CHAPTER-II C-2
REVIEW OF OVERALL PERFORMANCE DURING 2004-2005
109. INDIAN
COUNCIL OF FORESTRY RESEARCH AND EDUCATION (ICFRE), DEHRADUN
(Rs.
in Crores)
|
Name of the Activity |
B.E. |
Actual Expdt. |
Physical Target |
Physical Achievements |
Reasons shortfall if any |
||
|
|
Plan |
Non-Plan |
Plan |
Non-Plan |
*
|
||
|
General Component |
30.00 |
10.28 |
16.80 |
6.00 |
|
||
|
Education & Training |
2.00 |
1.1759 |
1.25 |
0.70 |
|
||
|
North-East |
3.00 |
- |
1.00 |
- |
|
||
Total |
35.00 |
11.4559 |
19.05 |
6.70 |
|
||
110. INDIAN
PLYWOOD INDUSTRIES RESEARCH AND TRAINING INSTITUTE (IPIRTI), BANGALORE
(Rs. in Crores)
|
Sl. No. |
Name of the Activity |
B.E. |
Actual Expdt. |
Physical Target |
Physical Achievements |
|
1 |
Inputs
to improve research capability in Labs. and experimental plant at IPIRTI as
well as Research &
Training Centre for Mechanical Wood Industries |
7.55 |
1.25 |
Research
and development work is being carried out on the projects as detailed under
(A- On-Going Projects Sl. No. 1 to 18, B
– On-Going Sponsored Projects Sl. Nos. 1 – 7 C – New projects Sl. No.1-18) |
As
detailed under D – Projects
Completed during the year 2003-04
under (a-Institute's projects completed and report published, b) Institute's
projects completed and (c-Sponsored projects completed and reports submitted
to the sponsors) |
|
|
|||||
|
2 |
Establishment
of Particle Board plant |
1.08 |
- |
- |
- |
|
|
TOTAL |
8.63 |
1.25 |
|
|
Ongoing Research projects
for 2004-05
A)
Ongoing Institute projects
|
Sl. No. |
Code No. of
the project |
Title of the
project |
|
1 |
WC/Process/13/2001 |
Development of Machine for efficient veneer finger
jointing technique |
|
2 |
WC/Testing/15/2001 |
Strengthening of Non-destructive test facilities
and development of test methods for panel products |
|
3 |
NWC/Panel/17/2003 |
Development
of Panel Material from Woven/non-woven Coir-Mat with Veneer and Bamboo Mat |
|
4 |
LP/18/Equip/2002 |
Enhancement of Utilization of Plantation Timbers
through edge lamination |
|
5 |
WC/19/Process/2002 |
Study on preferential absorption of chemicals in
dip diffusion process of veneer treatment with fixed type of preservative CCB |
|
6 |
WC/20/Resin/2002 |
Development of UF resin with low formaldehyde
emission for particle board |
|
7 |
WC/21/Testing/2002 |
Design and Development of Mechanized Model of
E-Tester |
|
8 |
WC/22/Testing/2002 |
Effect of cyclic and Accelerated Water Resistance
tests on bending properties of composites from wood and other natural fibres including bamboo (Phase 1: Plywood) |
|
9 |
NWC/23/Testing/2002 |
Effect of Age of Bamboo on strength properties of
BMB and BMCS |
|
10 |
NWC/24/Testing/2002 |
Life cycle analysis of BMCS |
|
11 |
WC/Resin/25/2002 |
Development of Powder PF Resin for bamboo mat
composites |
|
12 |
WC/Resin/28/2002 |
Development of improved Cardanol phenol
formaldehyde (CPF) resin |
|
13 |
NWC/30/Panel/2002 |
Development of Bamboo mat based ridges for bamboo
mat corrugated sheet roofing
system |
|
14 |
WC/31/Stand/2003 |
Study of alternate test
method for 72 hours boiling test prescribed
for plywood and block board in Indian Standard Specification |
|
15 |
WC/32/Panel/2003 |
Development of modified
flush door shutter to minimise the use of
wood in flush door shutter manufacture and also for the efficient use of
flush door shutter as domestic and toilet door purposes |
|
16 |
ESL/33/2003 |
Investigation on the use of New Environment friendly preservative
chemical Spinosad ( a derivative of Spinosyn A and Spinosyn D. Emperical
formula; C41H65NO15&C47HO&NO10 respectively) for plywood protection |
|
17 |
NWC/34/Panel/2004 |
Development of Different
grades of Bamboo Particle Board and wafer board |
|
18 |
WC/29/AAdhesive/2002 |
To develop an effective & economic PF resin adhesive incorporated with toxin chemicals to perform
duel function both as bonding agent and glue line poison both against insect
and fungus |
B)
Ongoing Sponsored projects
|
Sl. No. |
Code No. of
the project |
Title of the
project |
|
1 |
SP/28/2000 |
Field Demonstration &
Development of bamboo based composites/panels for housing in NE sponsored by MoEF (implemented in
collaboration with BMTPC) |
|
2 |
SP-35/ESL/2004:
|
Evaluation of Bifenthrin
against borers and termites for protection of wood and plywood |
|
3 |
SP-37/I-Beam/2002 |
Development of I-Beam using laminated veneer
lumber made from
plantation timbers and bamboo mat board – An exploratory study sponsored by BMTPC |
|
4 |
SP-38/Bananna-Sheath/2002 |
Upscaling of lab. Technology for making panels
from banana sheath developed by Regional Research Laboratory, Trivandrum and
approved by BMTPC |
|
5 |
SP-39/2003 |
Setting up of production
and training centre for bamboo machineries near Magadi sponsored by BMTPC |
|
6 |
SP-41/WC/TNFDC/2003 |
Study on the suitability of plantation grown timbers for the
manufacture of general purpose plywood – sponsored by Tamilnadu Forest
Development Corpn. |
|
7 |
SP-42/2003 |
Joint Investigative study with TIFAC to prepare technology package
for manufacture of Bamboo Board (Laminates) |
C) New Project proposals approved by
RAC on 18th August 2004
|
1.
|
NWC/34/Panel/2004: |
Development of Pilot Scale facilities for Research
and Training for Manufacture of Particle Board and Oriented Strand Board |
|
2.
|
WSL/35/Testing/2004 |
Effluent treatment of chemicals discharged from
plywood industries |
|
3.
|
WSL/36/Testing/2004 |
Pest risk assessment of
importation of unprocessed logs from different countries |
|
4.
|
WC/37/Data/2004 |
Engineering Data
generation for new panel materials from wood and other natural fibres
including bamboo |
|
5.
|
WC/38/Stand/2004 |
Establishment of seasoning
facility for training and demonstration |
|
6.
|
WC/39/Furniture/2004 |
Product Development from
New Generation Eco-friendly Material |
|
7.
|
NWC/40/Grading/2004 |
Framing Grading rules for
bamboo for structural purposes |
|
8.
|
WC/41/Equipment/ 2004 |
Development of Mechanized
log centering device for 4 ft Peeling lathe for increased recovery of full
width veneer sheets and higher yield from plantation timbers |
|
9.
|
NWC/42/Panel/2004 |
Development of Floor Tiles
– Glazed and Mat Finish from Bamboo strips |
|
10.
|
NWC/43/Resin/2004 |
Study on resin intake of
bamboo mats at each stage of dipping and its effect on resin properties on
bamboo mats and residual resin solution |
|
11.
|
WC/44/Panel/2004 |
Development
of Compreg from Bamboo Mat Veneer from Plantation Timber or in combination |
|
12.
|
WC/45/Panel/2004 |
Development of High
Density Shuttering Grade Plywood using Bamboo Mat and /veneers from
Plantation Timber |
|
13.
|
WC/46/Panel/2004 |
Development of Fire
Retardant Flush Door |
|
14.
|
WC/47/Panel/2004 |
Development of Veneer –
Bamboo Mat Flexi Ply |
|
15.
|
WC/48/Composites/ 2004 |
Development of Cellular
Core Flush Door from Solid Bamboo Rings and Plantation Timber |
|
16.
|
WC/49/Stand/2004 |
Development of Test
methods for joinery |
|
17.
|
WC/50/Testing/2004 |
Design, fabrication and
testing of bamboo trusses and grid walls of larger spans |
|
18.
