CHAPTER II-C-1
REVIEW OF OVERALL PERFORMANCE DURING
2003-2004.
FORESTRY AND WILDLIFE
59 INDIAN
COUNCIL OF FORESTRY RESEARCH AND EDUCATION (ICFRE), DEHRADUN
(Rs.
in Crores)
|
Name of the Activity |
B.E. |
Actual Expdt. |
Physical Target |
Physical Achievem-ents |
Reasons shortfall if any |
||
|
|
Plan |
Non-Plan |
Plan |
Non-Plan |
|
||
|
General Component |
32.49 |
10.28 |
32.56 |
10.28 |
No @ Shortfall |
||
|
Education & Training |
2.50 |
1.1845 |
2.50 |
1.1845 |
|
||
|
Externally Aided Component |
- |
- |
- |
|
|
||
North-East
|
4.00 |
- |
4.00 |
|
|
||
Total |
38.99 |
11.4645 |
39.06 |
11.4645 |
|
||
60. INDIAN PLYWOOD INDUSTRIES RESEARCH AND
TRAINING INSTITUTE (IPIRTI), BANGALORE
(Rs. in Crores)
|
Sl. No. |
Name of the Activity |
BE |
Actual Expdt. |
Physical Target |
Physical Achievements |
Reasons for
shortfall, if any |
|
1 |
Inputs
to improve research capability in Labs. experimental plant at IPIRTI and Research
& Training in the field of Mechanical Wood Industries Technology. |
3.90 |
1.51 |
Research
and development work is being carried out on the projects as detailed under
(A- On-Going Projects Sl. No. 1 to 14, B
– On-Going Sponsored Projects Sl. Nos. 1 – 9 C – New projects Sl. No.1-6) |
As
detailed under E – Projects
Completed during the year 2003-04
under (a-Institute's projects completed and report published), (b-Sponsored
projects completed and reports submitted to the sponsors) |
- NIL - |
|
2 |
Establishment
of Particle Board plant |
1.085 |
- |
|
Project
proposal submitted to MOEF for financial assistance |
|
|
|
TOTAL |
4.985 |
1.51 |
|
|
|
A) Ongoing Institute's Research Projects for 2003-2004
1.
Development of panel
materials from woven coir mat / Non-woven coir felt with Veneers and Bamboo Mats
2.
Enhancement of Utilization of Plantation Timbers through
edge lamination
3.
Study on preferential
absorption of chemicals in dip
diffusion process of veneer treatment with fixed type of preservative – CCB
4.
Development of Urea
Formaldehyde resin with low formaldehyde emission for particle board
5.
Design and Development
of Mechanized Model of E-Tester
6.
Effect of cyclic tests on bending properties of composites
from wood and other natural fibers including Bamboo (Phase –I :Plywood)
7.
Effect of Age of Bamboo
on strength properties of BMB and BMCS
8.
Life cycle analysis of
Bamboo Mat Corrugated Sheets (BMCS)
9.
Development of improved
powder PF resin for bamboo mat composites
10.
Establishment of
National Information Centre on wood/non-wood
panel products and composites (NICWOOD)
11.
Development of durable and dimensionally stable Block board
using Plantation Timber: An IPIRTI – IWST collaborative project
12.
Development of Improved
Cardanol Phenol Formaldehyde (CPF) Resin
13.
Development of PF resin
adhesive incorporated with insecticide and fungicide for preservation of
plywood
14.
Development of Ridges
for BMCS Roofing System
B) On-going Sponsored Projects (2003-04)
1.
Design and development
of low cost houses using bamboo shelters in collaboration with TRADA Technology
(DFID/KAR.7140)
2.
Field Demonstration
& Development of bamboo based composites/panels or housing in NE region
sponsored by MoEF (implemented in collaboration with BMTPC)
3.
Application of Finger
Jointing techniques in Product Development using plantation species (BMTPC)
4.
Evaluation of
suitability of plantation grown timbers form Tamilnadu for the manufacture of
plywood (Sponsored by TN Forest corporation).
5.
Development of Transfer
of Technology Model for Bamboo
Matchsticks sponsored by INBAR
6.
Evaluation of Bifenthrin
against borers and termites for protection of wood and plywood
7.
Development of I-Beam
using laminated veneer lumber made from plantation timbers and bamboo mat board
– An exploratory study sponsored by BMTPC
8.
Up scaling of lab.
Technology for making panels from banana sheath developed by Regional Research
Laboratory, Trivandrum and approved by BMTPC
9.
IPIRTI-TIFAC joint study
for preparation for techno commercial report on manufacture Bamboo Laminates
C) Projects approved by PAC in the last held on
18-August 2003:
1. Training cum Production centre for bamboo mats at Magadi,
Bangalore-Rural, Karnataka.
2. Development of techno-commercial proposal for alternate
industrial uses of bamboo in Orissa.
3. Study on the suitability of plantation grown timber received
from Tamilnadu for the manufacture of general purpose plywood.
4. Study of alternate test method for 72 hours boiling test
prescribed for plywood and block-board in Indian standard specification.
5. Development of modified flush door shutter to minimise the use
of wood in flush door shutter manufacture and also for the efficient use of flush door shutter as domestic and toilet door
purposes.
6. Investigation on the use of new environment friendly
preservative chemical "Spinosad" for plywood protection.
D) Projects approved for
capacity building under 10th Five Year Plan, subject to availability
of funds:
10.
Establishment of
Research and Training Facilities for Manufacture of Particle Board. Priority has to be given to take up this
project as pilot plant building has already been constructed under IX Five Year
Plan period.
11. Up scaling of Technology for Bamboo Laminates for
furniture and structural uses
12. Strengthening of facilities for testing of composites
from wood and other natural fibres including bamboo
13. Establishment of Mobile Saw Doctoring Unit for
Training and Demonstration.
E) Projects completed during the year 2003-04
a.
Institute's Research
projects and reports completed for year 2003-04
|
Sl. No. |
Research Report No. |
Title
of the Report
|
|
1. |
124 |
Computerized
Bibliographical data on wood adhesives – World literature (1980-1999)
(SORIT-03/1992)
|
|
2. |
125 |
Development
of glued laminated timber using plantation grown species for structural and
non-structural uses (PASD-22/96)
|
|
3. |
126 |
Development
of E-Tester for large size wood based panel material (WC/Testing/04/2000)
|
|
4. |
127 |
Laminated
veneer lumber for plantation timber for rails and stiles frames for
furniture/joinery (LP/LVL/03/2000)
|
b.
Sponsored Research projects and reports submitted to the sponsors for year 2003-04
1. Evaluation of Lindane 20EC as
glueline additive for protection of plywood
2. Evaluation of Dursban 50 WT as a
glue line additive (Project Code No.
