profile.

·         Continuation of Hazard Analysis and preparation of Off-site plans (including mock-drills, crisis alert system etc.).

·         Setting up of Emergency Response Centres as per modifications.

·         Provision of financial support to Poison Control Centres.

·         Provision of financial support to atleast four TSDFs in the country.

·         Finalization & acceptance of the Report on Harmonization of hazardous wastes with  the EXIM Policy.

·         Transfer of the  Registration Scheme  to CPCB.

·         Provision of financial support to the setting up of 2 Demonstration Plants for Management of Municipal Solid Wastes including Plastic Wastes.

·         Continuation of on-going projects and studies on hazardous waste management.

·         Continuation of training programmes and workshops for creation of awareness and dissemination of information on different Rules.

·         Completion of the project titled “Preliminary assessment to identify the requirements for developing a National Implementation Plan in India as a first step to implement the Stockholm Convention on POPs”.

·         Finalization of the Cabinet Note for ratification of the PIC Convention.

·         Finalization and Notification of the Amendments to the HW Rules, Fly-ash Notification and the Re-cycled Plastic Rules.

·         Finalization and publication of guidelines/guidance documents for hazardous wastes including biomedical wastes.

·         Projects on Fly-ash utilization.

·         Strengthening of SPCBs/PCCs.

·         Implementation of all time-bound tasks & activities in the area of hazardous waste management, as per the directions of the Hon’ble Supreme Court in the matter of WP657/95, delivered on 14th October, 2003.

 

**     Achievements for 2003-04

 

·         Preparation of Off-site plans for Thane, Bharuch & Ratnagiri-Satara undertaken.

 

·         Funds released for establilishement of Emergency Response Centers at Mahad, Maharasthra and Vihskapatnam, Andhra Pradesh.

·         A National Workshop on “Environmental Emergencies and Chemical Safety and the Preparation of a National Chemicals Management Profile for India”  organized in January 2004 at New Delhi in collaboration with Government of Canada and UNITAR.

·         A National Workshop at Delhi and 5 Regional Workshops at Bhubneshwar, Guwahati, Bangalore, Pune & Lucknow were organized on Biomedical Waste Management with financial support of the Ministry.

·         A number of Training programmes /workshops supported under Chemical Safety & Emergency Planning and Management of Hazardous Wastes & Municipal Solid Wastes in different parts of the country.

·         Grants provided to Phase-II of TSDF at Andhra Pradesh. Functioning of TSDFs at Maharashtra and A.P. reviewed.

·         Action initiated for harmonization of hazardous wastes with the EXIM Policy of the country, based on the recommendations of a study sponsored earlier.

·         Registration Scheme transferred to CPCB.

·         Hazardous Wastes (Management & Handling) Amendment Rules 2003 notified on 20th May 2003.

·         Recycled Plastics (Manufacture & Usage) Amendment Rules notified on 17th June, 2003.

·         The Fly ash Amendment Notification issued on 27th August, 2003.

·         The Bio Medical Wastes (Management & Handling) Amendment Rules, notified on 17th September, 2003.

·         Studies on measurement of dioxins and furans from incinerators of bio-medical waste management facilities in Delhi, Ludhiana & Hyderabad  initiated.

·         Financial assistance provided to Kozhikode city in Kerala for developing and implementing a model system for solid waste management.

·         The project titled “Preliminary Assessment to identify the requirements for developing a National Implementation Plan in India as a first step to implement the Stockholm Convention on POPs” under implementation with support from GEF.

·         Regular participation in the various Technical Meetings of the Basel, POP & PIC Conventions & follow-up action continued.

·         The Supreme Court Monitoring Committee on Hazardous Wastes Management,    constituted in November 2003 to oversee compliance to the orders of the Supreme Court in WP657/95 by various agencies, held 3 meetings and reviewed the status of compliance of various Central and State Government agencies including SPCBs/PCCs.

 

 

  97.         BIODIVERSITY CONSERVATION                            

 (Rs. in crores)

Name of Authority

BE

Actual Expdr

Physical Target

Physical Achievements

Reasons for shortfall, if any

Bio-diversity Conservation

3.50

3.00

*

**

NA

 

 * Physical Target

-          Notification to bring various provisions of the Biological Diversity Act into force.

-          Implementation of Cartagena Protocol on Bio safety. 

-          Matters relating to the Genetic Engineering Approval Committee ( GEAC).

**Achievements:

-          The Biological Diversity Act, 2002 were implemented through notification of Biological Diversity Rules, 2004.  

-          The  National Bio-diversity Strategy and Action Plan ( NBSAP) has been finalized.

-          Matters relating to Cartagena Protocol on Bio safety were pursued. 

-          Matters relating to the Genetic Engineering Approval Committee ( GEAC), GM Food and Transgenic Crops was pursued.