|
WC/51/Testing/2004 |
Design, fabrication and
testing of two storey skeleton structure |
D) Projects complete during the year
2004-05
a) Institute's projects completed and
report published
|
Sl. No. |
RR/TR No. |
Title of the Report |
|
1 |
RR 128 |
A
New approach to improve the Fire Retardancy of Plywood |
|
2. |
RR 129 |
Dursban
50 WT as a Glue Line Additive for Protection of Plywood against Borers |
|
3. |
RR 130 |
Study
on Pollution in Plywood Industries |
|
4. |
TR 103 |
A
study on Import of Timber |
|
5. |
TR 105 |
Development
of industrial Model Veneer Tenderizing Equipment |
b) Institute's
projects completed:
|
Sl. No. |
Code No. of the Project |
Title of the project |
Remarks |
|
1 |
ESL/10/Panel/CSL/2002 |
Enhancement
of performance of Chloropyriphos insecticide by resisting its fungal
degradation by the use of suitable fungicide |
Report
under vetting |
|
2 |
CFS/15/95 |
Evaluation
of efficacy of some of the eco-friendly preservatives for protection of
plywood |
Copy
kept in the Library & not published |
|
3 |
NWC/09/Panel/CFS/2000 |
Development
of Jute overlays for panel products |
Report
Under printing – R.R. No.131) |
|
4 |
NWC/01/2000/Panel |
Development
of panels from bamboo using bamboo curtain for transport flooring |
Report under vetting |
c) Sponsored projects
completed and reports submitted to the sponsors
|
Sl. No. |
Code No. |
Title of the project |
|
1.
|
SP-20/99 |
Evaluation of Lindane 20 EC as glue line additive
for protection of plywood |
|
2.
|
SP 21/1999 |
Evaluation of Dursban 50 WT as a glue line
additive |
|
3.
|
SP-29/NWC/2001 |
Development of
Laboratory scale technology for making products from pine needles |
|
4.
|
SP-30/Timber/2001 |
Application of Finger Jointing techniques in product development using plantation species. |
|
5.
|
SP-32/NWC/2001 |
Exploratory investigations to develop moulded articles from coir non-woven felt |
|
6.
|
SP-33/WC/2001 |
Development of marine – shuttering and film faced plywood from silver oak (Grevillea robusta) |
|
7.
|
SP-34/2001:
|
Development of Transfer of Technology Model
(TOTEM) for Bamboo Match sticks (Part
I & II) |
|
8.
|
SP-36/LP/2002 |
Development of window/door frame from small size
Sal poles using finger jointed and lamination techniques |
|
9.
|
SP-40/2003 |
Development of techno-commercial proposal for
alternate industrial resource of bamboo in Orissa |
|
10.
|
SP-41/WC/TNFDC/ 2003 |
Study on the suitability of plantation grown
timbers for the manufacture of general purpose |
111. INDIAN INSTITUTE OF FOREST MANAGEMENT (IIFM), BHOPAL
(Rs. in Crores)
Name of the activity
|
BE |
Actual Expdt. |
Physical Target |
Physical achievement |
Reasons for short fall if any |
|
MDP/Courses & Seminars |
5.37 (Plan) 0.82 (Non-Plan) |
1.89 (Plan) 0.42 (Non-Plan) |
21 MDP 7 Workshop 5 Seminar |
6 MDP 7Workshop |
Target will be achieved within time schedule. |
|
PGDFM/MRM |
1+1 batch |
1+1 batch 43students in PGP and 20 students in MRM |
Nil |
||
|
Ph.D/Research studies/consultancy |
Ongoing Research Projects will be completed
and some new projects have been started. |
||||
|
Manpower(Salary and wages) |
275, Books and 200 Journals have been
subscribed, up to 31.10.2003. |
||||
|
Corpus fund for construction |
|||||
|
Library |
|||||
|
Vehicle |
|||||
|
Bio-aesthetic Plan |
|||||
|
Machinery/ Equipments |
|||||
|
Stores (Furnitures & Fixtures) |
|||||
|
Common expenses |
|||||
112. STATE FOREST SERVICE AND RANGERS TRAINING
COLLEGES
(Rs. in Crores)
|
Name of the Activity |
BE |
Actual Expdt. |
Physical Targets |
Physical Achievement |
Reason for shortfall, if any, |
|
State Forest Service and Rangers Training colleges
|
1.08+ 0.50* |
0.53+ # |
|
|
|
|
a) Training of SFS officers at SFS College,
Dehradun. |
|
|
1 Course |
1
Course |
No shortfall. 2003-05 batch undergoing 2nd year
training & 2004-06 batch started w.e.f. 1-4-2004. |
|
b) Training of Forest Rangers in SFS College,
Burnihat/Coimbatore &EFRC, Kurseong. |
|
|
3 Courses |
* |
2 batches 2002-04, & 3 batches 2003-05 are
undergoing training. *3 batches 2004-06 which were due to start from
November, 2004 has been rescheduled to start from April, 2005 due to
implementation of new rule & syllabus w.e.f. April, 2005. |
|
c) Refresher Courses for in-service SFS officers
with 30-35 participants in each course. |
|
|
7 Courses |
6
Courses |
No shortfall.
Target will be achieved within time schedule. |
|
d) Basic Courses on Computer Application in
Forestry for in-service SFS officers with 25-30 participants in each course. |
|
|
7 Courses |
4
Courses |
No shortfall.
Target will be achieved within time schedule. |
|
e) Advance Courses on Computer Application in
Forestry for in-service SFS officers with 30-35 participants in each course. |
|
|
4 Courses |
2
Courses |
No shortfall.
Target will be achieved within time schedule. |
|
f) Theme based courses in forestry for In-service
SFS Officers with 25-30 participants in each course. |
|
|
8 Courses |
2
Courses |
No shortfall.
Target will be achieved within time schedule. |
|
g) Two weeks course on Bio-diversity conservation
& climate change for RFOs. |
|
|
3 Courses |
2 |
No shortfall.
Target will be achieved within time schedule. |
|
h) Two weeks “Trainers Training Course” with 20
participants in each course |
|
|
2 Courses |
- |
Target will be achieved within time schedule. |
|
i) Two weeks “Refresher Course” for Range Officers
with 30 participants in each course. |
|
|
2 Courses |
1
Course |
No shortfall.
Target will be achieved within time schedule. |
|
j) Two weeks “Refresher Course” for in-service
Deputy Rangers, Foresters and Forest Guards with 30-35 participants in each
course. |
|
|
10 Courses |
7 |
No shortfall.
Target will be achieved within time schedule. |
|
k) Forestry courses for sister & other
organizations on request. |
|
|
* |
- |
*Courses will be conducted as and when the demand
received from the States/Organisation. |
|
l) Six week “Promotion Linked Training” for ACFs
with 30 participants in each course (subject to approval of ministry). |
|
|
3 courses |
|
Subject to approval of the ministry. |
* Fund is at the disposal
of Civil Construction Unit.
# May be ascertained from
CCU.
113 IN-SERVICE TRAINING FOR IFS OFFICES
(Rs. in Crores)
|
Name of the
Activity |
BE |
Actual
Expdt. |
Physical
Target |
Physical
Achievements |
Reasons for
shortfall, if any |
|
One/two-week
Compulsory Training course for IFS officers |
1.75 |
0.85 |
100% |
100% |
NA |
114. INDIRA GANDHI NATIONAL FOREST ACADEMY
(IGNFA), DEHRADUN
(Rs. in Crores)
|
Name of
activity |
BE
|
Actual
Exp. (upto Oct. 2004) |
Physical
targets |
Physical
achievement |
|
IGNFA |
2.75 (Plan) 2.82 (Non-Plan) |
1.39 (Plan) 1.66 (Non-Plan) |
1.
Training of IFS probationers.
1.
Disbursement of salary and other allowances to the staff,
officers and IFS probationers. 2.
Study tours of IFS probationers. 3.
Local field excursions. 4.
Maintenance of Govt. vehicles POL charges, communications, stationery items etc. 5.
Permanent Stores. |
1.
27 IFS probationers of 2002 batch currently under going
on the job training. 2.
25 IFS probationers of 2003 batch currently undergoing
Professional Phase training. 3.
One Induction course of SFS promoted to IFS underwent
training for 10 weeks. 4.
One compulsory course
conducted for one week training. 5.
21 IFS (P) of 2004 Batch are undergoing Foundation Course
Training at LBSNAA, Mussoorie. 6.
4 Batches of AFM Courses
conducted so far. 1. IFS (P) of 2002-2005 Course completed all
study tours. 2. IFS (P) of 2003-2006 Course are
undergoing Professional Phase Training. 3. IFS (P) of 2004-2007 Course are
undergoing Foundational Course at
LBSNAA, Mussoorie. |
115. FOREST
SURVEY OF INDIA (FSI), DEHRADUN
(Rs. in crores)
Name of the activity
|
BE |
Actual Expdt. |
Physical Targets |
Physical
Achievements |
Reasons for
shortfall, if any |
|
Survey and Utilization
of Forest Resources |
9.55 |
5.37 |
Uto
31.10. 2004 |
|
|
Activity
Forest Cover Asse-ssment i) Data
procurement ii) Data
rectification iii) Data
Classification iv) Ground
verification v)
Corrections, area calculation and map generation. |
|
|
315*Scenes 100 *Scenes 50 *Scenes 134 **Toposheets |
Worked of 9th cycle completed -
Do- -
Do- 134
toposheets (1: 250,000 scale) |
|
|
Forest Inventory i) Inventory Data Collection ii) Data checking & entry iii) Data processing
& Output |
|
|
30*+1^ Districts 30+1^ Districts 30+1^ istricts |
5 34 30 |
|
|
Inventory of TOF (Urban) i)
Inventory Data Collection ii) Data
checking & entry iii) Data
Processing & Output |
|
|
30*+1^ District 30+1^ District 30+1^ District |
5 34 30 |
|
|
Inventory of TOF (Rural) i)
Procurement of PAN data ii) Image
process. & Sample gen. iii)
Inventory Data Collection iv) Data
checking and entry v) Data
processing & output |
|
|
30*District 30+1^ District 30+1^ District 30+1^ District 30+1^ District |
40 21 8 34 30 |
|
Training
|
|
|
100 Persons |
96 |
|
|
Note: * For the Period Covering 10th Cycle (New)
** For the Period Covering 9th Cycle (Previous) ^ Work for Forest
Inventory, TOF(R) & (U) Inventory of one district of last year
(2003-2004) is to be carried out in this year.