SP-21/1999)
3. Development of technology for making products from Chir pine needles project sponsored by Himachal Pradesh State Forest Corpn.(Project Code No. SP-29/NWC/2001)
4. Exploratory investigation to develop moulded articles from coir non-woven felt SponsoredbyCoir Board, India (Project Code No. SP- 32/NWC/2001)
5. Development of Marine shuttering and
film faced plywood from Silver Oak (Gravillea
Robusta) sponsored by M/s.Tata Coffee Ltd. (Project Code No. SP-33/WC/2001)
6. “Transfer of Technology Model (TOTEM) for Bamboo Match sticks” sent to INBAR (Project
code No. SP-34/2001)
7. Development of window/door frames from small size Sal poles
using finger jointed and
lamination
techniques sponsored by West Bengal
Forest Development Corporation (Project
Code No. SP-36/LP/2002)
61. INDIAN
INSTITUTE OF FOREST MANAGEMENT (IIFM), BHOPAL
(Rs. in crores)
Name of the activity
|
BE |
Actual Expdt. |
Physical Target |
Physical achievement |
Reasons for short fall if any |
|
MDP/Courses & Seminars |
4.00 (Plan) 0.83 (Non-Plan) |
4.00 (Plan) 0.82 (Non-Plan) |
|
22MDP 11,Workshop& seminar |
Nil |
|
PGDFM/MRM |
|
37,students in PGP and 20,students in MRM |
Nil |
||
|
Ph.D/Research studies/Consultancy |
Ongoing Research Projects will be completed
and some new projects have been started.,5 student registered for PHD. |
||||
|
Manpower(Salary and wages) and other
Expenditure |
762, Books and 200 Journals have been
subscribed. |
||||
|
Funds for Construction |
|||||
|
Library |
|||||
62. STATE
FOREST SERVICE AND RANGERS TRAINING COLLEGES
(Rs. in Crores)
|
Name of the Activity |
BE |
Actual Expdt. |
Physical Targets |
Physical Achievements |
Reason for shortfall, if any, |
|
State Forest Service and Rangers
Training colleges |
#1.00+ 0.50* |
0.92 + 0.50* |
- |
- |
- |
|
a) Training of SFS officers in SFS Colleges,
Dehradun. |
|
- |
1
Course |
1
Course |
No
shortfall. 2002-2004
batch passed out on 31st March, 2004 while 2003-2005 batch is
under training w.e.f. 1-4-2003 in 1st year. |
|
b) Training of Forest Rangers at SFS College,
Coimbatore, Burnihat & EFRC,
Kurseong. |
|
- |
3
Courses |
3
Courses |
No
shortfall. (i)
2 batches of 2001-03 passed out and 2 batches of 2002-04 are in the 2nd
year of training and will passed out in Nov., 2004. (ii)
3 batches 2003-05 for the newly recruited RFO started from November, 2003. |
|
c) Refresher Courses for in-service SFS officers
with 30-35 participants each |
|
- |
7
Courses |
6
Courses |
One course could not be conducted because states
did not utilize their allotted seats. |
|
d) Courses on Computer Application in Forestry for
in-service SFS officers with 25-30 participants each. |
|
- |
7
Courses |
7
Courses |
No
shortfall. Target fully achieved. |
|
e) Advance Courses on Computer Application in
Forestry for in-service forest officers with 30-35 participants each. |
|
- |
4
Courses |
4
Courses |
No
shortfall. Target fully achieves. |
|
f) Theme based courses in forestry for In-service
SFS Officers with 25-30 participants each. |
|
- |
7
Courses |
5
Courses |
2
courses could not be conducted because states did not utilize their allotted
seats. |
|
g) Two weeks “Trainers Training Course” with 20
participants for each course |
|
- |
2
Courses |
2
Courses |
No
shortfall. Target fully achieved. |
|
h) Two weeks “Refresher Course” for Range Officers
(30 participants each). |
|
- |
2
Courses |
2
Courses |
No
shortfall. Target fully achieved. |
|
i) Two weeks “Refresher Course” for in-service
Deputy Rangers, Foresters and Forest Guards with 30-35 participants in each
course. |
|
- |
3
Courses |
3
Courses |
No
shortfall. Target fully
achieved. These courses were allotted
by the Ministry for the first time during 2003-04 in addition to target fixed
for 2003-04. |
|
j) Forestry Courses for sister & other
organization on request. |
|
- |
2
Courses |
1
Course |
Demand
for only one course was received. |
|
l) Seminars/Workshop on Forestry related issues. |
|
- |
3 |
- |
|
#
Out of Rs. 1Crore, Rs.5 Lakh allotted to this Directorate under budget head
04.00.01-Salaries (Plan), was surrendered to the Controller of Accounts, MOEF,
New Delhi vide this office letter No.3-53/Acct./DFT/2003/2577-79 dated
19-12-2003.
* Fund is at the disposal
of Civil Construction Unit.
Note: A proposal for
conducting six week promotion linked course for ACF/RFOs was sent to the
Ministry for approval. As and when
approval is received, courses will be conducted.
63. IN-SERVICE TRAINING
FOR IFS OFFICERS
(Rs. in Crores)
|
Name of the
Activity |
BE |
Actual
Expdt. |
Physical
Target |
Physical
Achievements |
Reasons for
shortfall, if any |
|
One/two-week
Compulsory Training course for IFS officers |
1.00 |
1.00 |
100% |
100% |
NA |
64. INDIRA GANDHI NATIONAL FOREST ACADEMY
(IGNFA)
(Rs. in Crores)
|
Name of
activity |
BE |
Actual Expdt. |
Physical
targets |
Physical Achievement |
Reason for
shortfall if any |
|
IGNFA |
2.74 (Plan) 2.81 (Non-Plan) |
2.64 (Plan) 2.37 (Non-Plan) |
Training
of IFS Officers of 10, 17 and 21 years of seniority. Training of IFS Probationers of 2001-2004, 2002-2005
and 2003-2006. |
* |
Nil |
* Physical Achievements
65. FOREST
SURVEY OF INDIA (FSI), DEHRADUN
(Rs. in crores)
|
Name
of the activity |
BE |
Actual
Expdt. |
Physical
Target |
Physical
Achievements |
|
Survey and Utilization of Forest Resources |
9.95 |
9.61 |
|
|
|
Activity |
|
|
|
|
|
(a)Procurement
of cloud Free
Satellite Data |
|
|
315
Satellite Scenes |
286 |
|
(b)
Rectification of Satellite Data Geo-reference on SOI Toposheet. |
|
|
315
Satellite Scenes |
286 |
|
(c)Interpretation
(classification ) of Satellite Data through Data Image processing (DIP) |
|
|
315
Satellite Scenes |
286 |
|
(d)Ground
Truthing / Ground Verification |
|
|
|
259 |
|
(e)Incorporation
of corrections, change detection and area calculation. |
|
|
200Toposheets
(on 1:250,000scale) |
|
|
(a)
Forest Inventory |
|
|
30Districts |
30 |
|
(b) TOF
(Rural) |
|
|
30Districts |
27
|
|
(C)
TOF Urban |
|
|
30Districts |
30 |
|
(d) Data Processing |
|
|
30Districts |
- |
|
(e) Training |
|
|
100 Officials |
154 |
66. FOREST
PROTECTION AND REGENERATION
(Rs. in Crores)
|
Name of the Activity |
BE |
Actual Expdt. |
Physical Target |
Physical Achievement |
Reasons for shortfall, if any |
|
Integrated Forest Protection Scheme (IFPS) |
66.00 |
25.40 |
To assist all
States & UTs for fire protection, Infrastructure Development for forest
protection & preparation of Work
Plan & Survey & Demarcation of forest areas |
All states were
assisted for taking effective steps for prevention & control of Forest
fires, development of infrastructure for forest protection and preparation of
working Plan and Survey Demarcation of forest areas. |
Funding pattern
of the Scheme was changed from 100%
Centrally Sponsored to 75%:25% cost sharing between Centre and the states
during financial year 2003-04. |
67. FOREST
CONSERVATION
(Rs. in Crores)
|
Name of Activity |
BE |
Actual Expenditure |
Physical Target |
Achievement |
Reasons for shortfall it any |
|
Financial Revenue Capital |
5.00 2.00 |
4.765 2.00 |
|
|
|
|
1. Monitoring of projects approved under
FCA 1980 for compliance of stipulated conditions |
|
|
950 |
750 |
Posts are laying vacant |
|
2. Monitoring of projects approved under
FPA, 1980 for compliance of stipulated conditions. |
|
|
400 |
2900 |
|
|
3. Disposal of proposals for diversion of
Forest land up to 40 ha land under FC 1980 |
All cases received from the user agencies
through State Govts. for diversion of forest land within six weeks. |
||||
|
4. Site inspection of projects in all
State/Uts. |
All cases referred by the Ministry within
30 days. |
||||
|
5. Participation in the other meeting at
State/Uts |
All working plans referred by the State
Govt. to Regional Offices to be finalized within 2 months as per the
Ministry’s Guidelines. |
||||
|
6. Assisting Paryavaran Vahin in the
capacity of observer and technical advisors. |
All work. |
||||
WILDLIFE
68. STRENGTHENING
OF WILDLIFE DIVISION AND CONSULTANCIES FOR SPECIAL TASKS
(Rs in. Crores)
|
Name of the activity |
BE |
Actual Exp. |
Physical Target |
Physical Achievement |
Reasons for short fall ,
if any |
|
Strengthening of Wildlife
Division and Consultancies for Special Tasks |
2.00 |
2.00 |
No
physical target can be taken as Regional Offices salary, Office expenditure
and domestic travel expenditure are being paid under this scheme. Funds are
also provide for consultancies for special taks as and when there is a
proposal for the same. |
-- |
-- |
69. ASSISTANCE
FOR DEVELOPMENT OF NATIONAL PARKS AND
SANCTUARIES
(Rs. in Crores)
|
Name of the
activity |
BE |
Actual Exp. |
Physical Target |
Physical Achievement |
Reasons for
short fall, if any |
|
Assistance
for Development of National Parks/ Sanctuaries |
37.00 |
43.187 |
280 PAs |
269 PAs |
Limited availability of budget. |
70. WILDLIFE INSTITUTE OF INDIA (WII)
(Rs. in Crores)
|
Name of the
Activity |
BE |
Actual Expenditure |
Physical
Target |
Physical
Achievement |
Reasons for
Short falls if any |
WII
|
11.57 |
11.57 |
|
|
|
|
M.Sc. Course in Wildlife Science |
|
|
12 |
8 |
No response from self sponsored person |
|
PG Diploma in Wildlife Management |
|
|
30 |
18 |
Due to poor response from State Govt. |
|
Certificate Course in Wildlife Management |
|
|
30 |
20 |
Due to poor response from State Govt. |
|
Research Projects |
|
|
24 |
24 |
|
71. PROJECT TIGER
(Rs. in Crores)
|
Name of the
Activity |
BE |
Actual
Expenditure |
Physical
target |
Achievements
|
|
Project Tiger |
Rs.