 

 98.    CONSERVATION  & MANAGEMENT OF WETLANDS, MANGROVES AND CORAL REEFS

(Rs. in Crores)

Name of the Activity

BE

Actual Expdt.

Physical Targets

Physical Achievements

Reasons for shortfall, if any

1.  MAPs and R&D activities on Wetlands 

6.00 (BE)

 

6.54 (RE)

 

6.44

15 MAPs on Wetlands

18 MAPs and 09 on-going research projects.

Nil

 

2.  MAPs and R&D activities on Mangroves & coral areas

5.00 (BE)

 

5.50 (RE)

 

5.27

25 MAPs on Mangroves & 4 MAP on Coral reefs.

Achieved as per target.

- Complete physical targets could not be achieved due to non-receipt of UCs and MAPs  from the States.

 

 

99.        BIOSPHERE RESERVES

(Rs. in Crores)

Name of Activity

BE

Actual Expenditure

Physical Targets

Physical Achievements

Reasons for shortfall, if any

MAPs and Research on BRs

6.00 (including NE region)

6.00

13 MAPs on BRs and 10 research projects

11 MAPs on BRs and 15 research projects

N.A.

 

100.       INTERNATIONAL COOPERATION

(Rs. in crores)

Name of the

Activity

BE

Actual Exp.

Physical

Target

Physical

Achievements

Reasons for shortfall, if any

India Canada Environment Facility (ICEF).

0.01

Nil

Implementation of approved sub-programmes.

-

No commodity was donated by Canada during this year.

IC Activities.

1.50

1.46

Existing activities to continue.

Existing activities continue

 

SoE

1.25

1.25

Existing activities to continue.

-do-

 

 

Achievements:-

 

1)       Follow-up, implementation, monitoring and evaluation of the approved projects under the UNDP-CCF/GEF Programme.

 

2)       Agreement between Govt. of India and the Govt. of State of Israel on Cooperation in the field of Protection of Environment.

 

3)       Meeting of the 2nd GEF Empowered Committee held on 22nd December 2003.

 

4)       A Senior Level delegation participated in the 11th Session of Commission on Sustainable Development (CSD) which took place in New York from 28th April to 9th May, 2003.

 

5)       Nomination of officials for training abroad in the field of environment & forests.

 

6)       India participated in the inter-governmental consultation on strengthening the scientific base of UNEP held in Nairobi on 14-15 January 2004.

 

7)       India participated in the second meeting of the India-EC Joint Working Group on Environment held on 13th January 2004 at Brussels.

 

8)  India participated in the 8th Special Session of UNEP Governing Council/GMEF   

from 29-31 March, 2004 at Republic of Korea

 

9)       Follow-up on the bilateral Memorandum of Understanding signed with Germany, Russia, Turkmenistan, Tajikistan, Vietnam, China and Iran.

 

10)    Follow-up on the Indo-US and Indo-Brazil Common Agenda on Environment, India Finland JWG.

 

11)    Follow-up on the action points related to SAARC Environment Ministers Meetings.

 

12)    Building a strong pipeline of new GEF proposals, follow up and implementation of approved GEF projects, to monitor and evaluate their progress.

 

13)    Assessment of the funding objectives of various lending and donor agencies (multilateral and bilateral) to facilitate access of more resources for projects, preparation of a pipeline of projects for external funding.

 

15) MoEF participated in various Conferences of Parties/Meetings related to UN 

Convention on Climate Change, Biodiversity, Desertification, Montreal Protocol, Basel Convention   and other Conferences in the field of environment and forests.

 

     16)  Implementation of UNDP/CCF Programme.

 

     17)  Implementation of UNDP/GEF Small Grants Programme.

 

101.                  ADAPTATION & CAPACITY BUILDING PROJECT ON CLIMATE CHANGE

                                                                                                                                             

 (Rs.  in crores)

Name of the Activities

BE

Actual Expdt..

Physical Targets

Physical Achievements

Adaptation & Capacity Building Project on Climate Change

 

1.00

 

0.94

Activities/ conferences relating to Adaptation & Technology Transfer would be undertaken

A Climate Change Technology Bazaar was organised from 10-13 November, 2003.  Besides, a Round Table on CDM, workshop on Climate Change & Energy, Adaptation Research Workshop, Workshop on Climate Change & Clean Energy Technologies, Workshop on Climate & Development, meeting of the Expert Group on Technology Transfer, Workshop on ‘Climate Change – Good for Environment & Business’ and another Adaptation Workshop were held during the year.

 

The National CDM Authority for evaluating CDM Projects was set up in December 2003, after obtaining the approval of the Cabinet.

 

102.                     ESTABLISHMENT OF ENVIRONMENT AUTHORITIES, COMMISSIONS AND

                           TRIBUNALS

(Rs. in Crores)

 

BE

Actual Expdt

Physical Targets

Physical Achievements

NEAA

 

Loss of Ecology (Pre. & Payment of Compensation) Authority for Tamil Nadu

 

Env. Pollution (P&C) Authority for NCR

 

(the main Scheme is being handled by IA & CP Divn.