Achievement of work for Forest Inventory, TOF(R) & (U) Inventory
up to October 2004 also includes
the back log districts of the
target for the year 2003-2004. |
|||||
116. FOREST PROTECTION AND REGENERATION
(Rs. in Crores)
|
Name of the Activity |
BE |
Actual Expdt. |
Physical Target |
Physical Achievement |
Reasons for shortfall, if any |
|
Integrated Forest Protection Scheme |
100.00 |
24.64 |
To assist all
states & UTs for prevention & control of forest fires, to develop forestry infrastructure for
forest protection and Working Plans Preparation and Survey Demarcation of
forest areas |
All states were
assisted for taking effective steps for prevention & control of Forest
fires, development of infrastructure for forest protection and preparation of
working Plan and Survey Demarcation of forest areas. |
Due to change in
funding pattern from 100% Centrally Sponsored to 75%:25% cost sharing between
Centre and States . |
117. STRENGTHENING
OF FORESTRY DIVISION
(Rs in Crores)
|
Name of Activity |
BE |
Actual Expenditure |
Target No. |
Achievement |
Reasons for shortfall it any |
|
Financial Revenue Capital |
4.00 2.00 |
2.40 0.50 |
|
60% upto October 2004 |
Since the amount was restricted upto 50% of
the total allocation and funds could not be utilized. |
|
1. Monitoring of projects approved under
FCA 1980 for compliance of stipulated conditions |
|
|
950 |
195 (April-September 2004) |
Since the amount was restricted upto 50% of
the total allocation and funds could not be utilized. |
|
2. Monitoring of projects approved under
FPA, 1980 for compliance of stipulated conditions. |
|
|
400 |
212 (April-September 2004) |
Since the amount was restricted upto 50% of
the total allocation and funds could not be utilized. |
|
3. Disposal of proposals for diversion of
Forest land up to 40 ha land under FC 1980 |
All cases received from the user agencies
through State Govts. for diversion of forest land within six weeks. |
||||
|
4. Site inspection of projects in all
State/Uts. |
All cases referred by the Ministry within
30 days. |
||||
|
5. Participation in the other meeting at
State/Uts |
All working plans referred by the State
Govt. to Regional Offices to be finalized within 2 months as per the
Ministry’s Guidelines. |
||||
|
6. Assisting Paryavaran Vahin in the
capacity of observer and technical advisors. |
All work. |
||||
WILDLIFE
118. STRENGTHENING OF
WILDLIFE DIVISION AND CONSULTANCIES FOR SPECIAL TASKS
(Rs. in Crores)
|
Name of the activity |
BE |
Actual Exp. (upto Dec ,04) |
Physical Target |
Physical Achievement |
Reasons for short fall ,
if any |
|
Strengthening of Wildlife
Division and Consultancies for Special Tasks |
4.00 |
1.40 |
No
physical target can be taken as Regional Offices salary, Office expenditure
and domestic travel expenditure are being paid under this scheme. Funds are
also provide for consultancies for special task as and when there is a proposal
for the same. |
-- |
-- |
119. ASSISTANCE
FOR DEVELOPMENT OF NATIONAL PARKS AND
SANCTUARIES
(Rs. in Crores)
|
Name of the
activity |
BE |
Actual Exp.
(As on 31.3.04 |
Physical Target |
Physical Achievement |
Reasons for
short fall, if any |
|
Assistance
for Development of National Parks/ Sanctuaries |
50.00 |
26.17 |
310 |
233 |
--- |
120. WILDLIFE INSTITUTE OF INDIA (WII)
(Rs. in Crores)
|
Name of the
Activity |
BE |
Actual Expenditure |
Physical
Target |
Physical
Achievement |
Reasons for
Short falls if any |
|
WII |
10 |
6 |
|
|
|
|
M.Sc. Course
in Wildlife Science |
|
|
12 |
8 |
The 12 seats includes 2 SARC Member & 4 Self
sponsored. But no encouraging
response from SARC and self sponsored person received even after open
advertisement |
|
PG Diploma
in Wildlife Management |
|
|
30 |
28 |
|
|
Certificate
Course in Wildlife Management |
|
|
30 |
- |
To be started w.e.f. 01.11.04 |
|
Research
Projects |
|
|
35 |
35 |
|
121. PROJECT TIGER
(Rs. in Crores)
|
No. |
Name of the
Activity |
BE |
Actual
Expenditure |
Physical
target & achievements |
|
1. |
WILDLIFE PROJECT TIGER |
25.50
(Rs.
3.00 cores for North East states including Sikkim) |
28.50
(including Rs
3.00 cores for North Eastern Region) |
To assist Tiger Reserves for conservation and
protection of tigers, habitat improvement, forest protection, construction of
staff quarters, office building, wireless network, eco-development activities
and village relocation etc. |
|
II. |
Eco
development Scheme |
This
scheme has been merged with Project Tiger Scheme during Xth Five Year Plan. |
||
|
III. |
BOTd |
This scheme has been merged with Project Tiger
Scheme during Xth Five Year Plan. |
||
122. INDIA ECO-DEVELOPMENT
PROJECT
(Rs. in crores)
|
Name of the
Activity |
BE |
Actual expdt |
Physical Targets &
Achievements |
Reasons for
shortfall, if any |
|
India Eco
Development Project |
7.25 |
6.66 |
Physical
targets have been fixed in APO of each Project
State with the approval of the World Bank and this
Ministry. The major activities being executed
include:- (i)
survey
& demarcation (ii)
improvement
of amenities (iii)
habitat
restoration (iv)
purchase of
equipment (v)
micro-planning
for village eco development activities (vi)
implementation, support and supervision (vii)
education
awareness activities (viii)
research
& monitoring activities. Major activities are to be implemented by
the Eco-development Committees formed for each village in and around the PAs The work is at various stages of implementation.. The work is being intensively monitored by the Review Missions of the
World Bank, Director/Addl. Director (PT) and by an independent body i.e. JPS Associates from time to time. |
Less
demand by States. |
123. PROJECT
ELEPHANT
(Rs. in crores)
|
Name of the activity |
BE |
Actual Expdt. |
Physical Targets |
Physical Achievements |
Reasons for shortfall, if any |
|
Project Elephant |
Plan 13.00 |
Plan 8.82 |
As proposed by States in A.P.O |
Funds released to 13 Elephants States where 24 Elephant Reserves have been declared. |
__ |
124. CENTRAL ZOO AUTHORITY (CZA)
(Rs. in Crores)
|
No.
of Programme |
BE
|
Actual
Expt. |
Physical
Target |
Physical
Achievements |
Reasons
for shortfall if any |
|
Central Zoo Authority |
16.00 |
11.00 |
As indicated below |
As indicated below |
As indicated below |
Physical Target :
Physical
Achievements :
Reasons for Shortfall if any:
It is expected that the entire grants of Rs. 1500 lakhs for general
activities of the CZA including Rs. 400 lakhs earmarked for NE Region, will be
fully utilized during the year.