25.50 crores + Rs.
3.00 crores for NE Region |
Rs.
28.55 crores including Rs. 3.67
crores to NE Region. |
To continue to provide Central Assistance to the
27 Tiger Reserves under the Project Tiger Scheme. |
Based on the Annual Plan of Operations containing
physical targets submitted by the State Governments Central Assistance was
released and implementation was monitored. |
2. C.S.ECO- DEVELOPMENT SCHEME –General
Component
(Around National Parks and
Sanctuaries including Tiger Reserves)
Merged with Project Tiger
Scheme during Xth Five Year Plan
3. C.S.BENEFICIARY
ORIENTED SCHEME FOR TRIBAL DEVELOPMENT
Merged with Project Tiger
Scheme during Xth Five Year Plan
72. INDIA ECO-DEVELOPMENT
PROJECT
(Rs. in Crores)
|
Name of the
Activity |
BE |
Actual expdt. |
Physical Target and Achievements |
Reasons for
shortfall, if any |
|
India Eco
development Project |
28.00 |
13.34 |
Assistance was provided to seven Project
States. The expenditure was incurred on the activities namely, Eco-system Management, Habitat
Protection And Management (i) Survey and Demarcation (ii) Baseline Mapping (iii) Microplanning for Villages (iv)
Management training and Study Tours (v)
Implementation support and Supervision (vi)
Environmental Education & Awareness activities (vii)
Impact
Monitoring And Research Activities which include Support Facilities (viii) Civil Works, Vehicles, Transport and Procurement of Equipment. Most of the activities under village eco-development Programme
to be implemented by the Eco development committees for each village in and
around PAs (numbering 572 villages in all the PAs) are at various stages of
implementation. It is being
continuously and intensively monitored by the Review Missions of the World
Bank, Director/Addl. Director (PT) and by an independent body i.e. JPS Associates from time to
time. |
Less demand by States. |
73. PROJECT ELEPHANT
(Rs. in crores)
|
Name of the activity |
BE |
Actual Expdt. |
Physical Target |
Physical Achievements |
|
Project Elephant |
Plan 12.00 |
Plan 13.11 |
As proposed by States in A.P.O |
Funds released to 12 States where 24 Elephant Reserves have been declared. |
74. CENTRAL ZOO
AUTHORITY (CZA)
(Rs. in crores)
|
Name
of the Activity |
B.E. |
Actual
Exp. |
Physical
Target |
Physical
Achievements |
Reasons
for shortfall if any |
|
Central
Zoo Authority |
15.49 |
15.49 |
As indicated below |
As indicated below |
As indicated below |
@Physical Target for 2003-2004
To evaluate zoo
with reference to norms and standards specified under the Recognition of Zoo
Rules,1992 and to recognize / de-recognise zoos under the provisions of
Wildlife (Protection) Act.
To provide
technical and financial assistance to the zoos having potential, to achieve the
desired standards as provided in the rules. To provide proper housing as well
as feed and upkeep facilities to the animals received from circuses /from the
zoos refused recognition and also. .
To conduct training and
workshops for the Zoo personnel to exchange their views and upgrade their
skill.
Physical Achievements for 2003-2004
1. Entire allocation of Rs. 1549.00 lakhs have been fully utilised for the furtherance of the objectives assigned to CZA.
2. An amount of Rs.3.02 lakhs was spent on monitoring and evaluation of zoos in the country. Zoos were evaluated with reference to the standards and norms and granted recognition with suggestion for further improvement. Renewal of recognition of other Zoos were withheld pending compliance of conditions of recognition.
3.
Financial
assistance of Rs.864.33 lakhs was provided to 25 zoos for improvement of
housing, upkeep and veterinary care of animals etc.
4.
Financial
assistance of Rs.238.61 lakhs were provided
towards feed and upkeep of rescued circus animals kept in Rescue
Centres.
5.
Financial
assistance of Rs.70.30 lakhs were provided
to Veterinary Colleges at Anand Gujarat and Guwhati for upgradation of their
clinical and diagnostic facilities.
6.
Training
courses & workshops were organized for upgrading skills of the zoo
personnel. Rs.40.28 lakhs was spent for
this purpose. 113 Zoo Personnel were trained. One zoo director and one
veterinarian were also sent to UK for specialized training in zoo management.
An international workshop was organized on “ Health Care Management Of Wild
Animals In Zoos”.
7.
The
administrative/ operational cost of the Central Zoo Authority for carrying out
all these activities was Rs.48.62
lakhs, which comes to less than 5% of the total outlay.
Reasons for Shortfall if any:
CZA utilised the entire
budget allocation for the purpose for which it was sanctioned. There
was no shortfall in the performance of CZA.
75. NATIONAL
ZOOLOGICAL PARK (NZP)
(Rs in Crores)
|
Name of the
Activity |
BE –Plan |
Actual & Plan |
Physical
Target |
Physical
Achievement |
Reason for
shortfall if any |
|
Development Activity in National Zoological Park. |
2.15 |
2.15 |
i) Revival of channel No.15 ii) Celebration of Wildlife Week & Van
Mahaotsava iii) Conduction of various seminars & Teacher Oriented Programme iv) Publication of Guide Map, Annual Report,
Stickers etc. v ) Preparation of Signage. vi)
Maintaining the Health & Hygienic Environment for Zoo Animals. vii) Exchange of various animals with India &
Foreign Zoo for Plan Breeding
Project. viii)Upkeep of animals and their enclosure. ix) Providing facilities to the visiting public. **For the Capital construction work executed through CCU / CPWD, the funds
will be provided by Central Zoo Authority . |
Except revival of Channel No.15 all other targets
achieved in full |
Rs 142.80 lakhs for revival of Channel No.15, e
was placed at the disposal of MCD.
However due to lack of coordination between different agencies
involvement , the work could not be started up. |
76. PROTECTION OF WILDLIFE OUTSIDE PROTECTED
AREAS
(Rs. in Crores)
|
Name of the activity |
BE |
Actual Expenditure |
PhysicalTarget* |
Physical Achievements* |
Reasons for shortfall, if any |
|
Protection of wildlife outside protected areas |
5.00 |
Scheme not approved by Planning Commission |
NIL |
NIL |
- |
* As the Scheme was not approved by the Planning Commission, funds could not be released to States. Physical target & Achievements may therefore be treated as Nil.
77. ANIMAL WELFARE DIVISION
(Rs. in Crores)
|
Name of the Activity |
BE |
Actual Expdt. |
Physical Target |
Physical Achievements |
Reasons for shortfall, if any |
|
AWBI |
4.50(P) 0.53(NP) |
4.95 (P) 0.68(NP) |
- |
Grant
to 842 organizations |
More
amount was provided at RE stage both in Plan and Non-Plan |
|
Shelter |
6.50 |
2.87 |
26 |
36
Proposals have been approved (Generally
for one shelter house the organization is given grant in two
installments) |
Receipt
of in complete proposals and non receipt of inspection reports |
|
Ambulance |
.45 |
0.49 |
12 |
13
Proposals have been approved |
More
amount was provided at RE stage |
|
ABC |
2.50 |
1.69 |
56,179(Dogs) |
37,977 (Dogs) |
Receipt
of in complete proposals and non receipt of inspection reports |
|
NIAW |
3.00 |
1.30 |
Construction
of Main Infrastructure |
Most
of the Building Work Competed |
The
construction work was to be implemented through CCU. CCU expressed its
inability to utilize full amount. |
|
CPCSEA |
0.45 |
0.45 |
- |
Zonal
Workshops – Nominee
Workshops – Inspection
of Animal Houses - |
|
|
Natural Calamity |
0.30 |
0.30 |
- |
3
states were given grant |
|
|
Scholarship |
0.45 |
0 |
- |
- |
|
78. NATIONAL
AFFORESTATION & ECO-DEVELOPMENT
(Rs. in
Crores)
|
S.No |
Name of Activity |
B.E. |
Actual Exp. |
Phy.
Target (Ha.) |
Phy.