5.00

5.00

*

*

 

 

                               

*              The mandate of the NEAA is to hear appeals with respect to restriction of areas in which any industries, operations or process or class of industries, operations or processes shall not be carried out of shall be carried out subject to certain safeguards under the Environment (Protection) Act 1986 and for matters connected therewith or incidental thereto.  The Authority has achieved this target.  During the period of its existence since 1997 only 10 appeals were filed before it till the end of 2002-03 and all the 10 appeals have been disposed of.

 

Loss of Ecology (Prevention & Payments of Compensation) Authority of the State of Tamil Nadu:

 

                The mandate of the Authority is to deal with situation created by the tanneries and other polluting industries in Tamil Nadu by exercising the powers and functions laid down in para 2 of Notification S.O.671(E) dated 30.9.96.  The Authority has been carrying out these functions as per the target.

 

Environment Pollution (Prevention & Control) Authority for the National Capital Region:

 

                The mandate of the Authority is to exercise the powers under Section 5 of the Environment (Protection) Act 1986 for issuing direction for compliance relating to violation of standards for quality of environment, emission or discharge of pollutants and to take all necessary steps to control vehicular pollution, restriction of industries causing environmental pollution and monitor the progress of action plan drawn by the Ministry of Environment & Forests on Pollution in Delhi as contained in the White Paper on Pollution in ?Delhi with an Action Plan.  The Authority has been performing its functions as per the target fixed.

 

 

103.      WORLD BANK AIDED INDISTRIAL POLLUTION CONTROL PROJECTS

 

 

The Project has ended on 30.11.2002 and its residual activities have been merged with the World Bank aided  EMCBTA Project.

 

 

104.    COMMON EFFLUENT TREATMENT PLANTS (CETPs)

 

(Rs. in Crores)

Name of the Activity

B.E.

Actual expdt.

Physical Target

Physical Achievements

Reasons for shortfall, if any

Common Effluent Treatment Plants

4.95

4.95

 

Construction of CETPs in the Small Scale Industrial clusters

The amount has been fully utilized by providing financial assistance for construction of CETPs in the small scale industrial clusters

NIL

 

 

 

 

105.     REIMBURSEMENT OF WATER CESS

 

(Rs. in crores)

Name of the Activity

B.E.

Actual expdt.

Physical Target

Physical Achievements

Reasons for shortfall, if any

Reimbursement of water cess

44.1049

44.1049

NIL

NIL

NIL

 

 

106.        TAJ PROTECTION MISSION

 

(Rs. in Crores)

Name of the Activity

B.E.

Actual Expdt.

Physical Target

Physical Achievements

Reasons for shortfall, if any

Taj Protection Mission

33.00

NIL

NIL

NIL

No new proposal has been submitted by the Govt. of U.P.

 

 

 

107.      ALL INDIA COORDINATED PROJECT ON TAXONOMY (AICOPTAX)

 

 (Rs.in crores)

Name of the Activity

BE

Actual Expenditure

 

Physical Targets

Physical Achievements

AICOPTAX

1.50 (BE)

 

 

1.20

Continuation of various units.

The units continued their activities.

 

 

108.                ENVIRONMENTAL MANAGEMENT CAPACITY BUILDING TECHNICAL             ASSISTANCE PROJECT (WORLD BANK AIDED)

(Rs.in crores)

Name of the Activity

BE

Actual Expendt.

Physical Targets

Physical Achievements

Reasons for shortfall, if any

India: Environmental Management Capacity Building Technical Assistance Project

16.74

15.07

*

**

***

 

*Physical Targets

 

The activities included under various sub-components are of continuous nature subject to fulfillment of procedures/guidelines prescribed by the World Bank for hiring of consultants for preparation of specific reports, conducting of training programmes, procurement of material, holding of orientation workshops, publication of books; preparation of guidelines for environmental impact assessment of projects, creation of website on environmental data, funding of projects in environmental economics/ environmental management plans, creation of awareness about environmental issues.

 

** Physical Achievements

 

During the year the main thrust was on completing the remaining activities during the one year extended period of the project upto 30.6.2004 after initial shortfalls during preceding years.  The year has demonstrated a good scenario in terms of achievement towards procurement of equipment, completion of local & foreign training programmes, preparation of environmental plans and reports, more and more staff trained on sound mining practices, legal aspects of environmental issues; infusion of environmental concepts in school curricula completed in 16 States, computerization done & several institutions strengthened and various industrial emission and effluent standards reviewed and developed, capacity built in environmental planning and management.

 

***Reasons for shortfall, if any

 

No shortfalls were faced and in fact the shortfalls of previous years were overcome through close monitoring & quick remedial   measures aimed at successful achievement of the objectives of the project.