125. NATIONAL ZOOLOGICAL PARK (NZP)
( Rs in crores)
|
Name of the
Activity |
B.E. |
Actual
Expdt. |
Physical
Target |
Achievement |
|
Development Activity in National Zoological Park. |
1.00 |
0.22 |
i) Celebration of Wildlife Week & Van
Mahautsava ii) Conduction of various seminars & Teacher Oriented Program iii) Publication of Guide Map, Annual Report,
Stickers etc. iv ) Preparation of Signage. v)
Maintaining the Health & Hygienic Environment for Zoo Animals. vi) Exchange of various animals with India &
Foreign Zoo for Plan Breeding
Project. vii)Upkeep of animals and their enclosure. viii) Providing facilities to the visiting public For the Capital construction work executed through CCU / CPWD, the funds
will be provided by Central Zoo Authority. However request is made to PC
Division , MOEF , to provide the fund , under PLAN CAPITAL on the same line
as done in case of PLAN REVENUE . A
list of work to be carried out is enclosed herewith as annexure ‘A’. |
The Target will be achieved in due course of time. |
126. PROTECTION OF WILDLIFE OUTSIDE PROTECTED AREAS
(Rs.
in Crores)
|
Name of the activity |
BE |
Actual Expenditure |
Physical Target |
Physical Achievements |
Reasons for shortfall, if any |
|
Protection of wildlife outside protected areas |
NIL |
Scheme not approved by Planning Commission |
- |
- |
- |
127. ANIMAL WELFARE
DIVISION
(Rs. in Crores)
|
Name of the Activity |
BE |
Actual Expdt. |
Physical Target |
Physical Achievements |
|
AWBI |
4.50(P) 0.68(NP) |
(P) 1.50(Plan) 0.68(NP) |
Grant
to 2000 organizations |
Grant
to 700 organizations |
|
Shelter |
2.75 |
1.23 |
Shelter
House – 10 Animal
Houses – 2 Rescue
Centres – 1 Activation
of SPCAs – 2 Activation
of SAWBs – 1 Workshops
– 2 |
8
Proposals have been approved (Generally
for one shelter house the organization is given grant in two
installments) |
|
Ambulance |
0.55 |
0.32 |
12 Ambulance |
7
Proposals have been approved |
|
ABC |
1.40 |
0.55 |
31,460(Dogs) |
12,359
(Dogs) |
|
NIAW |
4.00 |
2.42 |
Construction
of Main Infrastructure |
Most
of the Building Work Competed |
|
CPCSEA |
0.45 |
0 |
- |
|
|
Natural Calamity |
0.30 |
0.15 |
As
per requirement |
|
|
Scholarship |
0.05 |
0 |
- |
- |
128. NATIONAL AFFORESTATION
& ECO-DEVELOPMENT
(Rs. in Crores)
|
Name
of the Activity |
BE |
Phy.
Target for 2004-05 |
Phy.
Ach. (upto 30.11.04) |
|
1 |
2 |
3 |
4 |
|
1.
National Afforestation Scheme |
230.00 |
120
FDA projects 1,20,000ha |
46
FDA projects 51,246ha** |
|
2.
National Action Programme to Combat Desertification |
- |
- |
- |
|
3.
Eco Development Forces |
8.00 |
4 ETF
battalions |
4 ETF
battalions |
|
4. National Afforestation & Eco-development
Board (NAEB) |
29.25 |
|
|
|
a.
Grants-in-Aid to Voluntary Agencies |
19.37 |
|
56
Projects 2,800ha** |
|
b. Monitoring & Evaluation |
2.65 |
Evaluation
of 57 FDA projects & Sample Check in 50 Districts, Final Evaln. of IX
Plan schemes, Spl. Studies |
Evaluation
of 57 FDA projects & Sample Check in 50 Districts |
|
c.
Communication |
1.13 |
IPVM
awards |
2001
Awards held |
|
d.
Support to Reg. Centres |
2.45 |
7
Regional Centres |
6
Regional Centres |
|
e.
Professional & Special Services |
0.10 |
|
|
|
f. Board Secretariat |
3.55 |
|
|
|
GRAND TOTAL |
267.25 |
|
|
** This is the total area of the approved
projects.
129. NATIONAL
RIVER CONSERVATION DIRECTORATE
(Rs. in Crores)
|
Name of the Activity |
BE |
Actual Expdt. |
Physical Target (no. of schemes) |
Physical Achievements (no. of schemes completed) |
Reasons for shortfall, if any |
|
1.NRCD(Estt.) |
5.00 |
2.38 |
|
|
|
|
1.
2. NRCP |
314.20 |
203.66 |
A target of 44 projects was fixed to be completed
during the year 76
new projects sanctioned during the
year |
31
Projects have been completed between 1.4.04 and 30.09.2004 |
|
|
3. NLCP |
45.00 |
4.80 |
11 |
|
|
|
Total |
364.20 |
210.84 |
|
|
|
ECOLOGY & ENVIRONMENT
130. BOTANICAL
SURVEY OF INDIA (BSI)
(Rs. in Crores)
|
Name of the
activity |
Budget
Estimate |
Actual
Expenditure |
Physical
Target for 2004 - 2005 |
Physical
Achievements up to 31.10.2004 |
Reasons for
Short fall, if any |
||
|
Plan |
Non Plan |
Plan |
Non Plan |
||||
|
BOTANICAL
SURVEY OF INDIA (Survey,
Inventorisation & Conservation of floristic diversity of India) |
9.5 |
12.80 |
2.85 |
7.35 |
- |
- |
- |
|
1.
Exploration Surveys (Domestic Travel Expenditure under
research & investigation) |
|
|
|
|
87 field tours at NCT of Delhi, Karnataka, Gujarat, 10
Districts, 5 Islands of A & N Islands, 7 Wild Life Sanctuaries, 1 Marine
Sanctuaries, 1 Marine Nat. Park, 4 Wetlands, 1 Reserve Forest, 1 Biosphere
Reserve and 29 herbarium consultation tours at different herbaria. |
Conducted 47 field tours and 8 herbarium consultation tours. |
NIL |
|
3.
Collection of Specimens |
|
|
|
|
Target cannot
be fixed |
Collected ca 6,500
field nos. including lower groups of plants viz. Algae, Fungi, Lichens,
Bryophytes and Pteridophytes. |
NA |
|
4.
Preservation of specimens |
|
|
|
|
-do- |
Preserved ca 3,600 specimens |
NA |
|
5.
Specimens identified |
|
|
|
|
-do- |
Identified ca 2,900
specimens |
NA |
|
6.
Documentation of Phytodiversity (National Flora Regional Flora State Flora & District Flora) |
|
|
|
|
Documentation of 286 species & finalization and submission
of 2 mss. of 11 families for National Flora and 4500 species of 9 State Flora
& 4 district flora. |
Work on 156 species of 11 families for National Flora and 2500
species of 9 State Flora & 4 district flora completed. |
Shortfall due to shortage of manpower |
|
7.
Documentation of Traditional knowledge of plants
(Ethno-botanical Studies) |
|
|
|
|
Documentation of traditional knowledge of plants form Jharkhand
state |
Documented traditional knowledge of 98 plants collected from
Jharkhand state. |
NA |
|
8.
Ex-situ conservation
of endangered, endemic, economic & ornamental plants |
|
|
|
|
Collection, introduction conservation, micropropagation and
multiplication of 30 rare, endangered and economically important plant
species. |
Germplasm of 10 rare, endangered and wild relatives of ornamentals
& medicinally important plant species conserved, multiplied &
maintained. 08 rare/ threatened, 45 medicinal/economic important and 75
ornamental plant species introduced for ex-situ
conservation. |
NIL |
|
9.
Collection of Economic Plant and
Plant parts from Eastern India for enrichment of Botanical Gallery and
Herbarium of ISIM |
|
|
|
|
10 tours to various districts of Eastern India and various Govt.
Institutes to collect materials for
enrichment of Botanical Gallery and to gather knowledge for
modernisation of Botanical Gallery with Electronic Display system |
Studied and analyzed the shortfalls of the present gallery and
its exhibits and preparation of database of museum exhibit at ISIM. Conducted
Four field tours and development work of gallery and preparation of database
of museum exhibits. |
NIL |
|
10.
Publications (Books
& Journals) |
|
|
|
|
8 Books and 2
Journals will be published during the year 2004 -2005 |
The
following books have been published so far 1.
Taxonomic revision of Hedyotis
L. (Rubiaceae) in Indian Subcontinent. 2.
Pteridophytic Flora of Eastern India, Vol. 1 |
Shortfall due to technical problem in printing press. |
131. ZOOLOGICAL
SURVEY OF INDIA (ZSI)
( Rs.