Ach.(Ha.) |
Reasons
for shortfall if any |
|
1 |
2 |
3 |
4 |
5 |
6 |
7 |
|
1 |
National
Afforestation Programme (NAP) |
196.00 |
225.53 |
1,25,000 |
2,83,642** |
|
|
2 |
National
Afforestation Programme to Combat Desertification |
2.00 |
Nil |
N.A |
N.A |
|
|
3 |
Greening
India |
1.00 |
Nil |
N.A. |
N.A |
Scheme not approved. |
|
4 |
National Afforestation & Eco-development
Board (NAEB) |
|
|
|
|
|
|
|
a. Grants-in-Aid to voluntary Agencies |
7.14 |
8.49 |
- |
177 projects 8,744 ha.** |
|
|
|
b. Monitoring & Evaluation |
0.75 |
1.75 |
Evaluation of 50 FDA projects, IX Plan Scheme Projects |
Evaluation of 50 FDA projects, IX Plan Scheme Projects |
|
|
|
c. Communication |
0.66 |
0.86 |
IPVM Award 2001 & 2002. |
IPVM Award 2001 & 2002 to be processed |
|
|
|
d. Support to Reg. Centres. |
1.60 |
1.80 |
7 Reg. Centres |
7 Reg. Centres |
|
|
|
e. Professional & Special Services |
0.07 |
0.06 |
Compilation of IX plan Eval. Studies |
Compilation of IX plan Eval. Studies |
|
|
|
f. Board Secretariat |
2.78 |
2.55 |
- |
- |
|
|
5 |
Eco-Dev
Forces (EDF) |
8.00 |
9.94 |
4ETF battalions 1358 ha. |
4 ETF battalions 1478 ha. |
|
TOTAL
|
220.00 |
250.54 |
|
|
|
|
** This
is the total area of the projects approved during the year 2003-04.
79. NATIONAL RIVER CONSERVATION DIRECTORATE
(Rs. in crores)
|
Name of the Activity |
BE |
Actual Expdt. |
Physical Target (no. of schemes) |
Physical Achievements (no. of schemes completed) |
|
1.NRCD(Estt.) |
6.00 |
6.56 |
|
|
|
1.
2. NRCP |
244.00 |
219.18 |
No specific target was fixed. Total no of Sanctioned projects from the beginning
till 31.03.2003 were 770 and completed 386 In addition 49 new projects
sanctioned during the year |
86
Projects have been completed between 1.4.03 and 31.03.2004 |
|
3. NLCP |
45.00 |
20.00 |
5 |
3 |
|
Total |
295.00 |
245.74 |
|
|
ACHIEVEMENTS (2003-2004):
A capacity to treat 228.89
mld of sewage was created during this year under NRCP
New Proposals
approved during 2003-04:
Pamba town in Kerala
costing Rs. 18.44 crore was taken up for pollution abatement programme
Hyderabad town in Andhra
Pradesh costing Rs. 344.08 crore was taken up for pollution abatement programme
Yamuna Action Plan
Phase-II costing Rs.624.00 crore was taken up for pollution abatement programme
Gomti Action
Plan Phase-II costing Rs.263.26 crore was taken up for pollution abatement
programme
ECOLOGY AND ENVIRONMENT
80. BOTANICAL
SURVEY OF INDIA (BSI), CALCUTTA
(Rs. in Crores)
|
Name of the activity |
Budget Estimate |
Actual Expenditure |
Physical
Target |
Physical Achievements |
Reasons for Short fall, if any |
||
|
|
Plan |
Non Plan |
Plan |
Non Plan |
|
|
|
|
BOTANICAL SURVEY OF INDIA (Survey,
Inventorisation & Conservation of floristic diversity of India) |
6.5 |
12.62 |
5.96 |
10.56 |
- |
- |
- |
|
1. Collection of Specimens |
NA |
NA |
NA |
NA |
Target cannot
be fixed |
Collected ca 9,500
field nos. including lower groups of plants viz. Algae, Fungi, Lichens,
Bryophytes and Pteridophytes. |
NA |
|
2. Preservation of
specimens |
NA |
NA |
NA |
NA |
-do- |
Preserved ca 5,600 specimens |
NA |
|
3. Specimens identified |
NA |
NA |
NA |
NA |
-do- |
Identified ca 3,900
specimens |
NA |
|
4. Documentation of Phytodiversity (National Flora Regional Flora State Flora
&District Flora) |
NA |
NA |
NA |
NA |
436 species belonging to 14 families for National Flora and 3235
species of 9 State Flora. |
Work on 400 species of 14 families for National Flora and 2895
species of 9 State Flora completed. |
Shortfall due
to shortage of manpower |
|
5. Documentation of Phytodiversity (National Flora Regional Flora State Flora &
District Flora) |
NA |
NA |
NA |
NA |
436 species belonging to 14 families for National Flora and 3235
species of 9 State Flora. |
Work on 400 species of 14 families for National Flora and 2895
species of 9 State Flora completed. |
Shortfall due
to shortage of manpower |
|
6. Documentation of Traditional knowledge of plants
(Ethno-botanical Studies) |
NA |
NA |
NA |
NA |
Documentation of traditional knowledge of plants form Sambalpur
district of Orissa, Darjeeling and Jalpaiguri districts of West Bengal and
Jharkhand state |
Documented traditional knowledge of 108 plants collected from
Sambalpur, Darjeeling and Jalpaiguri districts. |
Work
on Jharkhand State could not be
started as the scientist concerned met with an accident and is bed ridden. |
|
7. Ex-situ conservation
of endangered, endemic, economic & ornamental plants |
NA |
NA |
NA |
NA |
Target cannot
be fixed |
Germplasm of 25 rare, endangered and wild relatives of
ornamentals & medicinally important plant species conserved, multiplied
& maintained. 15 rare/ threatened, 65 medicinal/economic important and 65
ornamental plant species introduced for ex-situ
conservation. |
NIL |
|
8.
Publications (Books &
Journals) |
0.11 |
0.01 |
0.16 |
NIL |
9 books and 2 journals |
9 books
(including 3 books in press) and 3 journals (including one Journal published
in Hindi) |
Printing of three books is delayed by press due to technical
problems |
81. ZOOLOGICAL
SURVEY OF INDIA (ZSI), CALCUTTA
(Rs. in Crores)
|
Name of Activity |
B E |
Actual Expndt |
Physical Targets |
Physical Achievements |
Reasons for shortfall |
|
ZSI |
5.90 |
5.86 |
Exploration & Survey of State Fauna, Ecosystem – 80 surveys |
80 Surveys
completed |
Nil |
|
|
|
|
Status Survey
of Endangered Species – 14 surveys |
13 surveys |
1 Due to non receipt of
permission from Forest Authorities to visit Protected Area |
|
|
|
|
Taxonomic studies |
Manuscript
of two ecosystems and two states is in printing stage and one study is in
progress |
Nil |
|
|
|
|
Publication – 30 books |
42 books
published : Two
vol. of Fauna of India published Records
of ZSI Vol. 102(part3-4)publsihed State
Fauna – 6 vol. Published of two states Ecosystem
– 3 books published Fauna
of Conservation Area - 3 books Published Handbook
& Field guides – six Published Occasional
Papers – 14 books published (No. 211-225) Others
– 3 books published |
Delay
in printing by the Govt. Press caused delay in time target |
|
|
|
|
Training Programme |
2 conducted |
Nil |
|
|
|
|
Sale of Publication |
Rs. 7.00 Lakhs |
Nil |
|
|
|
|
E I A Studies |
Two completed |
Nil |
|
|
|
|
Computerisation |
50,000 data entries |
Nil |
|
|
|
|
ENVIS |
One News letter publishe |
Nil |
82. NATIONAL MUSEUM OF NATURAL HISTORY (NMNH)
(Rs. in Crores)
|
Name of the
activity |
B.E. |
Actual Expdt. |
Physical target
|
Physical
achievements |
Reasons for
short-fall, if any |
|
7.00 |
6.70 |
Acquisition
of land and construction of building for NMNH. Creation
of infrastructure and updating the exhibits Continuation
of Educational & Extension services. |
Not
achieved. The matter is being pursued
by the Ministry of Environment & Forests. In
order to develop the galleries, the School of Planning & Architecture has
been appointed as Consultant. The report has been received and is under
scrutiny. Achieved. |
|
|
Regional Museum of Natural
History, Mysore |
|
|
Planning,
designing & preparation of Exhibits for 2nd Phase Gallery development. |
Work
in progress. |
|
|
|
|
|
Educational
activities and extension services for School children and various Educational
Institutions. Published
Museum Literature on various topics in Kannada. |
Achieved Achieved |
|
|
Regional Museum of Natural
History, Bhubaneswar |
|
|
Establishment
of Office, Technical block, Reserve Collection Room and Library. Preparation
of theme based exhibits for Ist Phase Gallery, Discovery Center. Simultaneously
planning for North-East, Evolution and conservation Galleries in 2nd
phase. Taking
up of Popular publications for Environment Educational Activities. Collection,
acquisition and documentation of display materials along with initial
planning of digital Photo-Lab. Furnishing
of conference hall with public address system. |
Achieved. Achieved. Theme
pertaining to Gallery develop-ment is already under way. Collection and
modelling of display material for Conservation Gallery in progress. A
Museum Brochure both in English and Oriya, has been published. Photographs of Campus diversity already
displayed in the Museum. Collection,
acquisition of display mat-erial has been achieved. Few specimens are
received from RMNH, Mysore and Nandan Karan from local collection. Photo documentation in progress. Furnishing
completed. Public address system needs to be procured and installed. |
Priority
was targed for inauguration. In
respect of Public address System may be taken up in next Financial year. |
|
Regional Museum
of Natural History, Bhopal. |
|
|
Discovery
Center Renovation
of 1st Phase Gallery. Setting
up of Bioscience Computer facility. Development
of Central Courtyard Exhibits. Educational
& extension programmes. Planning
for 2nd Phase Gallery. |
Achieved. Partly
achieved. Achieved Work
in progress. Achieved. Not
achieved |
Due
to Air-conditioning work in Galleries Due
to air-conditioning works by CCU. |
83. ENVIRONMENTAL
EDUCATION, AWARENESS & TRAINING
( Rs. in crores)
|
S.No. |
Name of the activity |
BE |
Actual exp |
Physical Target (upto Nov.
04) |
Physical |
Reasons for shortfall, in
any |
|
1. |
Env.
Edu. & Trg. i) National Environment Awareness Campaign@ (NEAC) ii)
Eco-clubs@ (iii)
Seminars/Symposia/Workshops@ (iv) Grant in aid to Professional
Societies & Institutions and publication of resource material. |
17.0 |
18.99 4.38 |
Different
activities under the campaign |
The
campaign is in advance stage and would be completed in time |
NIL |
|
|
- |
7.70 |
- |
|
|
|
|
- - |
0.325 0.024 |
- New proposals will be considered. Projects funded earlier will be monitored and remaining grant
released. |
108 |
NIL |
@ No separate allocation has been made for these programmes.
84. ENVIRONMENTAL
INFORMATION SYSTEM (ENVIS)
(Rs. in crores)
Name
of the Activity
|
BE
|
Actual Expenditure |
Physical Targets/ Achievements |
ENVIS
|
2.712 |
2.5 |
* |
-
25
ENVIS-Centres have been set up so far on subject-areas related to environment
were funded during the year. All the
ENVIS Centres have developed their web site and information can be accessed
through internet directly. All the 25 centres also publish Envis news letter
regularly.
-
The
home-page of the Ministry at URL : http./envfor.delhi.nic.in is updated by
ENVIS periodically . Query–response service is also being provided.
-
ENVIS
continues to publish a quarterly newsletter namely ‘Enviro News’ reporting
various programmes, achievements, laws rules, clearances etc. Four issues of the Newsletter were published
during 2003-2004.
-
Two
volumes of Paryavaran Abstract were also published.
-
ENVIS
successfully implemented the Sustainable Development Networking Programme
(SDNP) supported by UNDP and IDRC, Canada.
A web site at URL: http.//sdnp.delhi.nic.in has been developed and is regularly updated.
-
The
Environmental Management Capacity Building Project (EMCB) for strengthening
ENVIS under World Bank assistance is being implemented with effect from
1.1.2002. 85 ENVIS Nodes have been set
up so far in Institutions and NGO’s specialised in various subject areas
related to environment.5 New Nodes are to be set up. The project had also been
extended till 30-6-2004.
-
The
SFC Memo of the existing ENVIS Scheme has been modified and approval of
Secretary(E&F) has been obtained.
-
Annual
Report of the Ministry (2003-2004) was published by ENVIS.
-
A new website www.envis.nic.in was designed, developed and
launched on 5th June 2003 by the Hon’ble Vice President of India. The
site connects 59 of the 85 Nodes which also publish ENVIS -Newsletter.
-
A
compendium on the ENVIS-Centre activities has been compiled and is being
published.
-
For
monitoring the activities of the Nodes, 7 Technical Committees have been
constituted. Out of 55 subject specific nodes 42 have been visited so far.
-
3
training courses and 2 performance evaluation workshops were held for the
established Nodes.
85. CENTRES OF EXCELLENCE
(Rs. in
Crores)
|
Name of the
scheme |
BE |
Actual
Expdt. |
Physical Target and Achievements
|
|
CENTRES OF
EXCELLENCE |
8.00(P)
1.35
(NP) |
7.60 (P) 1.48 (NP) |
There are nine Centres of
Excellence under the Scheme, in different thrust areas of environment. All the Centers continued their ongoing
activities in respective fields, as approved by respective Governing
Councils/Board of Governors. |
86. NATIONAL NATURAL RESOURCES OF MANAGEMENT SYSTEMS
(NNRMS)
(Rs. in Crores)
Name
of the Activity
|
BE
|
Actual Expenditure |
Physical Targets/ Achievements |
NNRMS
|
1.50 |
1.5 |
** |
** Physical
Targets/ Achievements
- On-going projects and six new projects under the areas have been supported under the schemes.
- Monitoring of the on-going projects has been taken up
so far.
(Rs. in Crores)
|
Name of the Activity |
BE |
Actual Expdt. |
Physical Target |
Physical Achievement |
|
Environment
Impact Assessment |
2.80 |
2.78 |
The target
set for EIA is that the proposals received for environmental clearance in the identified sectors have to be considered and decision taken within
a period of 120 days after submission of
complete information by the project
authority. This target is generally adhered to. |
Project cleared – 266 Project Pending- 164 Total
-400 |
88. CLEAN TECHONOLOGY
(Rs. in crores)
|
Name of the Activity |
BE |
Actual Expdt. |
Physical Target |
Physical Achievements |
Reasons for short-fall in any |
|
Development and promotion of clean technology |
3.50 |
.8544 |
To
take follow-up action on the out come of various studies undertaken under
this Programme. |
*
The results of various studies were circulated amongst all the stakeholders
for follow-up action. |
Due to non receipt of utilisation
certificates and receipt of incomplete proposals funds could not be released as targeted |
89. INDUSTRIAL POLLUTION ABATEMENT THROUGH
PREVENTIVE STRATEGIES
(Rs. in Crores)
|
Name
of the Activity |
B.E. |
Actual
Expenditure |
Physical
Targets |
Physical
Achievements |
Reasons
for short fall, if any |
|
Industrial
Pollution Abatement through Preventive Strategies |
100.00 |
30.23 |
Preparation for environmental audit update sectoral
guidelines |
All the projects on environmental audit,
mapping, baseline information in Kaveri Basin, Waste Minimisation project
etc. |
|
90.