in crores)
|
Name of Activity |
B E |
Actual Expdt |
Physical Targets |
Physical Achievements |
Reasons for shortfall |
|
ZSI |
6.25 |
3.26 |
Exploration
& Survey of State Fauna and
Ecosystem – 60 Surveys |
35 Surveys completed |
Nil |
|
|
|
|
Status Survey of two
Endangered Species – 7 surveys |
4 surveys |
Nil |
|
|
|
|
Taxonomic studies |
32
surveys covering 48 districts of Andhra Pradesh, Arunachal Pradesh, Bihar,
Andaman & Nicobar, Gujaratr, Karnataka, Maharshtra, Madhya
Pradesh, Rajasthan, Tamil Nadu & Uttar Pradesh. ms. of
two states & one ecosystem is in printing stage and one study in
progress |
Nil |
|
|
|
|
Publication – 33 books. |
14
Published : One
vol. of Fauna of India published, Records
of ZSI Vol. 103 (part 1-4 ) published Fauna
of States – 2; 4 volumes published Memoirs
of ZSI – one Published Ecosystem
– 1 books published Fauna
of Conservation Area - 2 books
Published Handbook
–One book Published Occasional
Papers – 4 books published |
|
|
|
|
|
Training Programme |
1 conducted |
Nil |
|
|
|
|
Sale of Publication |
Rs. 1.5 Lakhs |
Nil |
|
|
|
|
E I A Studies |
Two |
Nil |
|
|
|
|
Computerisation |
10,000 data entries |
Nil |
|
|
|
|
ENVIS |
One News Letter in press |
Nil |
132. NATIONAL
MUSEUM OF NATURAL HISTORY (NMNH)
(Rs. in Crores)
|
Name of the activity |
BE |
Actual Expdr.(Upto
10/04) |
Physical target |
Physical achievements |
Reasons for shortfall, if any |
|
National Museum
of natural History, New Delhi |
6.00 (including Rs.1.50 Crores under Capital section) |
2.57 Crores (include-ing
Rs.37.43 Lakhs under Capital section) |
Acquisition
of land and construction of building for NMNH Creation
of infrastructure and updating the exhibits Educational
& extension services Advertisement
& Publicity. |
Not
achieved. The matter is being pursued at the level of Ministry Report
from the School of Plan-ning & Architecture has been received and is
under scrutiny. Achieved. Advertisement
through hoardings on the main Bus Stops and through kiosks near the
import-ant schools have been made. |
|
|
Regional Museum
of Natural history, Mysore |
|
|
Planning,
designing and pre-paration of Exhibits for
2nd Phase Gallery Development. Setting
up of Multimedia Interactive Kiosks. Publication
of Museum Literature in Hindi, English & other South Indian languages. Educational
activities & Extension service. |
Work
in progress Nil. Planning
& identification of Experts. Achieved. |
Shortage
of human res-ource due to diversion to other Museums. Lack
of Technical staff since priority is given to gallery development. It
is very difficult to find persons who could translate scientific
terminologies. |
|
Regional Museum of Natural History, Bhubaneswar |
|
|
Acquisition
of specimens/ exhibit material. Gallery
Development Discovery
learning area. Establishment
of Administrative Block Establishment
of technical block, reserve collection room-cum-laboratory Establishment
of Library Establishment
of Conference room and auditorium Establishment
of digital Photo Lab. |
Achieved. 1st
Phase Galleries completed. The
museum has opened to public on 10.8.2004. Completed. Established.
Identification of Herpetological collection in progress. Achieved Established
and furnished. Photo
documentation is in progress. |
|
|
Regional Museum
of Natural History, Bhopal Introductory Panel (Central Indian Regions) Rivers of Central India. Development of Central
courtyard Replica of Bhim-Betika
& Open-air diorama at the entrance of 2nd Gallery adjoining of outside
area. Temporary Exhibitions. Educational/Extension
Programmes. Advertisement &
Publicity of the Museum. Introduction of Touch
Screen exhibits. Development of Website for
RMNH, Bhopal. |
|
|
Renovation
and reorganisation of Introductory Panel. Renovation
& reorganisation of existing exhibits of the Rivers of Central India. Work
will be awarded as per the norms to the selected firms/agencies. --
do -- On
various themes in frequent intervals. Various
Educational programmes for School children will be conducted. To pur
hoardings in main areas of the Bhopal City, Bhopal Railway Station &
backside of the MPSRTC Buses. Bega
Diroama and Flora & Fauna of M.P. and other Central Indian States. Web-site
for Museum activities and regular update and maintenance. |
Work
in progress. -- do -- -- do -- -- do -- Achieved. Achieved. Achieved. Work
in progress. Not
achieved. |
Due
to various other activities and programmes. |
( Rs. in crores)
|
S. No. |
Name of the activity |
BE |
Actual exp Up to 31st
March 2004 |
Physical Target |
Physical |
Reasons for shortfall, in
any |
|
1. |
Env.
Edu. & Trg. i) National Environment Awareness Campaign@ (NEAC) |
34.0* |
10.35 0.26 |
Different
activities under the campaign |
The
campaign has been launched and different activities will be completed in time
|
NIL |
|
|
ii)
Eco-clubs@ (iii)Seminars/Symposia/Workshops@ (iv)
Grant in aid to Professional Societies & Institutions and publication of
resource material. |
- |
6.49 |
- |
|
|
|
|
- - |
0.26 0.04 |
- New
proposals will be considered. Projects
funded earlier will be monitored and remaining grant released. |
87 |
NIL |
@
No separate allocation has been made for these programmes.
* RE – Rs. 24.00 crores.
134. ENVIRONMENTAL INFORMATION SYSTEM (ENVIS)
(Rs. in crores)
Name
of the Activity
|
BE
|
Actual Expenditure |
Physical Targets/ Achievements |
ENVIS
|
3.00 |
1.3851 |
* |
* Physical
Targets/Achievements
-
25
ENVIS-Centres have been set up so far on subject areas related to environment
and are being funded regularly. All the ENVIS Centres have developed their web
site and information can be accessed through internet directly. Of the 25
centres 22 publish Envis news letter regularly.
-
The
Environmental Management Capacity Building Project (EMCB) for strengthening ENVIS under World Bank assistance is being implemented
with effect from 1.1.2002. 90
ENVIS Nodes have been set up so far in Institutions and NGO’s specialised in
various subject areas related to environment.5 New Nodes are to be set up. The
project hasalso been extended till 30-6-2004.
-
The
home-page of the Ministry at URL: http./envfor.delhi.nic.in is updated by ENVIS
periodically. Query–response service is also being provided.
-
ENVIS
continues to publish a quarterly newsletter namely ‘Enviro News’ reporting
various programmes, achievements, laws rules, clearances etc.
-
ENVIS
successfully implemented the Sustainable Development Networking Programme
(SDNP) supported by UNDP and IDRC, Canada. A web site at URL:
http.//sdnp.delhi.nic.in has been
developed and is regularly updated.
-
Annual
Report of the Ministry (2004-2005) published by ENVIS.
-
Paryavaran
Abstract Vol. 21 published
-
The
new ENVIS homepage launched is being updated regularly.
-
The
quarterly newsletter namely “ENVIRONEWS” were continued to be published by
ENVIS.
-
A
compendium on the ENVIS-centre activities has been compiled and published.
-
2
performance evaluation workshops of the ENVIS nodes were held.
135. CENTRES OF EXCELLENCE
(Rs. in Crores)
|
Name of the scheme |
BE |
Actual Expdt. |
Physical
Target and Achievements |
|
CENTRES OF EXCELLENCE |
7.00(P) 1.48(NP) |
5.30(P) 1.47(NP) |
There are nine Centres of
Excellence under the Scheme, in different thrust areas of environment. All the Centers continued their ongoing
activities in respective fields, as approved by respective Governing Councils/Board
of Governors. |
136. NATIONAL NATURAL
RESOURCES MANAGEMENT SYSTEMS (NNRMS)
(Rs. in crores)
Name
of the Activity
|
BE
|
Actual Expenditure |
Physical Targets/ Achievements |
NNRMS
|
1.00 |
0.16 |
** |
** Physical
Targets/Achievements
- Six on-going projects under the areas have been supported under the schemes.
-
Monitoring
of the on-going projects has been taken up during the period.
-
Meeting
of the Bio-Resources Committee was held to identify the new thrust areas.
137. ENVIRONMENTAL IMPACT
ASSESSMENT
(Rs.