ASSISTANCE FOR
ABATEMENT OF POLLUTION AND ENVIRONMENT POLICY & LAW
(Rs. in Crores)
|
Name of Activity |
BE |
Actual Expdt |
Physical Targets |
Physical Achievements |
Reasons for shortfall, if any |
||
|
I. Assistance for Abatement of Pollution,
Environment Policy & Law |
|||||||
|
Environment Policy &
Law |
0.25 |
0.4492 (The outlay was subsequently increased to 35.00 lakhs. The amount utilised over and above the
outlay was met from the Major Head Assistance for Abatement of Pollution, environment Policy & Law) |
|||||
|
Environment Policy &
Legislation |
|
|
Formulation
of Draft National Environment Policy |
The Ministry initiated the process of formulation
of a "National Environment Policy (NEP) . The task of preparing a base
paper on the draft NEP was assigned to The Energy Research Institute (TERI). |
|
||
|
|
|
|
Amendment
of Environment (Protection) Act, 1986 |
A draft Bill prepared for amendment
of Environment (Protection) Act, 1986 |
Under
process |
||
|
|
|
|
Integration
of Economic Instruments to internalise the cost of pollution and conserve
resources, particularly, water |
With a view to integrate Economic Instruments to internalise the cost of pollution and
conserve resources, particularly, water, a Study was assigned on
"Estimation of Pollution Load and Abatement Cost in Select
Industries" for the purpose of Water Cess to National Institute
of Public Finance & Policy (NIPFP) which was completed during the
year. |
|
||
|
|
|
|
Amendment
of Water (Prevention & Control of Pollution) Cess Act, 1977 |
The Water (Prevention and Control of Pollution)
Cess Act, 1977 amended in March 2003
was enforced by way of issue of a notification in May 2003. |
|
||
|
Eco Mark Scheme |
|
|
Publicity
to Eco-mark Scheme |
The
activities for building awareness as regards the ‘ECO-MARK’ Scheme were
continued. MPPCB had held workshops
in this regard. |
|
||
|
|
|
|
Assistance
to Comparative Testing Programme |
A
Project for Comparative Testing of five products viz., Copier Papers, Dry Cell
Batteries, Tubular Fluorescent Lamps (36W), Exhaust Fans –(Domestic
Ventilating Fan), and Edible oil (soyabean oil) |
|
||
|
Trade & Environment |
|
i) Policy-oriented studies: A few studies
(on Multilateral Agreements, WTO Agreements, environmental certifications,
National environmental standards and their implications on trade and vice
versa etc.) including country-specific case studies will be undertaken with
the help of concerned ministries and institutions. ii)Workshops, seminars and
training: Policy-oriented iii)Dissemination of
information: |
MoEF
is contributing in the area of Trade & Environment by way of providing inputs to the nodal Ministry i.e. Ministry of Commerce on policy matters with respect to environment
vis-ŕ-vis trade. Workshops / seminars
and symposia were also organised with the financial assistance provided by
the Ministry The
representative of the Ministry also participated in the 5th WTO
Ministerial Conference held in Cancun(Mexico). |
|
|||
|
Assistance
for Abatement of Pollution |
4.00 |
4.32 |
Financial assistance to states for purchase
of equipment, studies, projects,
salary support for UT PCCs etc. to meet the objectives of the Policy
Statement for Abatement of Pollution. |
During this year assistance was provided to States
for strengthening of labs and salary support for technical staff. Sanction for providing salary support to
UT PCCs were issued. |
|||
91. CIVIL CONSTRUCTION
UNIT
(Rs. in Crores)
|
S.No |
Name of the Activity |
B E |
Actual Expenditure |
Physical Target (no. of works) |
Physical Achievement (no. of works) |
Reason for short fall, if
any |
A Major Head ‘4406’
Forestry & Wild Life
|
1 |
SFSC |
0.99 |
0.99 |
1 |
2 |
|
|
2 |
IGNFA |
0.45 |
0.45 |
2 |
1 |
|
|
3 |
IGNFA(DFID) |
3.10 |
3.09 |
1 |
1 |
|
|
4 |
FSI |
0.77 |
0.76 |
3 |
3 |
|
|
5 |
R.O |
1.19 |
1.19 |
4 |
5 |
|
|
|
Total |
6.50 |
6.48 |
11 |
12 |
|
B Major Head ‘5425’
Ecology & Environment
|
1 |
BSI |
4.10 |
3.91 |
8 |
3 |
|
|
2 |
ZSI |
4.73 |
3.58 |
7 |
11 |
|
|
3 |
NMNH |
2.50 |
2.50 |
10 |
9 |
|
|
|
Total |
11.33 |
9.99 |
25 |
23 |
|
|
|
Grand Total
(A+B) |
17.83 |
16.47 |
36 |
35 |
|
92. CENTRAL POLLUTION CONTROL BOARD
(Rs. in Crores)
|
Name of Activity |
B.E. |
Actual Expenditure |
Physical Targets |
Physical Achievements |
|
CPCB |
22.00 |
21.55 |
* |
** |
* Physical
Targets
Air Pollution
Assessment/Monitoring and Control
Industrial Pollution Control
Corporate Responsibi-lities of
Envi-ronmental Pollution (CREP)
Water Pollution Assessment
Water Pollution Control
Projects Studies
Vehicular Pollution Prevention & Control
Zoning Atlas
Plastics Waste Management
Municipal Solid Waste Management
Eco-cities
** Physical
Achievements
·
Strengthened the air quality monitoring network (295 stations) by
introducing RSPM/PM10, monitoring;
·
Initiated monitoring of Benzene, Toluene, Xylene (BTX),
Poly-Aromatic Hydrocarbons (PAH), Heavy metals, etc. in critically polluted
areas/ cities;
·
Quality assurance programme for air quality measurements conducted
for SPCB personnel using ring test facility;
·
Given major thrust to control air pollution from 17 categories of
highly polluting industries. Air
Pollution has been reduced from Cement
Plants, Iron & Steel Plants, Aluminum industry, Thermal Power Plants, Oil
Refineries etc.;
·
Pollution prevention and control technologies for small-scale
industries developed and demonstrated.
· Effluent & Emission Standards have been
reviewed/developed in respect of different categories of
industry sources; oil
refineries, fertilizers & sulphuric acid, Brick kiln, stack height
regulation,
COINDS on hot-mix
plant, refractory industry, clean technology & environmental standards for
iron
& ore mining,
stone crushing and toxicity based standards under MINAS.
* As a follow up of CREP
programme, Task Forces have been set up for Thermal Power Plants,
Cement Plants, Iron
& Steel Industries, Non-Ferrous Metallurgical Industries (Cu, Pb, Al), Oil
Refineries and
Petrochemical to implement the CREP recommendations.
·
New water quality criteria for water quality management have been
prepared;
·
Total number of water quality monitoring stations have been
increased from 507 to 784.
·
86 polluted river stretches have been identified for
preparation of action plan with SPCBs
to control the water pollution in these stretches.
·
CETP performance evaluation study in Gujarat, Maharashtra, Tamil
Nadu and Uttar Pradesh have been conducted.
·
6086 Km. Of riverine
length where BOD is more than 6 mg/l
have been identified to take further action to implement the action
plan.
·
Major thrust have been given to control water pollution from 17
categories of highly polluting industries, specially in Distilleries, Paper and
Pulp, Pesticides, Chlor Alkali Plant, Tanneries etc.
·
851 industries those discharging effluents directly to
rivers/lakes have been identified and to take specific action through concerned
SPCBs
·
In order to obtain regular and reliable data, CPCB has
started regular and organised
Analytical Quality control (AQC) exercise for about 110 laboratories of
SPCBs/PCCs and other recognised laboratories.
· Ground water
quality on flood prone area of river Yamuna has been carried out at 50
locations.
CPCB’s water lab has completed
necessary documen-tation related to implementation of laboratory
accreditation system as per ISO 17025. The laboratory of CPCB has been
accreditated in the field of
chemical and biological testing.
Ambient air quality in Delhi
with respect to Lead, Sulphur Dioxide and Respirable Particulate Matter has
shown significant improve-ment during 2003 as compared to the levels in
1996. Important steps
taken to reduce the vehicular emissions
and other steps are as follows:
Ř
Improvement of fuel quality (low sulpur diesel etc.);
Ř
Lead free petrol;
Ř
Adoption of stringent vehicular norms (Bharat Stage II/III);
Ř
Use of Beneficiated Coal in Power Plants;
Ř
DG sets emission control;
Ř
Shifting of polluting industries; and
Improvement of I/M programme for
vehicles
- Zoning Atlas for siting of industries have
been finalized for 86 districts. The studies have been
completed in 34 districts for which draft
reports have been prepared.
Industrial Estate planning studies have
been taken up at micro level to identify environmental acceptability. Studies
for 12 sites have Been
completed, the draft report are ready for 3 sites and the work is in progress
for 7 sites.
- Environmental Management Plans (EMPs)
for Chennai, Indore and Bhubaneshwar hve been
completed. EMPs are mining areas of Korba coal mines and Satna limestone
belt have been
completed.
·
The State Pollution Control
Boards (SPCBs)/Pollution Control Committees have taken initiatives for
Implementing the provisions of the Recycled Plastics Manufacture & Usage
Amended Rule, 2003, which include restriction on manufacture, sale,
distribution, and use of plastic carry bags and containers less than 8 ´ 12 inches (20 ´ 30 cms) in size and having minimum thickness of 20 micron.
SPCBs/PCCs have further initiated the activities which includes;
Inventorisation of Plastics Recycling Units; Preparation of time-bound action plan on Plastic Waste management; and
Organising mass-awareness programmes.
A Pilot
project on plastic recycling process has been completed. A new machine
has been designed to process different types of plastics waste for preparing
improved recycled granules and to improve the recycling process. The newly
designed machine also takes care of limiting fugitive emissions in comparison
with the existing recycling processes. The experiments on this machine are
nearing completion.
·
Annual report indicating status of implementation of solid waste
management rules has been prepared and forwarded to MoEF.
Local bodies of Chandigarh, Dum Dum and
New Barrackpore in West Bengal and Kozhikode (Kerala) have taken steps to set
up demo-facilities for implementation of municipal solid waste rules with the
assistance of CPCB and MoEF.
The Ecocity Programme was initiated to
bring in visible environmental improvement in the identified small and medium
towns. In the first phase, the
Programme has been initiated in the towns of Ujjain (Madhya Pradesh), Puri
(Orissa), Tirupati (Andhra Pradesh), Kottayam (Kerala) and Vrindavan (Uttar
Pradesh). The project in Kottayam is
aimed at rejuvenating Munder River and Kacherikadavu Boar Jetty and Canal that
have severe siltation and pollution problems.
The project in Ujjain is aimed at area-wide improvement around Mahakal
Temple and cleaning of Rudra Sagar Lake, which is highly silted and polluted
with sewage. The project in Vrindavan is aimed at improvement of the historic
core of the town located around Rangnath Temple. The project in Tirupati is aimed at improvement of the core of
the town near Govindrajaswamy Temple.