in Crores)
|
Name of the Activity |
BE |
Actual Expenditure |
Physical
Target |
Physical
Achievement as on 30.09.2004 |
|
Environment Impact Assessment |
2.05 |
0.54 |
The target set
for EIA is that the proposals received for environmental
clearance in the identified sectors
have to be considered and decision
taken within a period of 120 days after submission of complete information by the project authority. This target is generally adhered
to. . |
Total
No. –246 Project cleared- 145 |
138. CLEAN TECHNOLOGY
(Rs. in crores)
|
Name of the Activity |
BE |
Actual Expdt. |
Physical Target |
Physical Achievements |
Reasons for short-fall in any |
|
Development and promotion of clean technology |
2.00 |
.3527 |
*To
take follow-up action on the out come of various studies undertaken under
this programme. *
To initiate LCA studies in cement sector and to promote demonstration
projects relating to cleaner technologies. |
* The
on-going projects relating to LCA study
in pulp and paper industry and demonstration projects for technology
up-gradation in utensil industry as well as project on development of bamboo
based composite panels for housing in North-East are progressing well and are
nearing completion. A few workshops
involving stakeholders are being
organised. *LCA
study in cement sector and another study on Utilisation of Anode Mud wastes
generated in the zinc industry for making value added products have been
initiated. *
Development of a portable Domestic unit to remove arsenic from drinking water for a small family for a period of one month
has been launched. |
* Due
to non-receipt of utilisation certificate from Central Leather Research
Institute, Chennai further funds could not be released. * Due to technical objections raised by CPCB
on a new proposal to develop clean technology for small Pulp & Paper
units , funds could not be released. |
139. INDUSTRIAL POLLUTION ABATEMENT THROUGH PREVENTIVES STRATEGIES
(Rs. in Crores)
|
Name
of the Activity |
B.E. |
Actual
Expenditure |
Physical
Targets |
Physical
Achievements |
|
Industrial
Pollution Abatement through Preventive Strategies |
30.00 (CPCB) |
29.00(approx) |
Preparation for environmental audit update sectoral
guidelines |
All the projects on environmental audit,
mapping, baseline information in Kaveri Basin,Waste Minimisation project etc. |
140. ASSISTANCE FOR ABATEMENT OF POLLUTION AND ENVIRONMENT POLICY
AND LAW
(Rs. in Crores)
|
Name of Activity |
BE |
Actual Exp |
Physical Targets |
Physical Achievements |
Reasons for shortfall, |
||
|
I. Assistance for Abatement of Pollution,
Environment Policy & Law |
|||||||
|
Environment Policy &
Law |
0.35 |
0.1719 (The outlay was subsequently increased to 35.00 lakhs. The amount utilised over and above the
outlay was met from the Major Head Assistance for Abatement of Pollution, environment Policy & Law) |
|||||
|
Environment Policy &
Legislation |
|
|
Formulation
of Draft National Environment Policy |
A
draft
National Environment Policy has been prepared by the
Ministry. A copy of this Policy has
been circulated to all Central / State Governments for seeking comments. The draft Policy has also been put on the
website of this Ministry. Besides
considering the comments on the draft, follow-up meetings have been held with
the Central, State Governments, NGOs, Experts working in the field of
environment, Industries and other stakeholders, before finalising the draft. |
|
||
|
|
|
|
Amendment
of Environment (Protection) Act, 1986 |
Consultations continued on the draft Bill prepared
for amendment of
E(P)Act, 1986. |
Under
process |
||
|
|
|
|
The Water (Prevention and Control of Pollution) Cess (Amendment and Validation) Bill, 2004’ |
Under process , likely to be introduced in the
ensuing parliament session |
|
||
|
|
|
|
Delegation
of powers under Section 5 of Environment (Protection) Act,1986 |
Powers have been delegated to the Chairman,
Uttaranchal Environment Protection & Pollution Control Board and other
newly formed State Pollution Control Boards under Section 5 of the
E(P)Act,1986 |
|
||
|
Eco Mark Scheme |
|
|
Publicity
to Eco-mark Scheme & assistance to Comparative Testing |
The
activities for building awareness as regards the ‘ECO-MARK’ Scheme were
continued. A project has been assigned to VOICE, New Delhi for comparative product
testing of 5 products namely Copier Papers, Exhaust Fans, Fluorescent Lamps,
Dry Cell Batteries (Zinc Chloride & Alkaline) and Edible oils. |
|
||
|
ISO-14000 |
|
|
Certification
of Paryavaran Bhavan under ISO-14000 |
An
Environment Management Plan for Paryavaran Bhavan has been taken up. A Core Group has been formed for the purpose. This Core Group meets every fortnight to
sort out the problems / issues concerned |
|
||
|
Trade & Environment |
|
i) Policy-oriented studies: A few studies
(on Multilateral Agreements, WTO Agreements, environmental certifications,
National environmental standards and their implications on trade and vice
versa etc.) including country-specific case studies will be undertaken with
the help of concerned ministries and institutions. ii)Workshops, seminars and
training: Policy-oriented iii)Dissemination of information: |
MoEF continued to contribute in the area of Trade
& Environment by way of providing inputs to the nodal Ministry on various
policy matters with reference to
environment and trade. An amount of Rs. 9.40 lakhs was released to IIPA
under the 3 years consultancy project assigned to them in 2003-04, for
providing inputs on the policy issues relating to trade & environment. An
Inter Ministerial Consultation Group has been constituted under the
co-chairmanship of Secretary(E&F) & Commerce Secretary. The Group has
identified 4 generic issues for policy oriented studies. Expert Groups on
each of these issues are being set up. |
|
|||
|
Assistance
for Abatement of Pollution |
4.00 |
4.00 |
Financial assistance to states for purchase
of equipment, studies, projects, salary
support for SPCBs and UT PCCs etc. to meet the objectives of the Policy
Statement for Abatement of Pollution including Environmental Health |
During
this year assistance was provided to States and UT PCCs for strengthening of
labs and salary support for technical staff and also Environmental Health |
|||
141. CIVIL CONSTRUCTION UNIT
(Rs in Crores)
|
S.No |
Name of the Activity |
B E |
Actual Expenditure |
Physical Target (no. of works) for the year |
Physical Achievement (no. of works) |
Reason for short fall, if
any |
A Major Head ‘4406’
Forestry & Wild Life
|
1 |
SFSC |
0.50 |
0.36 |
3 |
3 |
|
|
2 |
IGNFA |
2.25 |
0.42 |
2 |
2 |
|
|
3 |
IGNFA(DFID) |
- |
- |
- |
- |
|
|
4 |
FSI |
1.00 |
0.01 |
1 |
- |
|
|
5 |
R.O |
2.00 |
0.42 |
4 |
2 |
|
|
|
Total |
5.75 |
1.21 |
10 |
7 |
|
B Major Head ‘4552’North
Eastern Areas
|
|
Lum-sum provision for
Projects/Schemes of North Eastern Areas including Sikkim |
|
- |
1 |
- |
|
C Major Head ‘5425’
Ecology & Environment
|
1 |
BSI |
4.50 |
1.00 |
7 |
7 |
|
|
2 |
ZSI |
4.00 |
0.99 |
1 |
- |
|
|
3 |
NMNH |
1.50 |
0.38 |
2 |
2 |
|
|
|
Total ( C ) |
10.00 |
2.37 |
10 |
9 |
|
|
|
Grand Total
(A+B+C) |
15.75 |
3.58 |
21 |
16 |
|
142. CENTRAL
POLUTION CONTROL BOARD
(Rs. in Crores)
|
Name of Activity |
BE |
Actual Expdt.(upto 31.1.05) |
Targets |
Achievements |
|
Project-I
(Pollution Assessment Survey & Monitoring) |
22.00 (P) 7.49(NP) |
16.55(P) 6.18(NP) |
Continuation of Water & Air quality net-work,
Assess-ment of Ground Water Quality in Metro cities, and Epidemio-logical
studies and impact of pollution on human health. |
Continued water & air quality monitoring at
784 and 295 locations. air quality monitoring network has been strengthened
by introducing RSPM/ PM10, facilities; Ground Water Quality
Monitoring Programme has also been undertaken. |
|
Project-II
(Lab Management) |
|
|
Accreditation of laboratories,
Performance Studies of STPs in Delhi & Haryana, Setting up of 16
continuous Ambient Air Quality Monitoring stations in 16 cities. Ground Water
Quality Monitoring in Delhi, |
CPCB
Laboratories at Delhi, Kolkata and Kanpur accredited by NABL for ISO: 17025
for Chemical and Biological Parameters. Monthly monitoring of all the STPs is
continued and results communicated to MoEF. Acceptance
from 7 SPCBs has been received for setting up of continuous monitoring
stations. Ground
water quality monitoring has been carried out in Delhi. About 230 ground
water samples were collected for analysis of trace metals, pesticides, and
bacteriological and physical parameters. |
|
Project-III
(Development of Standard & Ecomark) |
|
|
Finalisation
of COINDS of Coffee industry, Review of air quality standards, Develop of
emission standards for oil refinery and Fertiliser industries |
Draft
standards and guidelines on Coffee industry and Solid waste management in
slaughter houses were placed for finalisation before 18th Peer
& Core Group |
|
Project –IV (Training |
|
|
Organising/Planning
training programmes |
Thirty
training courses have been planned by CPCB during the current year. Extensive
“Training Needs Assessment” at National level has been initiated by CPCB. |
|
Project-V (Data Base Management & Library) |
|
|
Analysis of ambient air quality data
for the year 2003. Installation of software |
The Ambient Air Quality Data data for
year 2003 has been analysed for preparation of status report. The software
has been installed for automation of CPCB’s library |
|
Project-VI (Pollution
Control Enforcement) |
|
|
Implementa-tion of CREP recommendation
through various task forces. Imple-mentation of MSW, BMW, and Plastics Waste.
Mana-gement Rules, Development of Technology for Plastics Waste Dispo-sal Purchase of office accommo-dation for
CPCB’s North Zonal Office |
As
a follow up of CREP programme meeting of different sub committees of Task
Forces have been conducted to review the implementation status in the 17
categories of highly polluting industries. Completed studies for preparation
of Detailed Project Report (DPR) of Vrindavan, Ujjain, Puri and Tirupathi.