The project in Puri is aimed at improvement around Jagannath Temple,
renovation of three of the religious ponds, shifting of garages and automobile
workshop and improvement of existing solid waste disposal facility.
93. ASSISTANCE TO BOTANIC GARDENS
(Rs. in Crores)
|
Name
of Activity |
BE |
Actual
Expenditure |
Physical
Targets |
Physical
Achievements |
Reasons
for shortfall, if, any |
|
Assistance
to Botanical Gardens |
1.5 |
1.5 |
Inviting proposals from Botanical Garden for
improvement of infrastructural facilities. |
21 Botanical Gardens were provided financial
support |
Not applicable |
94. RESEARCH AND ECOLOGICAL REGENERATION
(R&D)
(Rs. in Crores)
|
Name of the activity |
BE |
Actual Exp |
Physical Target |
Physical Achievement |
|
RESEARCH AND DEVELOPMENT |
4.5 |
4.16 |
Initiation of new projects-35 Servicing of on-going projects-160 Review of on-going projects-160 Dissemination of result of completed projects. |
Initiation of new projects45- Servicing of on-going projects-160 Review of on-going projects-160 15 executive summaries prepared of completed
projects. |
95. G.B. PANT INSTITUTE OF HIMALAYAN
ENVIRONMENT AND DEVELOPMENT
(Rs. in Crores)
|
Name of the activity |
BE |
Actual Expdt. |
Physical Targets |
Physical Achievements |
Reason for shortfall if
any |
|
G.B. Pant
Institute of Himalayan Environment & Development ·
R&D and other expenditure ·
Construction |
6.35 |
5.86 |
- Strengthening of on-going R&D programmes under 7 Core programmes - Functioning of Institute unit at Panthang (Sikkim) after completion
of construction works. |
- All Identified 38 R&D programmes continued at the HQs and through four regional units under direction of SAC and Governing Body. - The construction work at Panthang has been
completed. |
Some of the R & D activities were delayed due
to shortage of manpower. Due to pending water supply proposal shifting to
new campus delayed. |
|
Integrated
Action Oriented Ecodevelopment Research Programme (IERP) for the Himalayan Region |
0.95 |
0.97 |
Continuation
of on-going projects and sanction of new projects mainly in NE region under
the activity of IERP of the institute. |
16
new project sanctioned in NE region. Some ongoing projects were completed; a
few new programmes were also
initiated. |
----- |
96.
HAZARDOUS SUBSTANCE MANAGEMENT
(Rs. in Crores)
|
Name of the Activity |
BE |
Actual Expdt. |
Physical Target |
Physical Achievements |
Reasons for shortfall, if any |
|
Hazardous Substance Management |
9.00 (5.00 at RE stage) |
5.00 (as per HSMDs record) |
* |
** |
In view of non receipt of complete TSDF proposals from
Karnataka & T.N. , the budget of
HSMD was revised to Rs. 5.00 crores at RE Stage which was fully utilised. |
*
Physical Targets for 2003-2004
·
Finalisation
of the comprehensive National Chemical Profile.
·
Continuation
of Hazard Analysis and preparation of Off-site plans (including mock-drills,
crisis alert system etc.).
·
Setting
up of Emergency Response Centres as per modifications.
·
Provision
of financial support to Poison Control Centres.
·
Provision
of financial support to atleast four TSDFs in the country.
·
Finalization
& acceptance of the Report on Harmonization of hazardous wastes with the EXIM Policy.
·
Transfer
of the Registration Scheme to CPCB.
·
Provision
of financial support to the setting up of 2 Demonstration Plants for Management
of Municipal Solid Wastes including Plastic Wastes.
· Continuation of on-going projects and studies on hazardous waste management.
· Continuation of training programmes and workshops for creation of awareness and dissemination of information on different Rules.
· Completion of the project titled “Preliminary assessment to identify the requirements for developing a National Implementation Plan in India as a first step to implement the Stockholm Convention on POPs”.
· Finalization of the Cabinet Note for ratification of the PIC Convention.
· Finalization and Notification of the Amendments to the HW Rules, Fly-ash Notification and the Re-cycled Plastic Rules.
· Finalization and publication of guidelines/guidance documents for hazardous wastes including biomedical wastes.
·
Projects
on Fly-ash utilization.
·
Strengthening
of SPCBs/PCCs.
·
Implementation
of all time-bound tasks & activities in the area of hazardous waste
management, as per the directions of the Hon’ble Supreme Court in the matter of
WP657/95, delivered on 14th October, 2003.
** Achievements for 2003-04
· Preparation of Off-site plans for Thane, Bharuch & Ratnagiri-Satara undertaken.
· Funds released for establilishement of Emergency Response Centers at Mahad, Maharasthra and Vihskapatnam, Andhra Pradesh.
· A National Workshop on “Environmental Emergencies and Chemical Safety and the Preparation of a National Chemicals Management Profile for India” organized in January 2004 at New Delhi in collaboration with Government of Canada and UNITAR.
· A National Workshop at Delhi and 5 Regional Workshops at Bhubneshwar, Guwahati, Bangalore, Pune & Lucknow were organized on Biomedical Waste Management with financial support of the Ministry.
· A number of Training programmes /workshops supported under Chemical Safety & Emergency Planning and Management of Hazardous Wastes & Municipal Solid Wastes in different parts of the country.
· Grants provided to Phase-II of TSDF at Andhra Pradesh. Functioning of TSDFs at Maharashtra and A.P. reviewed.
· Action initiated for harmonization of hazardous wastes with the EXIM Policy of the country, based on the recommendations of a study sponsored earlier.
· Registration Scheme transferred to CPCB.
· Hazardous Wastes (Management & Handling) Amendment Rules 2003 notified on 20th May 2003.
·
Recycled
Plastics (Manufacture & Usage) Amendment Rules notified on 17th
June, 2003.
·
The
Fly ash Amendment Notification issued on 27th August, 2003.
· The Bio Medical Wastes (Management & Handling) Amendment Rules, notified on 17th September, 2003.
· Studies on measurement of dioxins and furans from incinerators of bio-medical waste management facilities in Delhi, Ludhiana & Hyderabad initiated.
· Financial assistance provided to Kozhikode city in Kerala for developing and implementing a model system for solid waste management.
· The project titled “Preliminary Assessment to identify the requirements for developing a National Implementation Plan in India as a first step to implement the Stockholm Convention on POPs” under implementation with support from GEF.
· Regular participation in the various Technical Meetings of the Basel, POP & PIC Conventions & follow-up action continued.
· The Supreme Court Monitoring Committee on Hazardous Wastes Management, constituted in November 2003 to oversee compliance to the orders of the Supreme Court in WP657/95 by various agencies, held 3 meetings and reviewed the status of compliance of various Central and State Government agencies including SPCBs/PCCs.
97. BIODIVERSITY CONSERVATION
(Rs.
in crores)
|
Name of Authority |
BE |
Actual Expdr |
Physical Target |
Physical Achievements |
Reasons for shortfall, if
any |
|
Bio-diversity Conservation |
3.50 |
3.00 |
* |
** |
NA |
* Physical Target
-
Notification
to bring various provisions of the Biological Diversity Act into force.
-
Implementation
of Cartagena Protocol on Bio safety.
-
Matters
relating to the Genetic Engineering Approval Committee ( GEAC).
**Achievements:
-
The Biological Diversity Act, 2002 were
implemented through notification of Biological Diversity Rules, 2004.
-
The National Bio-diversity Strategy and Action
Plan ( NBSAP) has been finalized.
-
Matters
relating to Cartagena Protocol on Bio safety were pursued.
-
Matters
relating to the Genetic Engineering Approval Committee ( GEAC), GM Food and
Transgenic Crops was pursued.
98. CONSERVATION &
MANAGEMENT OF WETLANDS, MANGROVES AND CORAL REEFS
(Rs. in Crores)
|
Name of the Activity |
BE |
Actual Expdt. |
Physical Targets |
Physical Achievements |
Reasons for shortfall, if any |
|
1. MAPs
and R&D activities on Wetlands |
6.00 (BE) 6.54 (RE) |
6.44 |
15 MAPs on Wetlands |
18 MAPs and 09 on-going research projects. |
Nil |
|
2. MAPs
and R&D activities on Mangroves & coral areas |
5.00 (BE) 5.50 (RE) |
5.27 |
25 MAPs on Mangroves & 4 MAP on Coral reefs. |
Achieved as per target. |
-
Complete physical targets could not be achieved due to non-receipt of UCs and
MAPs from the States. |
99. BIOSPHERE RESERVES
(Rs.
in Crores)
|
Name of Activity |
BE |
Actual Expenditure |
Physical Targets |
Physical Achievements |
Reasons for shortfall, if
any |
|
MAPs and Research on BRs |
6.00
(including NE region) |
6.00 |
13
MAPs on BRs and 10 research projects |
11
MAPs on BRs and 15 research projects |
N.A. |
100. INTERNATIONAL COOPERATION
(Rs. in crores)
|
Name of the Activity |
BE |
Actual Exp. |
Physical Target |
Physical Achievements |
Reasons for shortfall, if
any |
|
India Canada Environment Facility (ICEF). |
0.01 |
Nil |
Implementation
of approved sub-programmes. |
- |
No commodity was donated by Canada during this year. |
|
IC
Activities. |
1.50 |
1.46 |
Existing activities to continue. |
Existing activities continue |
|
|
SoE |
1.25 |
1.25 |
Existing activities to continue. |
-do- |
|
Achievements:-
1)
Follow-up,
implementation, monitoring and evaluation of the approved projects under the
UNDP-CCF/GEF Programme.