Interim report of on “Estimation of methane generation has been received form
NEERI. A project on “Inventorisation and Environmental Management of Plastics
Recycling Industries in NCR” has been awarded to NPC, Delhi. Final report on
“Re-engineering of Plastics Recycling” has been received from Jadavpur
University, Kolkata. A technology for reuse of plastics waste in road
construction is being developed in collaboration with Thiagarajar College of
Engineering, Madurai. Office Accommodation
for CPCB’s North Zonal has been purchased at Lucknow. |
|
Project-VII (Pollution
Control Technology) |
|
|
Development
of Technology for air pollution control in sugar mills. |
Scope of work has been preparation for
control of particulate matter in Sugar Mills, |
|
Project-VIII (Mass
Awareness and NGO activities) |
|
|
Publish of CPCB news letters and
reports. |
Parivesh
Newsletter on the Highlights of CPCB for year 2003 has been published. |
|
Project-IX (Hazardous
Waste Management) |
|
|
Registration
of waste oil processing units, Amendment in Hazardous Waste (M&H) Rules. |
As per
Hazardous (M&H) Rules, the oil reprocessing units has been directed to
switch over to environmentally sound process. The date has been extended to
December 2004. An amendment is proposed for regulation of import of 101
unwanted hazardous waste. |
143. ASSISTANCE TO BOTANIC GARDENS
(Rs.
in Crores)
|
Name
of Activity |
BE/RE |
Actual
Expdt. |
Physical
Targets |
Physical
Achievements |
Reasons
for shortfall, if any |
|
Assistance
to Botanical Gardens |
1.5 |
0.50 |
To provide financial assistance to 15
Botanical Garden. |
20 Botanical Gardens were recommended
for financial support |
NIL |
144. RESEARCH AND
ECOLOGICAL REGENERATION
(Rs. in Crores)
|
Name of the activity |
BE |
Actual Exp |
Physical Target |
Physical Achievement |
|
RESEARCH AND
DEVELOPMENT |
3.0 |
1.40 upto 31.10.4 |
Initiation of new projects-35 Servicing of on-going projects-160 Review of on-going projects-160 Dissemination of result of completed
projects. |
Initiation of new projects-- Servicing of on-going projects-160 Review of on-going projects-60 Executive summaries of 3 completed
projects have been put on website of the Ministry for dissemination of the
results. |
145. G.B. PANT
INSTITUTE OF HIMALAYAN ENVIRONMENT & DEVELOPMENT
(Rs. in Crores)
|
Name of the activity |
BE |
Actual Expdt. |
Physical Targets |
Physical Achievements |
Reason for short fall if
any |
|
G.B. Pant Institute of Himalayan Environment &
Development -
R&D and office expenditure - Construction of
Buildings |
6.30 (2.12)* |
2.99** |
Strengthening of R&D activities in
documentation of traditional knowledge systems, biodiversity and medicinal
plants, water and glacier studies, impact assessment and capacity building
under 7 identified core programmes in 4 units. |
The activities initiated in different regions of
Himalaya in identified areas. Traditional system data base is generated. The unit has been shifted in new campus and become
functional. |
Work area is restricted and new project initiation
is delayed due to insufficient manpower & funds. Water supply proposal delayed the shifting of
residences in Pangthang. |
|
Integrated Action Oriented
Eco-development Research Programme (IERP) for Himalayan Region |
0.70 (0.35)* |
0.19 |
Continuation
of on-going (R&D) projects and sanction of new projects in the Indian
Himalayan region and organization of
workshops and PEC meeting. |
Funds
for some on -going R&D projects were released and some of the projects has been completed successfully. |
Lack of
budget enhancement as requested. |
**
Additional amount spent from project funds.
146.
HAZARDOUS SUBSTANCES MANAGEMENT
(Rs. in
crores)
|
Name of the Activity |
BE |
Actual Expdt. |
Physical Target |
Physical Achievements |
Reasons for shortfall, if any |
|
Hazardous Substance Management |
7.00 (revised to 5.40) |
1.81 |
* |
** |
*** |
* Physical Target for 2004-2005
·
Finalisation of the comprehensive National Chemical Profile.
·
Continuation
of District Hazard Analysis and preparation of Off-site Emergency Plans.
·
Implementation
of GIS based Emergency Planning and Response Studies in selected industrial
pockets.
·
Continuation
of the project “Vulnerability and risk assessment of transportation of
hazardous chemicals in selected stretches/transport corridors”.
·
Setting
up of Emergency Response Centres as per modifications.
·
Providing
support to Poison Control Centres
·
Preparation
of National & State Inventories on hazardous wastes as per HW Rules 2003.
·
Provision
of support to the setting up of common facilities for Treatment, Storage and
Disposal of Hazardous Wastes (TSDF)
·
Inventorization
of illegal hazardous wastes dump sites & preparation of remediation plans for the same.
·
Harmonization
of hazardous wastes with the EXIM Policy to regulate import/export of the same.
·
Review
of Schedule 8 of the HW Rules to ensure that hazardous wastes listed in Annexe
8 of the Basel Convention are prohibited for import/export in phases.
·
Setting
up of Demonstration Plants for Management of Municipal Solid Wastes including
Plastic Wastes.
·
Guidelines/projects
on Fly-ash utilization.
·
Strengthening
of SPCBs/PCCs for effective implementation of various Rules on hazardous
substances management.
·
Continuation
of on-going project & studies on the 3 thrust areas and initiation of new projects/studies.
·
Continuation
of training programmes/awareness activities on important issues under the 3
thrust areas, as well as on various Rules & their amendments.
·
Effective
implementation of existing Rules. Amend
existing Rules, wherever necessary to strengthen and rationalise them.
·
Continuation
of work relating to preparation of Guidelines/Guidance documents for various
Rules.
·
Continuation
of fulfillment of obligations under the 3 international Conventions namely
Basel, POP and PIC.
·
Monitoring
of the activities of the ship breaking industry to ensure that it is done in an
environmentally sound manner.
·
Organization
of regular meetings of the Monitoring Committee & filing of quarterly
reports to the Hon’ble Supreme Court.
· Implementation of other time-bound tasks & activities in the area of hazardous waste management, contained in the directions of the Hon’ble Supreme Court in the matter of WP657/95, delivered on 14th October, 2003.
** Physical Achievements during 2004-2005 (upto 13.12.2004)
· Preparation of Off-site plans for new industrial pockets undertaken.
· Final draft report on remediation/reclamation of contaminated areas in Bichhri, Rajasthan received.
· Training programmes /workshops supported under chemical safety & emergency planning and management of hazardous wastes, biomedical wastes & municipal solid wastes.
· TSDF proposals from Karnataka, West Bengal & Haryana under examination.
· Final report on harmonization of hazardous wastes with the EXIM Policy of the country received and being examined.
· Hazardous Wastes (Management & Handling) Amendment Rules 2004, extending the time limit for switch over to environmentally sound technologies by used oil re-refiners up to 31st December 2004 notified on 19th July 2004.
· Studies on measurement of dioxins from incinerators of bio-medical waste management facility and plastic waste management being initiated.
· Proposals for setting up of demonstration plants for management of municipal solid waste being examined.
· Under the study “ A Preliminary Enabling Activity Project to prepare National Implementation Plan (NIP) for POPs” assigned earlier to ITRC, Luncknow with UNIDO as the executing agency under GEF assistance, ITRC has submitted a draft final report to the Ministry.
· Regular participation in the various Technical Meetings of the Basel, POP & PIC Conventions & follow-up action continued.
· The Supreme Court Monitoring Committee on hazardous wastes, constituted to oversee that the orders of the Supreme Court in WP657/95 are implemented in time, met 4 times during the year and filed two monitoring reports to the Court.
*** Reasons for shortfall, (2004-2005)
TSDF proposals from the States of Karnataka, West Bengal , Tamil Nadu and Haryana were expected to be received in the Ministry during 2004-05. However, none of the States have been able to submit comprehensive proposals inspite of regular interaction/communication. Some of the municipal solid waste management proposals were also not in a shape to be supported. Due to these reasons, the allocation of HSMD has been revised to Rs. 5.40 crores. The revised allocation is expected to be fully utilised.
147. BIODIVERSITY
CONSERVATION
(Rs. in crores)
|
Name of Authority |
BE |
Actual Expdr |
Physical Target |
Physical Achievements |
Reasons for shortfall, if
any |
|
Bio-diversity Conservation |
3.50 |
0.65 |
* |
** |
Shortfall in expenditure was largely due to less
expenditure by National Biodiversity Authority. |
*Physical Target
-
Framing
of Rules under the Biological Diversity
Act – 2002
-
Establishment
of National Biodiversity Authority
-
Implementation
of National Bio-diversity Strategy and Action Plan ( NBSAP);
-
Cartagena
Protocol on Biosafety.
-
Matters
relating to the Genetic Engineering Approval Committee ( GEAC), GM Food and
Transgenic Crops.
**Achievements:
-
The
Rules were notified.
-
A
National Biodiversity Authority has been
set up under the Act at Chennai.
-
The National Bio-diversity Strategy and Action
Plan ( NBSAP) reached its final phase;
-
Matters
relating to Cartagena Protocol on Bio safety were pursued.
-
Matters
relating to the Genetic Engineering Approval Committee
(GEAC),
GM Food and Transgenic Crops was pursued.