2)
Agreement
between Govt. of India and the Govt. of State of Israel on Cooperation in the
field of Protection of Environment.
3)
Meeting
of the 2nd GEF Empowered Committee held on 22nd December
2003.
4)
A
Senior Level delegation participated in the 11th Session of Commission
on Sustainable Development (CSD) which took place in New York from 28th
April to 9th May, 2003.
5) Nomination of officials for training abroad in the field of environment & forests.
6)
India
participated in the inter-governmental consultation on strengthening the
scientific base of UNEP held in Nairobi on 14-15 January 2004.
7)
India
participated in the second meeting of the India-EC Joint Working Group on
Environment held on 13th January 2004 at Brussels.
8) India participated in the 8th Special Session of UNEP
Governing Council/GMEF
from 29-31 March, 2004 at
Republic of Korea
9)
Follow-up
on the bilateral Memorandum of Understanding signed with Germany, Russia,
Turkmenistan, Tajikistan, Vietnam, China and Iran.
10)
Follow-up
on the Indo-US and Indo-Brazil Common Agenda on Environment, India Finland JWG.
11)
Follow-up
on the action points related to SAARC Environment Ministers Meetings.
12)
Building
a strong pipeline of new GEF proposals, follow up and implementation of
approved GEF projects, to monitor and evaluate their progress.
13)
Assessment
of the funding objectives of various lending and donor agencies (multilateral
and bilateral) to facilitate access of more resources for projects, preparation
of a pipeline of projects for external funding.
15) MoEF participated in
various Conferences of Parties/Meetings related to UN
Convention on Climate
Change, Biodiversity, Desertification, Montreal Protocol, Basel Convention and other Conferences in the field of
environment and forests.
16) Implementation of UNDP/CCF Programme.
17) Implementation of UNDP/GEF Small Grants
Programme.
101. ADAPTATION & CAPACITY
BUILDING PROJECT ON CLIMATE CHANGE
(Rs.
in crores)
|
Name of the Activities |
BE |
Actual Expdt.. |
Physical Targets |
Physical Achievements |
|
Adaptation & Capacity Building Project on
Climate Change |
1.00 |
0.94 |
Activities/
conferences relating to Adaptation & Technology Transfer would be
undertaken |
A
Climate Change Technology Bazaar was organised from 10-13 November,
2003. Besides, a Round Table on CDM,
workshop on Climate Change & Energy, Adaptation Research Workshop,
Workshop on Climate Change & Clean Energy Technologies, Workshop on
Climate & Development, meeting of the Expert Group on Technology
Transfer, Workshop on ‘Climate Change – Good for Environment & Business’
and another Adaptation Workshop were held during the year. The
National CDM Authority for evaluating CDM Projects was set up in December
2003, after obtaining the approval of the Cabinet. |
102. ESTABLISHMENT OF ENVIRONMENT AUTHORITIES, COMMISSIONS
AND
TRIBUNALS
(Rs. in Crores)
|
|
BE |
Actual Expdt |
Physical Targets |
Physical Achievements |
|
NEAA Loss
of Ecology (Pre. & Payment of Compensation) Authority for Tamil Nadu Env.
Pollution (P&C) Authority for NCR (the
main Scheme is being handled by IA & CP Divn. |
5.00 |
5.00 |
* |
* |
* The mandate of the NEAA is to hear
appeals with respect to restriction of areas in which any industries,
operations or process or class of industries, operations or processes shall not
be carried out of shall be carried out subject to certain safeguards under the
Environment (Protection) Act 1986 and for matters connected therewith or
incidental thereto. The Authority has
achieved this target. During the period
of its existence since 1997 only 10 appeals were filed before it till the end
of 2002-03 and all the 10 appeals have been disposed of.
Loss of Ecology (Prevention & Payments of
Compensation) Authority of the State of Tamil Nadu:
The
mandate of the Authority is to deal with situation created by the tanneries and
other polluting industries in Tamil Nadu by exercising the powers and functions
laid down in para 2 of Notification S.O.671(E) dated 30.9.96. The Authority has been carrying out these
functions as per the target.
Environment Pollution (Prevention & Control)
Authority for the National Capital Region:
The
mandate of the Authority is to exercise the powers under Section 5 of the
Environment (Protection) Act 1986 for issuing direction for compliance relating
to violation of standards for quality of environment, emission or discharge of
pollutants and to take all necessary steps to control vehicular pollution,
restriction of industries causing environmental pollution and monitor the
progress of action plan drawn by the Ministry of Environment & Forests on
Pollution in Delhi as contained in the White Paper on Pollution in ?Delhi with
an Action Plan. The Authority has been
performing its functions as per the target fixed.
103. WORLD BANK AIDED
INDISTRIAL POLLUTION CONTROL PROJECTS
The Project has ended on
30.11.2002 and its residual activities have been merged with the World Bank
aided EMCBTA Project.
104. COMMON EFFLUENT TREATMENT PLANTS (CETPs)
(Rs. in Crores)
|
Name of the Activity |
B.E. |
Actual
expdt. |
Physical
Target |
Physical Achievements |
Reasons for shortfall, if
any |
|
Common
Effluent Treatment Plants |
4.95 |
4.95 |
Construction of CETPs in the Small Scale
Industrial clusters |
The amount has been fully utilized by providing
financial assistance for construction of CETPs in the small scale industrial
clusters |
NIL |
105. REIMBURSEMENT OF WATER CESS
(Rs. in crores)
|
Name of the Activity |
B.E. |
Actual
expdt. |
Physical
Target |
Physical Achievements |
Reasons for shortfall, if
any |
|
Reimbursement
of water cess |
44.1049 |
44.1049 |
NIL |
NIL |
NIL |
106. TAJ PROTECTION MISSION
(Rs. in Crores)
|
Name
of the Activity |
B.E. |
Actual
Expdt. |
Physical
Target |
Physical
Achievements |
Reasons for
shortfall, if any |
|
Taj
Protection Mission |
33.00 |
NIL |
NIL |
NIL |
No new proposal has been submitted by
the Govt. of U.P. |
107. ALL INDIA COORDINATED PROJECT ON
TAXONOMY (AICOPTAX)
(Rs.in crores)
|
Name of the Activity |
BE |
Actual Expenditure |
Physical Targets |
Physical Achievements |
|
AICOPTAX |
1.50 (BE) |
1.20 |
Continuation of various units. |
The units continued their activities. |
108. ENVIRONMENTAL MANAGEMENT CAPACITY BUILDING
TECHNICAL ASSISTANCE PROJECT
(WORLD BANK AIDED)
(Rs.in crores)
|
Name of the Activity |
BE |
Actual Expendt. |
Physical Targets |
Physical Achievements |
Reasons for
shortfall, if any |
|
* |
** |
*** |
*Physical Targets
The activities included
under various sub-components are of continuous nature subject to fulfillment of
procedures/guidelines prescribed by the World Bank for hiring of consultants
for preparation of specific reports, conducting of training programmes,
procurement of material, holding of orientation workshops, publication of
books; preparation of guidelines for environmental impact assessment of
projects, creation of website on environmental data, funding of projects in
environmental economics/ environmental management plans, creation of awareness
about environmental issues.
** Physical Achievements
During the year the main
thrust was on completing the remaining activities during the one year extended
period of the project upto 30.6.2004 after initial shortfalls during preceding
years. The year has demonstrated a good
scenario in terms of achievement towards procurement of equipment, completion
of local & foreign training programmes, preparation of environmental plans
and reports, more and more staff trained on sound mining practices, legal
aspects of environmental issues; infusion of environmental concepts in school
curricula completed in 16 States, computerization done & several
institutions strengthened and various industrial emission and effluent standards
reviewed and developed, capacity built in environmental planning and
management.
***Reasons
for shortfall, if any
No shortfalls were faced and
in fact the shortfalls of previous years were overcome through close monitoring
& quick remedial measures
aimed at successful achievement of the objectives of the project.