148. CONSERVATION AND
MANAGEMENT OF WETLANDS, MANGROVES AND
CORAL REEFS
(Rs. in Crores)
|
Name of the Activity |
BE |
Actual Expenditure |
Physical Targets |
Physical Achievements |
Reasons for shortfall, if any |
|
MAPs and
Research projects on Wetlands |
6.30 |
3.12 |
27 MAPs on Wetlands and ongoing research projects
on wetlands + 6-8 newly identified wetlands |
15 MAPs and 5 ongoing research projects . |
No
shortfall. |
|
MAPs and Research on Mangroves and Coral Reefs |
5.70 |
3.17 |
25 MAPs on Mangroves & 4 Coral Reefs |
|
|
149. BIOSPHERE RESERVES
(Rs. in Crores)
|
Name of Activity |
BE/RE |
Actual Expenditure |
Physical Targets (for the
entire year) |
Physical Achievements (up
to 31.11.04) |
Reasons for shortfall, if,
any |
|
MAPs and Research on BRs |
7.00
(including NE region) |
4.00 |
13
MAPs on BTs and 20 research projects |
10
MAPs on BRs and 10 research projects |
NIL |
150. INTERNATIONAL
COOPERATION
(Rupees in crores)
|
Name of the
activity |
BE |
Actual Exp. |
Physical
Target |
Physical
Achievements |
Reasons for shortfall, if
any. |
|
India Canada Environment Facility |
0.01 |
Nil |
The ongoing projects are implemented and are at various stages |
- |
- |
|
IC Division Activities. |
0.95 |
0.65 |
The existing activities will continue |
- |
- |
|
State of Environment Report. |
1.00 |
0.73 |
Organising
sensitization workshops, facilities upgradation in State Host Institutions. |
- |
- |
Achievements:
1) Organization of SAARC Meeting of Experts to strengthen Environment Management Infrastructure in New Delhi during 14-15 October 04.
2) Participated in the first and second meetings of
High Level Open Ended Intergovernmental
Working
Group on an Intergovernmental Strategic Plan for Technology Support and
Capacity
Building held at New York on 25/06/2004 and Nairobi from 2-4 September 2004
respectively.
3) Participated in Ad-hoc Expert Consultation for
bringing out the next Global
Environment Outlook Report (GEO-4) in Bangkok, Thailand from 20-21
September,
2004.
4) Meeting with various dignitaries coming from abroad held at the highest level in the
Ministry.
5) Participated in Seminar on Performance Based
Allocation Framework for GEF
Resources
from 27-28 September, 2004 in Paris, France.
6) India participated in the SAARC Technical
Committee and Sixth Ministerial
Meeting
on Environment, 11-13th June 2004 at Thimpu, Bhutan.
7) Participated in the GEF Council meeting held at
Washington from 19-21 May, 2004.
8) Nomination of officials for training abroad in the field of environment & forests.
9) Follow up on action points relating to
ESCAP/SAARC/EU/ADB/ World Bank and SACEP
matters.
10) Follow-up on the MoUs signed with countries such
as Germany, Russia, Turkmenistan,
Tajikistan, Vietnam, China, Israel and Iran.
11) Follow-up on the Agreement with United States
Environment Protection Agency
(USEPA)
for conduct of activities in the identified areas of cooperation.
12) Building a strong pipeline of new GEF proposal,
follow up and implementation of
approved GEF projects, to monitor and evaluate their progress.
13) Assessment of the funding objectives of various
lending and donor agencies (multilateral
and
bilateral) to facilitate access of more resources for projects.
14) Implementation of various sub-components of CIDA
assisted India Canada
Environmental Institutional
Strengthening Project, including Centre of Excellence on Environmental Science,
Policy & Technology.
15) India also actively participated in the various
Conference of parties /technical committee
meetings of the UN Framework
Convention on Climate Change, Convention on Biological Diversity, Basel
Convention on Transboundary Movement of Hazardous Wastes, Convention to Combat
Desertification, Montreal Protocol on Substances that deplete Ozone layer,
Ramsar Convention, Governing Council of Global Environment Facility.
16) Assisted State Governments through designated
national host institution in preparation of
State
of Environment Report.
17) Progress on the Indo-German Technical
Cooperation on Environment, viz. Advisory
Services in Environmental Management as scheduled.
18) Consultations with the World Bank for future
funding of environment project proposals.
151. ADAPTATION & CAPACITY BUILDING PROJECT
ON CLIMATE CHANGE
(Rs. in
crores)
|
Name of Activity |
BE |
Actual
Expdt. (upto
21.12.2004) |
Physical Targets |
Physical Achievements |
|
Adaptation & Capacity Building Project on
Climate Change |
1.00 |
0.58 |
Capacity
building at appropriate levels for taking Climate Change considerations in
social, economic and developmental planning. |
-
On going and some new projects relating to various issues relating to climate
change issues were funded. - Meetings
of Climate Change Core Group were held at regular intervals, under the
Chairmanship of Secretary (E&F) to discuss various issues relating to
climate change. -
A Inter-Ministerial delegation from India participated in the Subsidiary Body
Meetings and 10th COP to UNFCCC, held in Buenos Aires, Argentina
from 1-17
December 2004. -
Meetings of National CDM Authority were held periodically to consider the CDM
Projects for grant of Host Country approval.
Till date 37 project proposals have been accorded Host Country
Approval by the Authority. -
The 22 Plenary Session of Intergovernmental Panel on Climate Change was
hosted in New Delhi during 8 – 11 November 2004. Delegates from nearly all the countries participated in this
International Conference. |
|
|
|
|
Promotion
of scientific and technological research and systematic observation with a
view to furthering understanding of climate change. |
|
|
|
|
|
Hosting
of 22 Plenary Session of Intergovernmental Panel on Climate Change. |
152. ESTABLISHMENT OF ENVIRONMENT
AUTHORITIES, COMMISSIONS AND TRIBUNALS
(Rs. in Crores)
|
Name
of Activity |
BE |
Actual Expdt. |
Physical
Target |
Physical
Achievements |
|
Establishment
of Environment Authorities, Commissions and Tribunals |
5.00 |
1.14 |
To complete work as mentioned in their terms
of reference |
All the three Environment Authorities are
required to take action as per their terms of reference. |
153. WORLD BANK AIDED
INDUSTRIAL POLLUTION CONTROL PROJECT
The Project has ended on 30.11.2002 and its residual
activities have been merged with the World Bank aided EMCBTA Project.
154. COMMON EFFLUENT
TREATMENT PLANTS (CETPs)
(Rs. in Crores)
|
Name of the Activity |
B.E. |
Actual
expdt. |
Physical
Target |
Physical Achievements |
Reasons for shortfall, if
any |
|
Common
Effluent Treatment Plants |
4.00 |
4.00 |
Construction of CETPs in the Small Scale
Industrial clusters |
The amount has been fully utilized by providing
financial assistance for construction of CETPs in the small scale industrial
clusters. |
NIL |
155. REIMBURSEMENT OF WATER
CESS
(Rs. in Crores)
|
Name of the Activity |
B.E. |
Actual
expdt. |
Physical
Target |
Physical Achievements |
Reasons for shortfall, if
any |
|
Reimbursement
of Water cess |
76.52 |
76.52 |
NIL |
NIL |
NIL |
156. TAJ
PROTECTION MISSION
(Rs. in Crores)
|
Name
of the Activity |
B.E. |
Actual
Expdt. |
Physical
Target/Achievements |
Reasons for shortfall, if any |
|
Taj
Protection Mission |
1.00 (This was surrendered 9/04. |
Nil |
Nil |
No new proposal has been submitted by the Govt. of UP |
157. ALL INDIA COORDINATED PROJECT ON TAXONOMY
(AICOPTAX)
(Rs.in crores)
|
Name of the Activity |
BE |
Actual Expend |
Physical Targets |
Physical Achievements |
|
AICOPTAX |
2.00 |
.80 |
Servicing of the ongoing projects |
The ongoing projects were serviced. |
158. ENVIRONMENT MANAGEMENT CAPACITY BUILDING
TECHNICAL ASSISTANCE PROJECT
(Rs. in crores)
|
Name of the Activity |
BE |
Actual Expdt.
Upto 31.10.2004 |
Physical Targets |
Physical Achievements |
Reasons for shortfall |
|
INDIA:
ENVIRONMENTAL MANAGEMENT CAPACITY BUILDING TECHNICAL ASSISTANCE PROJECT |
25.26 |
5.85 |
* |
** |
*** |
* Physical
Targets
All the
activities included in the various sub-components of the project were of
continuous nature leading to environmental management capacity building in
India such as trainings, procurement of equipment, data generation through
computerization, publications of books/ monographs and holding of
seminars/conferences, preparation of reports in specific areas and funding of
research projects, Creation of web management, review of various
procedures/practices & environmental standards of industrial effluents
& emissions, and completion of pending activities under IPP Project.
** Physical
Achievements
The residual
activities of the project have been completed during the year including
overseas training under Mining were completed by the scheduled date of closure
of the project on 30.6.2004. The
residual activities of Industrial Pollution Prevention Project folded into the
capacity building project were also completed.
*** Reasons for
shortfalls
The delays that
have occurred during the initial two years in appointment of consultants and
finalization of Project Implementation Plans have impacted subsequent
progress. The project picked up good
progress during the last two years by way of close monitoring of progress, and
finding ways & means to remove obstacles and finalizing a clear perspective
plan.